Overview Articles
Mapping the Design Process for
Urban Ecology Researchers
ALEXANDER J. FELSON, MITCHELL PAVAO-ZUCKERMAN, TIMOTHY CARTER, FRANCO MONTALTO, BILL SHUSTER,
NIKKI SPRINGER, EMILIE K. STANDER, AND OLYSSA STARRY
Keywords: applied urban ecology, collaboration, interdisciplinary, design process, ecological design
T
he widespread impact of humans on ecosystems (Kareiva
et al. 2007) and the recognition that ecosystem services
are essential to the future of human survival have catalyzed
a shift in the field of ecology (Collins et al. 2010). Although
they are historically disengaged from cities (Martin et al.
2012), ecologists are seeking to become instrumental in
managing the built environment and studying its interaction with the natural world (Chapin et al. 2011, Palmer
2012). Building on foundational studies on topics such
as urban metabolism (Newcombe et al. 1978), vegetation
(Sukopp et al. 1990), remediation and restoration (Bradshaw
and Chadwick 1980), and gradients (McDonnell and Hahs
2008), researchers are advancing theory, methods, and practice in a relatively new field—urban ecology (Grimm and
Redman 2004, Pickett et al. 2011).
The city as a living laboratory for urban ecology presents
challenges for the conduct of research and the development of theories of the urban environment (Forman 2002,
Young and Wolf 2006, Pataki et al. 2011). These challenges
stem from the complex interplay of the biophysical, socioeconomic, and political processes that affect how the
built environment itself is shaped (Ernstson et al. 2010).
Working in this context, urban ecology researchers require
frameworks for their input into these processes so as to
facilitate research and its role in shaping sustainable urban
environments (Cadenasso and Pickett 2008, Miller et al.
2008, Musacchio 2009, Palmer 2009). Researchers also
require entry points into the process of shaping cities such
that they can establish sufficient replication and control
to ensure the quality of the experimental design (PavaoZuckerman and Byrne 2009).
Designers, engineers, and planners already rely on scientific information that they, along with environmental
consultants and scientists, have adapted to the design
process (e.g., McHarg 1967, Spirn 1984, Johnson and Hill
2002, Forman 2008; also see www.sustainablesites.org).
Although environmental consultants have played an important role in this process (Azerrad and Nilon 2006, Pouyat
et al. 2010), they typically do not conduct primary experimental research, nor do they frequently have the flexibility
to do so. Moreover, they often draw their “best available
science” from past research on nonurban sites (Pataki et al.
2011), even though the assumptions underlying nonurban
systems may not necessarily directly apply to urban areas
(Collins et al. 2010). Furthermore, although rapid assessments are commonly used to evaluate sites and inform
design decisions, the timing and budget constraints all
too often compromise the accuracy of these assessments.
Rapid assessments can fill crucial gaps in the face of
land-use change, but their methods are yet to be fully
validated (Kareiva et al. 1999). Given the growing demand
for environmental consultants to both address regulatory
concerns and provide ecological input on urban sustainable design projects (Meyer et al. 2010, Nassauer 2012),
the time is ripe for urban ecology researchers to forge
partnerships directly with designers (Felson et al. 2013a;
http://lafoundation.org/research/case-study-investigation).
Therefore, urban ecology researchers could use the design
BioScience 63: 854–865. ISSN 0006-3568, electronic ISSN 1525-3244. © 2013 by American Institute of Biological Sciences. All rights reserved. Request
permission to photocopy or reproduce article content at the University of California Press’s Rights and Permissions Web site at www.ucpressjournals.com/
reprintinfo.asp. doi:10.1525/bio.2013.63.11.4
854BioScience•November 2013 / Vol. 63 No. 11
www.biosciencemag.org
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
The integration of research into the design process is an opportunity to build ecologically informed urban design solutions. To date, designers
have traditionally relied on environmental consultants to provide the best available science; however, serious gaps in our understanding of urban
ecosystems remain. To evaluate ecosystem processes and services for sustainable urban design and to further advance our understanding of social–
ecological processes within the urban context, we need to integrate primary research into the urban design process. In this article, we develop a
road map for such a synthesis. Supporting our proposals by case studies, we identify strategic entry points at which urban ecology researchers can
integrate their work into the design process.
Overview Articles
Design process phases
The design process is multifaceted, creative, nonlinear, and
iterative (e.g., McHarg 1967, Halprin 1970, Rittel 1984, Wall
1999). In United States–based projects, a landscape, urban
design, architectural, or engineering team typically leads the
process, with consultants contributing at different stages.
These stages can be generalized into five phases, each varying
in cost and duration: contract, evaluation, design, construction, and postoccupancy (figure 1).
The client issues a request for proposals, a request for
qualifications, or a competition brief and invites consultants
to bid. Once a bid is accepted or awarded, the contract is
drawn up. Contract negotiations include the determination of the project team, program, time frame, services and
deliverables to be provided by each consultant, schedule,
cost, and method of payment. Contracts are legally binding
instruments. Amendments have cost implications.
Site evaluation can be perfunctory or extensive. It involves
research, analysis, and synthesis of site history and context
(e.g., utilities, zoning, circulation), physical and biological
features (e.g., topography, water conditions, vegetation,
soil quality, habitats), cultural elements, and other factors.
Together, these inform and determine the general location, constraints, and opportunities to be further explored
through the design process (Lynch and Hack 1984, LaGro
2001). In this phase, environmental consultants conduct
their assessments and submit their reviews or environmental impact statements to the relevant agencies for approval
(Alter 2012). Environmental consultants usually rely on
www.biosciencemag.org
available biological information and limited monitoring and
rarely apply hypothesis-driven research (Pouyat et al. 2010).
