Skip to main content
Two trial piles were installed at the berm section of an embankment in the later stage of its construction and one of them was fitted with an oversized casing to isolate its top 3. m from the action of surrounding soil. Lateral bending... more
    • by 
    •   16  
      Soil-Structure InteractionMovementPilesStiffness
This research was carried out to study the characteristics of bamboo leaf ash stabilization on lateritic soil in highway construction. Preliminary tests were performed on three samples, A, B, and C for identification and classification... more
    • by 
    •   3  
      Civil EngineeringTransportation EngineeringConstruction Method
In this paper, a practical construction method is proposed for polar codes over binary-input channels. Unlike the existing construction methods, we use a Bhattacharyya parameter bound to select the bit-channels over which the information... more
    • by 
    •   2  
      Wireless CommunicationsConstruction Method