Outreach and stakeholder communication may also be initiated and may continue over the course of the project.
Three drawing submittals drive the design phase: the
schematic design, the design development, and the construction documents with specifications. Each submittal package
marks the resolution of an increasing level of specificity of
detail and allows the project estimator to periodically refine
the budget. Environmental consultants are typically invited
to review the design and to provide advice on reducing
environmental impacts and addressing related concerns.
The team then modifies the project components in response
to budgetary constraints, a procedure known as value
engineering (Harris and Dines 1998).
On completion of the construction documents, the
project is sent out to bid. The client uses various criteria to
select a contractor, including the project scope, contractor
experience, proposed fees, and the type of client. During
construction, the design team typically oversees the contractor’s execution of drawings and specifications. When
construction is near completion, the designer conducts a
walk-through inspection and prepares a punch list to identify the remaining tasks (Harris and Dines 1998). Once these
tasks are completed, the client signs off on the punch list and
accepts the project.
Designers are occasionally involved postconstruction
through commissioning stages of the built project. This
is usually specific to the performance of materials and
equipment or other functional aspects of the built work.
Otherwise, designers are not involved in postoccupancy
phases. Qualitative success metrics have been used in the
past to assess ways in which people use designed spaces
and buildings (Halprin 1970, Whyte 1980, Lynch and Hack
1984). Contractors usually include a limited-time guarantee
on a project. However, with the increased interest in postconstruction monitoring and commissioning, researchers
are likely to become more involved in this phase (www.gbci.
org/main-nav/building-certification/leed-certification.aspx).
Entry points for urban ecology researchers in the
design process phases
Each phase of the design process presents opportunities for
researchers to participate in urban design projects (box 1).
The most crucial entry point is the contract phase, in
which the researcher can negotiate inclusion on the design
team and can seek to define the time frame, budget, and
deliverables as components of the scope of work. In addition, the researcher can press for multiyear funding of postconstruction monitoring to cover postconstruction research
costs.
Urban ecology researchers can also advocate for the integration of research into the design process at the evaluation
phase (Alter 2012). The typical compressed time frame of
this phase does not currently facilitate primary research,
but it does not necessarily preclude it. The challenge for
November 2013 / Vol. 63 No. 11•BioScience855
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
process as a framework for engaging with cities (Felson
2013).
In the present article, we distinguish the urban ecology
researchers from others involved in the design process
on the basis of their ability to establish hypothesis-driven
research and monitoring protocols, to formulate theories
relating to urban ecosystem interactions and rigorously test
them, and to participate in cross-disciplinary design collaborations. The term urban ecology researcher here refers
to research ecologists, research engineers, and social science
researchers. We demonstrate how urban ecology researchers
can integrate their work into urban development projects
through the designed experiments approach (i.e., controlled
experiments shaped as designed landscapes), whereby
researchers work with designers to generate real-world, sitespecific data while also influencing the process and the outcomes of urban design and landscape architecture (Felson
and Pickett 2005, Felson et al. 2013b). First, we outline the
design process for both public and private urban projects
(figure 1). Next, we suggest key entry points in the design
process at which researchers can integrate urban ecological
research into urban designs (box 1). We follow with two case
studies that highlight strategies for integrating and strengthening research goals (figure 2). Using examples from the case
studies, we conclude with a summary of lessons learned for
moving forward.
Overview Articles
856BioScience•November 2013 / Vol. 63 No. 11
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
www.biosciencemag.org
Figure 1. A road map illustrating the current duties of research ecologists, environmental consultants, and engineers in the design process and how those duties overlap with
those of designers. For clarity, many of the typical participants in the design process are not included (e.g., the client, contractor, cost estimator, regulators or stakeholders).
Contractors are included in the bottom row for engineer–designer in order to illustrate the typical relationship (compare with figure 2). Abbreviations: CD/SPEC,
construction documents and specification; CO, contract; DD, design development; H0, creation of a null hypothesis; RFP, request for proposals; SD, schematic design.
Overview Articles
Box 1. The proposed involvement of urban ecology researchers at different stages of the design process.
Initial contact
Follow the money and identify project opportunities and possible clients (e.g., developers, landowners, managers). Meet with them to
understand their goals and cultivate ways in which research could benefit their interests. Develop research that feeds the value of ecological science for informing urban projects. Partner with organizations (e.g., nongovernmental organizations, nonprofits, government
agencies) working with communities on urban environments to encourage research. Enter design competitions as consultants on teams
(e.g., www.worldlandscapearchitect.com). Identify relevant requests for proposals and reach out to design firms to propose partnerships.
Contract
Define the ecologist’s deliverables, including the time frame and budget, as a component of the scope of the work to clarify the role
that the urban ecology researcher will play during contract negotiations. Structure the timing of the research to ensure that some of
the findings can inform the design process. Baseline data for research can also contribute to the evaluation phase during the design
process. Avoid underselling the research contributions. Identify contingency funds as a backup for potential costs attendant to construction so as to avoid compromising on the rigor and quality of the research. Attend initial meetings to assert the value of research
for site evaluation and design.
Design
Engage with designers on decisions that will affect the research and on design decisions that the research results may inform. Orient
the objectives of the research to study and to shape sustainable design solutions and to better position and translate basic and applied
ecological research to function as drivers of the form, layout, and program (intended use) of the site. Apply as is appropriate the
designed experiment approach, which incorporates applied research goals into the design and layout of projects and facilitates additional experiments for adaptive management.
Construction
Go through the client to emphasize to the contractor the need for consistency in craftsmanship and for a reduction of variables during
the experiment’s setup. Clearly identify the purpose and needs for constructing a designed experiment to the contractor. Engage the
contractor early to communicate your research goals, to identify areas of concern or clarification, and to seek advice on cost-saving
measures. Build mock ups to ensure clear communication about the design configuration and performance of the project.
Postoccupancy
Expand urban researchers’ focus from postconstruction research (the typical purview of ecologists who target existing built environments) to include hypothesis-driven research that informs the design, construction, and postoccupancy of projects. This avoids the
inherent issues of nonreplicable one-off designs that lack controls. Establish a postconstruction maintenance and operations plan to
be put into practice for the long-term, in order to ensure commitments to the research over time, especially as the project transitions
to public or private ownership. Identify and engage the ultimate owner early to help instill an understanding and a sense of ownership
in the project and to encourage long-term stewardship. Address long-term maintenance funding issues, which plague parklands and
will, likewise, negatively affect research experiments.
researchers is convincing clients, who tend to fund projectspecific information gathering more often than basic research,
to support hypothesis-driven research as a complement to
rapid assessments and as a means to surmount regulations
or other obstacles (Kareiva et al. 1999). To do so, researchers can explore partnerships with academic institutions to
access grants and fellowships and also as a way to extend the
scope and rigor of site evaluation, including baseline data
collection (Shirk et al. 2012). Researchers must demonstrate
how their research can balance cost, time, and the information relevant to decisionmaking; can respond to the myriad
agents affecting the conduct of urban research, including
www.biosciencemag.org
political social and regulatory needs (Shirk et al. 2012); and
can reduce variables, establish replication, and provide control studies.
The next crucial entry point is the design phase. This is
a definitive stage for the project, in which designers will
make most of the decisions that will affect the potential
for research integration. Researchers can pursue designed
experiments (Felson and Pickett 2005, Felson et al. 2013b)
and can orient the objectives of research toward studying
and shaping sustainable design solutions and toward better positioning and translating basic and applied research
to function as drivers of the form, layout, and program of
November 2013 / Vol. 63 No. 11•BioScience857
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
Evaluation
Emphasize the limitations of urban data and the need for experimentation. Negotiate a time frame adequate for gathering baseline
data. Negotiate for hypothesis-driven research as an alternative to rapid assessments. Explore partnerships with academic institutions
so as to extend the scope and rigor of baseline data assessment and to tap into potential sources of funding through grants and fellowships. Examine hybrid research and rapid assessments to balance the costs, time, and information relevant to decisionmaking. Prioritize
research methods such as before-and-after or comparative studies that respond to the challenges of working on urban sites, such as
navigating politics and establishing control studies. Select sites strategically to generate greater control over the data and to reduce
permit requirements (e.g., prioritize sites remote from typical urban conditions).
Overview Articles
858BioScience•November 2013 / Vol. 63 No. 11
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
www.biosciencemag.org
Figure 2. Case studies illustrating the role of the participants in the design process. Abbreviations: CD/SPEC, construction documents and specification; CO,
contract; DD, design development; H0, creation of a null hypothesis; NY-CAP, New York City Afforestation Project; RFP, request for proposals; SD, schematic design.
Overview Articles
Case studies
The case studies below illustrate ways in which ecologists
have established experiments as components of urban systems. The first is an example of a researcher-driven project
to establish an experiment configured as a functional parking lot. The second is a designer-driven project that leverages
a large-scale urban forestry initiative for the construction
of a long-term urban forestry research experiment as a
designed public park.
Permeable pavement parking lot research and demonstration
site. The Edison Environmental Center’s green parking lot
project, in Edison, New Jersey, illustrates one strategy for
integrating full-scale, long-term experiments into urban
sites in order to guide real-world applications (figure 3).
US Environmental Protection Agency (USEPA) environmental researchers analyzed the performance of multiple
porous pavement surfaces in a full-scale parking lot and
an associated series of rain gardens, designed to serve as a
research and demonstration site (figure 2). They established
hypothesis-driven research objectives and sought to reduce
variables, in order to empirically test the viability of green
infrastructure for storm water runoff reduction and pollutant removal.
The researchers were engaged in the design process
(box 1) from contract to postconstruction. Their consistent
involvement throughout demonstrated the role for researchers and the benefits of integrating research in each phase of
the design process. At the outset, they convinced the USEPA
to prioritize the transformation of a traditional parking
lot to a “green” parking lot years ahead of the agency’s
schedule. Because it was a green project, the researchers’
technical expertise in storm water management practices
Figure 3. Plan of the permeable pavement parking lot demonstration at the Edison Environmental Center, with vertical
cross sections of permeable zones. Portions of the parking rows infiltrate to subgrade soil, whereas others are lined and
drain to the collection tanks. Abbreviations: AASHTO, American Association of State Highway and Transportation
Officials; CM, centimeters; HDPE, high-density polyethylene.
www.biosciencemag.org
November 2013 / Vol. 63 No. 11•BioScience859
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
the site. Prior to construction, articulating the experimental
design parameters to the contractor is essential. To do so,
researchers should gain client support and ensure that this is
communicated to the team in order to gain credibility and
standing, and they should engage with contractors early to
communicate research goals, to identify areas of concern
or clarification, and even to seek advice on cost-saving
measures.
Postconstruction is the current domain of urban ecology
researchers (Felson et al. 2013b). However, as was outlined
above, there are other opportunities to expand researchers’
focus beyond postconstruction research to include hypothesis-driven research from the outset of the design process
or preconstruction. At the postconstruction phase, the final
steps for researchers should include establishing a postconstruction maintenance and operations plan to ensure
long-term commitments to the research, especially as the
project transitions to public or private ownership. In addition,
leveraging grants to cover postconstruction maintenance
and monitoring will help to avoid a portion of the compromises on the rigor and quality of the research. The researchers could identify and engage the ultimate owner early to
help instill an understanding of and a sense of ownership in
the project and to encourage long-term stewardship.
Overview Articles
860BioScience•November 2013 / Vol. 63 No. 11
garden media composition, and an assessment of soil permeability and hydrology. Although most design projects
have limited time frames and budgets that constrain site
evaluation, in this case, the extensive site evaluation was
integral to the experiment. These analyses overlapped with
the contract and design phases, because the site assessments
and bench-scale tests informed the conceptualization of the
parking lot and research project. Technical questions and
challenges that arose during the design phase triggered additional assessments and tests.
The goals of the design included building a functioning, permeable parking area as a research experiment to
test the hydrologic and pollutant-removal performance of
three different types of permeable pavement. In order to
provide guidance to state and federal regulators regarding
the minimum rain garden size, the research team designed
experimental rain garden cells associated with the parking
lot at 2%, 4%, and 8% (with replication) of the size of the
impervious driving surface upslope of the rain gardens.
During the design of the parking lot, the researchers had
to ensure that the constructability and uniformity of the
experimental setup, postoccupancy access to buried research
instrumentation, and the necessary experimental controls
(e.g., equal-size impervious driving surfaces to provide
equivalent volumes of runoff to the permeable parking surfaces). The research team met face to face with the design
firm in order to align the construction drawings with the
research objectives and to ensure the necessary detail in
the construction notes. In this way, they avoided damage to
buried research instrumentation and limited the production
of sediment that could clog geotextiles and aggregate layers and could prevent the infiltration of storm water to the
underlying soil.
During the construction phase, the research team supervised the contractors and coordinated with the design firm
that was legally responsible for supervising this phase. The
prime construction contractor had been solicited through
a bidding process and had no experience constructing a
green parking lot—much less one with subsurface monitoring equipment. Consequently, coordination was ongoing
between the researchers and the prime and subcontractor
teams. Not surprisingly, problems arose during construction
that were related to accommodating the research objectives
and instrumentation. The research team and the design
firm collaborated periodically to modify the design elements, brainstorming and testing engineering solutions to
solve the problems and achieve the research objectives; for
this reason, the design process extended into the construction phase. This adjustment required additional time to
ensure proper installation of the monitoring equipment, to
redesign control and drainage structures, and to coordinate
all of the participants involved in the research, design, and
construction.
The 6-month construction phase and the cost were both
greater than those of a typical parking lot. Facilitating the
coordination and complementarity of the research design
www.biosciencemag.org
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
was essential, which gave them leverage to accommodate
research and monitoring objectives and physical components of the experimental research project in the design.
This inclusion resulted in an expanded evaluation phase, a
requirement that the researchers approve all design drawings, on-site supervision of multiple contractor teams by the
researchers during construction, and continued researcher
input into the postoccupancy maintenance regime of the
parking lot, including ice and snow removal, vacuuming
of the permeable parking surfaces, and rain garden plant
maintenance. During construction, the researchers’ control
of the design and coordination was crucial for implementing
the research component of the project. The involvement of
researchers from the outset ensured a robust experimental
design for generating data on the performance of rain gardens and porous surfaces (Rowe et al. 2010). This data can
inform storm water regulations, facilitate innovative efforts,
and position the USEPA to act as an honest broker in evaluating permeable and traditional parking surfaces and rain
garden design parameters.
Although the project prioritized research goals, and thus
differs from a traditional parking lot design, the Edison case
illustrates the necessity of involving researchers early and
throughout the design process, particularly during the initial
phases from contract to design. Without such involvement,
aligning research goals with design goals would require
renegotiating at a later stage, with extra cost implications
as well as the likelihood of considerable compromise of
research rigor.
USEPA researchers worked with the USEPA facilities staff
to conceptualize a parking lot experimental design that
accommodated the research objectives of the research team,
was fully functional, and was environmentally friendly. The
agency then engaged contractors on the basis of a request
for proposals, as in the initiation of a traditional project.
No negotiation of research objectives was necessary, because
the purpose of the request for proposals was the build out
of a functioning parking lot designed as a research and
demonstration site (Rowe et al. 2010). Moreover, because
the site itself is government owned and the project is part
of a long-term, government-sponsored research program,
few issues arose related to the prioritization or siting of the
research. Several functional design elements were actually
adjusted to accommodate the green design and research
agenda. For example, the facilities and research teams agreed
to “overdesign” the parking lot; they incorporated a greater
depth of subbase layers than is normally specified in a permeable pavement parking lot to allow for more subsurface
storm water storage and thus to minimize the risk of surface
ponding, even during a severe storm. In addition, the parking lot was undersized in terms of the number of parking
spaces in order to ensure that the three permeable parking
surfaces would be fully used on a daily basis.
Over the period of 1 year prior to groundbreaking, the
researchers conducted baseline data analyses, bench-scale
tests of design elements such as geotextile type and rain
Overview Articles
and construction required an iterative process of construction monitoring and troubleshooting, with a high degree
of teamwork, timely communication, patience, and mutual
respect and trust.
Initially considered in 2007 and completed in 2009, the
project provides a research site for the long-term monitoring
of hydrologic and pollutant-removal performance in different permeable pavement surface types and in rain gardens
of varying sizes. The researchers are also investigating the
impacts of seasonality, life cycle, and maintenance protocols on hydrologic and pollutant-removal performance.
Instruments regularly monitor the soil moisture, wettingfront dynamics, and temperature. Water quantity and quality sampling has been conducted on a monthly basis since
the opening of the parking lot in the fall of 2009.
Afforestation Project (NY-CAP) illustrates one strategy
for achieving a long-term urban forestry research experiment embedded in a public green infrastructure project.
The design team worked with the client, the New York City
Department of Parks and Recreation (NYCDPR), and a
voluntary science advisory board to establish hypothesisdriven research and an experimental design to evaluate the
impacts of varied site preparations and plant diversity on
ecosystem functioning—carbon dynamics, invasion dynamics, species recruitment and turnover, and the time to
canopy closure—to test the performance and persistence of
a constructed native urban forest (Felson et al. 2013a).
Bringing the client on board with the research required
aligning the research goals with crucial management issues,
with the NYCDPR time frame for implementation, and with
community expectations for a public city park. Indeed, the
time frame and budget for the design project did not allow
for an optimized baseline assessment. Therefore, during
the evaluation phase, during which extensive baseline data
might have been collected, the researchers were restricted
to seeking limited improvements to the rapid assessment
approaches typically used by the NYCDPR. This limitation
and others arose from political pressures for rapid implementation and high success rates. Nurseries were hardpressed to produce the large volumes of saplings sought for
planting, given the short notice and the risks associated with
investing upfront in land and years of labor to produce the
trees. Nonetheless, during the contract phase, the design
team successfully proposed a project scope and priorities
that expanded the client’s original intent for constructing
a native urban forest from simply monitoring tree survival
into a broader experimental research initiative to study the
health and resilience of a planted forest.
Involving designers with ecological knowledge and experience setting up experiments in the contract phase helped
situation experimentation as a component of the project,
creating multiple entry points for subsequent phases. The
design and construction phases provided the greatest integration, with flexibility in both the design process and the
www.biosciencemag.org
November 2013 / Vol. 63 No. 11•BioScience861
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
The MillionTreesNYC afforestation study. The New York City
design of the experiment, which allowed the designers and
researchers to work iteratively with the client and contractors toward establishing viable research within the built
ecosystem (Felson et al. 2013b). The partnership during the
design and construction phases led to the establishment of
an urban forestry experiment that enhanced the original
goals of the request for proposals. With the execution of
the designed experiment across two pilot sites and in locations citywide as part of the MillionTreesNYC initiative
(www.milliontreesnyc.org/html/about/parks_planyc.shtml), a
number of academic institutions became heavily involved in
research on the sites (e.g., McPhearson et al. 2010), affording the researchers access to an experimental layout and
locations not available through traditional academic sources
and bringing funding and resources to the initiative. This
successful transition from a design process into a research
program illustrates the kinds of opportunities that researchers have in working with designers to implement urban
ecological research.
NY-CAP used capital investments from PlaNYC 2030,
New York City’s sustainability plan, to fund the design and
construction of a large-scale urban forestry experiment.
The request for proposals included a general request for
monitoring. The design team persuaded the city to pursue
hypothesis-driven ecological experiments that assess patterns of forest performance and to evaluate NYCDPR
management practices, with the intent of collecting data
that would better inform future park management practices
and capital decisions. These research goals were raised in
response to the request for proposals; however, the contract
and budget did not include an experimental design component. Therefore, the research had to be embedded within the
design process at no extra fee. On completion of the design
contract in 2009 (and after the establishment of the experimental layout), academic institutions were invited to establish direct relationships with NYCDPR so as to further refine
the experimental design and research protocols (Felson et al.
2013a).
Large-scale land assessment and site categorization drove
the original site evaluation in 2008. Like those of most
design projects, the evaluation practices fell short of the level
that a research ecologist would require for baseline data.
The brief contract time line (approximately 1 year) and low
budget constrained the options for establishing effective
baseline analyses. For consistency, the team followed the
NYCDPR “entitation” practice, relying on a rapid characterization of the dominant vegetation, soil type, and adjacent
conditions (Natural Resources Group 1988). Extensive geographic information system and ground-truthing analysis,
along with city agency outreach, informed the site selection
for 2000 acres of potential afforestation sites.
An academic partnership with Yale University in 2009
allowed for a second phase of ecological analysis that included
baseline assessments preconstruction for research purposes. This ongoing research program includes one season of preconstruction soil analysis and vegetation cover
Overview Articles
862BioScience•November 2013 / Vol. 63 No. 11
practices and other metropolitan tree initiatives. The experimental design of the site provides a platform for additional
research, including nematode and wood-decomposition
studies currently under way.
Summary of urban ecology researchers and the
design process
At present, the environmental consultant fills a crucial role in
providing scientific input on design projects. However, that
input is limited to certain phases of the design process and
geared toward addressing regulatory concerns and facilitating
the meeting of design goals. Researcher- and designer-driven
projects create a markedly different and complementary role
for the urban ecology researcher (Dorney 1973, Johnson and
Hill 2002, Felson and Pickett 2005).
These case studies begin to answer the question of how
researchers can initiate contact with project managers when
the structures or links for that contact are not already in
place (box 1). Convincing project designers of the value of
research and coordinating the research with project timing
are essential. Engaging with multiple stakeholders through
partnerships (e.g., Redman et al. 2004) and addressing issues
such as private property rights, zoning, and human subject
research are valuable steps toward positioning ecologists to
work in an urban context. Additional steps include developing institutional knowledge around professional practice
and even modeling applied ecology after the professional
role that designers or engineers currently play.
We argue that researchers can tailor their approaches
to a variety of projects, sizes, locations, and management
structures (box 1). First, we emphasize the value of involving
researchers from the start of the design process and during
contract negotiation to ensure that research goals are a part
of the request for proposals. Pursuing designed experiments
and situating the research experiment as a feature of the
design project is one strategy (Felson and Pickett 2005).
Second, the researcher and the design team must strike
a balance between design and research goals during the
design process. Third, involvement during the construction
phase is crucial for ensuring that the experimental design is
implemented properly. Fourth, and linked to the balancing
of goals, the research results must feed back into the design.
Fifth, to further contribute to the build up and dissemination of scientific knowledge of urban systems, the results
must be published in both the science literature and publicly
accessible publications.
The nature of the design process—creative, flexible,
and iterative—provides a suitable platform to accommodate the role of urban researchers to conduct basic research
(Felson et al. 2013a). It also supports a more transformative
role for researchers to participate in the management and
shaping of urban systems (Felson et al. 2013b). Within the
design process, the transition from evaluation to schematic
design marks a fundamental shift in intention, from seeking
to understand how a system works to systematic modification and improvement of that system over time. This
www.biosciencemag.org
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
studies executed in 2009. The project includes two additional years of soil analysis, 3 years of tree performance
studies, and 2 years of species recruitment studies, with
plans for ongoing research (Felson et al. 2013a). In the case
of NY-CAP, scientific input informed the project design at
crucial intervals. The researchers shared their perspective
and worked toward common goals with the designers and
park managers. The researchers played a crucial role not
only in defining the research needs but also in translating
those needs into an experimental design layout. At the same
time, the research goals demanded compromises. Rather
than planting the widest selection of possible species in the
research plots, the team planted plots with either two or six
species, with the goal of reducing variability and establishing
low-diversity and high-diversity configurations for testing
biodiversity. Building on management questions, the species
richness set up was then crossed with stand complexity (with
shrubs and herbs versus without), and soil amendment
(with compost versus without).
The NYCDPR expressed concerns that experimental plots
situated in public parks would be unattractive. Embedding
the research plots within clusters of trees and surrounding
these areas using a picturesque planting helped to diffuse
the research grid (figure 4). Redesigning the typical plot
grid as a naturalistic plot, with patches of trees and shrubs,
proved to be a win–win scenario; rather than a focus on
the plot scale as the experimental unit, each plot now
included six interior quadrats of 24 trees, for a total sample
of 336 quadrats across the 56 plots (figure 4). This layout
supported park usability and fit the restoration goals of the
NYCDPR.
The relationship between the contractor and the research
team proved crucial for the implementation of the experiment. Although the contractor selection followed the normal
protocol for public contracts, the contractor was brought in
early and proposed additional cost-saving measures. The
contractor educated himself on the larger research goals and
actively sought to simplify the layout and implementation
strategies in order to reduce variability in the plot establishment, which helped to avoid change orders and other
costly pitfalls. The research team added greater detail to the
construction documents and specifications that were developed by the design team and constructed mock-ups (built
templates) prior to construction.
The NY-CAP functions as a long-term research project
linked to public parkland. Yale’s involvement in the pre- and
postoccupancy research has ensured continuous monitoring and data collection that are used to study basic
questions in urban land-use change about native ecosystems, with a focus on vegetation dynamics, soil biology,
biogeochemistry, and above- and belowground linkages.
Relevant data results will be conveyed for applied management practices and made public over time through a data
clearinghouse. Some of the preliminary results may influence the MillionTreesNYC initiative; however, most of the
research will likely be used to influence future management
Overview Articles
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
×
×
×
×
Figure 4. The research site and plots for the New York City Afforestation Project. The plots were originally designed as
a randomized grid. The revised plots were designed as an offset grid, with patches of similar species embedded within
each plot. These naturalistic plots were designed to address an aesthetic demand from the New York City Department
of Parks and Recreation. The revised plots also improved the sampling options at the subplot level. The diamonds in
the second panel represent shrub species (see the Professional Biologist article beginning on p. 882 for more detail).
Abbreviation: B&B, balled and burlap, a method of tree planting.
www.biosciencemag.org
November 2013 / Vol. 63 No. 11•BioScience863
Overview Articles
transition from assessment to conceptual design occurs early
at the end of the evaluation phase and early in the schematic
design phase. Developing the role of the researcher in the
design process provides a valuable learning opportunity
for ecologists to shift from studying to shaping ecosystems
(Pickett and Cadenasso 2008) and thus to shaping society
(Chapin et al. 2011).
Acknowledgments
We thank the Urban Watershed Management Branch of
the US Environmental Protection Agency’s National Risk
Management Research Laboratory, particularly Michael
Borst, Thomas O’Connor, and Amy Rowe, and PARS
864BioScience•November 2013 / Vol. 63 No. 11
References cited
Alter B. 2012. Environmental Consulting Fundamentals: Investigation and
Remediation. CRC Press.
Azerrad JM, Nilon CH. 2006. An evaluation of agency conservation guidelines to better address planning efforts by local government. Landscape
and Urban Planning 77: 255–262.
Bradshaw AD, Chadwick MJ. 1980. The Restoration of Land: The Ecology and Reclamation of Derelict and Degraded Land. University of
California Press.
Cadenasso ML, Pickett STA. 2008. Urban principles for ecological landscape
design and management: Scientific fundamentals. Cities and the Environment 1 (art. 4).
Chapin FS III, et al. 2011. Earth stewardship: Science for action to sustain
the human–Earth system. Ecosphere 2 (art. 89).
Collins JP, Kinzig A, Grimm NB, Fagan WF, Hope D, Wu JG, Borer ET. 2010.
A new urban ecology: Modeling human communities as integral parts
of ecosystems poses special problems for the development and testing
of ecological theory. American Scientist 88: 416–425.
Dorney RS. 1973. Role of ecologists as consultants in urban planning and
design. Human Ecology 1: 183–200.
Ernstson H, Barthe S, Andersson E, Borgström ST. 2010. Scale-crossing
brokers and network governance of urban ecosystem services: The case
of Stockholm. Ecology and Society 15 (art. 28).
Felson AJ. 2013. The design process as a framework for collaboration
between ecologists and designers. Pages 365–382 in Pickett STA,
Cadenasso ML, McGrath B, eds. Resilience in Ecology and Urban
Design: Linking Theory and Practice for Sustainable Cities. Springer.
Felson AJ, Pickett STA. 2005. Designed experiments: New approaches to
studying urban ecosystems. Frontiers in Ecology and the Environment
3: 549–556.
Felson AJ, Oldfield EE, Bradford MA. 2013a. Involving ecologists in shaping
large-scale green infrastructure projects. BioScience 63: 882–890.
Felson AJ, Bradford MA, Terway TM. 2013b. Promoting Earth stewardship
through designed experiments. Frontiers in Ecology and the Environment 11: 362–367. doi:10.1890/130061
Forman RTT. 2002. The missing catalyst: Design and planning with ecology
roots. Pages 85–109 in Johnson BR, Hill K, eds. Ecology and Design:
Frameworks for Learning. Island Press.
———. 2008. Urban Regions: Ecology and Planning beyond the City.
Cambridge University Press.
Grimm NB, Redman CL. 2004. Approaches to the study of urban ecosystems: The case of Central Arizona—Phoenix. Urban Ecosystems
7: 199–213.
Halprin L. 1970. The RSVP Cycles: Creative Process in the Human Environment. Braziller.
Harris CW, Dines NT. 1998. Time-Saver Standards for Landscape Architecture, 2nd ed. McGraw-Hill.
Johnson BR, Hill K, eds. 2002. Ecology and Design: Frameworks for
Learning. Island Press.
Kareiva P, et al. 1999. Using Science in Habitat Conservation Plans. National
Center for Ecological Analysis and Synthesis.
Kareiva P, Watts S, McDonald R, Boucher T. 2007. Domesticated nature:
Shaping landscapes and ecosystems for human welfare. Science 316:
1866–1869.
LaGro JA Jr. 2001. Site Analysis: Linking Program and Concept in Land
Planning and Design. Wiley.
www.biosciencemag.org
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
Conclusions
The process of integrating research into design and of
reorienting the researcher’s role from studying to shaping the environment requires compromises; it also allows
for the expansion of research opportunities in urban systems, which are currently understudied and in which controlled research is limited. This reorientation can enable the
researcher to advance the agenda for more-robust research
in the urban context. Our road map (box 1) shows what
institutional buy-in is necessary at certain stages to produce
the best hybrid (i.e., design–research) results. The case studies presented above also illustrate how to overcome some
of the incompatibilities between ecological research and
urban design practices.
Expanding the researcher’s role in the design process has
the potential to integrate current research into the design
and management of the urban built environment and to
establish a new paradigm for both studying and actively
shaping urban ecosystems. Currently, the concerns outweigh the perceived benefits of integrated research among
private funding agencies involved in land development—
specifically, they fear that research is time consuming and
is not easily contained within the design process or budget.
There are also concerns about the limited application of
research results to management issues. In confronting these
concerns, urban ecological researchers will need to actively
assert the value of ecological science, research, and experimentation in urban design projects. To this end, urban
ecologists will need to address the broader objective that
their research will accomplish; principally, although basic
ecological research is used to study a system, and design is
used to shape the system, the urban ecology researcher will
benefit both from studying a system in order to better shape
that system and from shaping a system in order to better
study it. Coordinated research and knowledge exchange,
advanced data and information sharing, and new research
technologies, as well as education and public outreach
strategies, will all support the growth of urban ecology
and the integration of ecological principles into the design
process, ultimately providing the baseline data and proof of
concept to implement tested urban sustainability strategies
worldwide.
Environmental for their contribution to the Edison
Environmental Center parking lot study. We thank the
New York City Department of Parks and Recreation
and particularly the Natural Resources Group and the
MillionTreesNYC Science Advisory Board, AECOM, and
Yale University for the crucial roles that they played in
the MillionTreesNYC New York City Afforestation Project
initiative.
Overview Articles
www.biosciencemag.org
Redman CL, Grove JM, Kuby LH. 2004. Integrating social science into the
Long-Term Ecological Research (LTER) Network: Social dimensions
of ecological change and ecological dimensions of social change. Ecosystems 7: 161–171.
Rittel H. 1984. Second-generation design methods. Pages 317–327 in
Cross N, ed. Developments in Design Methodology. Wiley.
Rowe AA, Borst M, O’Connor TP, Stander EK. 2010. Permeable pavement monitoring at the Edison Environmental Center demonstration
site. Pages 2908–2916 in Palmer RN, ed. World Environmental and
Water Resources Congress 2010: Challenges of Change. Environmental and Water Resources Institute of the American Society of Civil
Engineers.
Shirk JL, et al. 2012. Public participation in scientific research: A framework
for deliberate design. Ecology and Society 17 (art. 29).
Spirn AW. 1984. The Granite Garden: Urban Nature and Human Design.
Basic Books.
Sukopp H, Hejný S, Kowarik I, eds. 1990. Urban Ecology: Plants and Plant
Communities in Urban Environments. SPB Academic Publishers.
Wall A. 1999. Programming the urban surface. Pages 233–250 in Corner J,
ed. Recovering Landscape: Essays in Contemporary Landscape Architecture. Princeton Architectural Press.
Whyte WH. 1980. The Social Life of Small Urban Spaces. Washington D.C.:
The Conservation Foundation.
Young RF, Wolf SA. 2006. Goal attainment in urban ecology research:
A bibliometric review 1975–2004. Urban Ecosystems 9: 179–193.
Alexander J. Felson (
[email protected]) is affiliated with the School
of Forestry and Environmental Studies and with the School of Architecture
at Yale University, in New Haven, Connecticut, where he is principal investigator of NY-CAP (the New York City Afforestation Project). He served as
AECOM’s project director for the Reforestation PlaNYC initiative. Mitchell
Pavao-Zuckerman is affiliated with the University of Arizona’s Biosphere 2,
in Tucson. Timothy Carter is affiliated with the Center for Urban Ecology
at Butler University, in Indianapolis, Indiana. Franco Montalto is affiliated
with the Civil, Architectural, and Environmental Engineering Department
at Drexel University, in Philadelphia, Pennsylvania. Bill Shuster is affiliated
with the US Environmental Protection Agency’s National Risk Management
Research Laboratory, in Cincinnati, Ohio. Nikki Springer is affiliated with the
School of Forestry and Environmental Studies at Yale University. At the time
of the writing of this article, Emilie K. Stander was affiliated with the Bureau
for Economic Growth, Education, and Environment, within the US Agency
for International Development in Washington, DC; she is now affiliated with
the Department of Science and Engineering at Raritan Valley Community
College, in Branchburg, New Jersey; she previously worked at the Edison
Environmental Center, in Edison, New Jersey. Olyssa Starry is affiliated with
the Plant Sciences and Landscape Architecture Department at the University
of Maryland, in College Park.
November 2013 / Vol. 63 No. 11•BioScience865
Downloaded from http://bioscience.oxfordjournals.org/ by guest on March 1, 2014
Lynch K, Hack G. 1984. Site Planning, 3rd ed. Cambridge: MIT Press.
Martin LJ, Blossey B, Ellis E. 2012. Mapping where ecologists work: Biases
in the global distribution of terrestrial ecological observations. Frontiers
in Ecology and the Environment 10: 195–201.
McDonnell MJ, Hahs AK. 2008. The use of gradient analysis studies in
advancing our understanding of the ecology of urbanizing landscapes:
Current status and future directions. Landscape Ecology 23: 1143–1155.
doi:10.1007/s10980-008-9253-4
McHarg IL. 1967. Design with Nature. Wiley.
McPhearson PT, Feller M, Felson AJ, Karty R, Lu JWT, Palmer MI,
Wenskus T. 2010. Assessing the effects of the urban forest restoration
effort of MillionTreesNYC on the structure and functioning of New
York City ecosystems. Cities and the Environment 3: 1–21.
Meyer JL, Frumhoff PC, Hamburg SP, de la Rosa C. 2010. Above the din but
in the fray: Environmental scientists as effective advocates. Frontiers in
Ecology and the Environment 8: 299–305.
Miller TR, Baird TD, Littlefield CM, Kofinas G, Chapin F[S] III, Redman
CL. 2008. Epistemological pluralism: Reorganizing interdisciplinary
research. Ecology and Society 13 (art. 46).
Musacchio LR. 2009. The scientific basis for the design of landscape sustainability: A conceptual framework for translational landscape research
and practice of designed landscapes and the six Es of landscape sustainability. Landscape Ecology 24: 993–1013.
Nassauer JI. 2012. Landscape as medium and method for synthesis in urban
ecological design. Landscape and Urban Planning 106: 221–229.
Natural Resources Group. 1988. Manual of Plant Formation Entitation.
New York City Department of Parks and Recreation.
Newcombe K, Kalma JD, Aston AR. 1978. The metabolism of a city: The
case of Hong Kong. AMBIO 7: 3–15.
Palmer MA. 2009. Reforming watershed restoration: Science in need of
application and applications in need of science. Estuaries and Coasts
32: 1–17.
———. 2012. Socioenvironmental sustainability and actionable science.
BioScience 62: 5–6.
Pataki DE, Carreiro MM, Cherrier J, Grulke NE, Jennings V, Pincetl S,
Pouyat RV, Whitlow TH, Zipperer WC. 2011. Coupling biogeochemical
cycles in urban environments: Ecosystem services, green solutions, and
misconceptions. Frontiers in Ecology 9: 27–36.
Pavao-Zuckerman MA, Byrne LB. 2009. Scratching the surface and digging
deeper: Exploring ecological theories in urban soils. Urban Ecosystems
12: 9–20. doi:10.1007/s11252-008-0078-3
Pickett STA, Cadenasso ML. 2008. Linking ecological and built components
of urban mosaics: An open cycle of ecological design. Journal of Ecology 96: 8–12.
Pickett STA, et al. 2011. Urban ecological systems: Scientific foundations
and a decade of progress. Journal of Environmental Management 92:
331–362.
Pouyat RV, et al. 2010. The role of federal agencies in the application of scientific knowledge. Frontiers in Ecology and the Environment 8: 322–328.