Project 2016 For Dummies
()
About this ebook
Project manager, meet your new assistant! Once you discover Project 2016 you'll be amazed at how efficient and effective the project management process can be. Written by an expert author who knows project management processes backward and forward, this friendly, hands-on guide shows you how to get started, enter tasks and estimate durations, work with resources and costs, fine-tune your schedule, set baselines, collect data, analyze progress, and keep your projects on track.
How many times have you heard people in the office mutter under their breath, 'These projects never run on time?' Well, now they can! Project 2016 For Dummies shows you how to use the latest version of Microsoft Project to create realistic project timelines, make the most of available resources, keep on top of all those pesky details, and, finally, complete your project on time and on budget. Easy!
- Fully updated to reflect the latest software changes in Microsoft Project 2016
- All-new case studies and examples highlight the relevance of key features of Microsoft Project 2016
- Exposes the correlation between what project managers do and how Microsoft Project 2016 supports their work
- Covers working with calendars, using and sharing resources, budgeting, gathering and tracking data, and more
If you're a time-pressured project manager looking to make your life—and your projects—easier, Project 2016 For Dummies shows you how to get things done!
Read more from Cynthia Snyder Dionisio
Microsoft Project 2019 For Dummies Rating: 5 out of 5 stars5/5Microsoft Project For Dummies Rating: 0 out of 5 stars0 ratings
Related to Project 2016 For Dummies
Related ebooks
Project 2010 For Dummies Rating: 5 out of 5 stars5/5Project Management All-in-One For Dummies Rating: 0 out of 5 stars0 ratingsProject Management Essentials For Dummies, Australian and New Zealand Edition Rating: 4 out of 5 stars4/5Outlook 2019 For Dummies Rating: 3 out of 5 stars3/5The New One-Page Project Manager: Communicate and Manage Any Project With A Single Sheet of Paper Rating: 3 out of 5 stars3/5Microsoft Project 2016: Up To Speed Rating: 5 out of 5 stars5/5Scrum For Dummies Rating: 0 out of 5 stars0 ratingsOffice 365 For Dummies Rating: 0 out of 5 stars0 ratingsPMP Certification All-in-One For Dummies Rating: 0 out of 5 stars0 ratingsMicrosoft Project 2019: Up To Speed Rating: 5 out of 5 stars5/5PowerPoint 2013 For Dummies Rating: 3 out of 5 stars3/5Operations Management For Dummies Rating: 4 out of 5 stars4/5SharePoint 2016 For Dummies Rating: 5 out of 5 stars5/5PowerPoint 2019 For Dummies Rating: 0 out of 5 stars0 ratingsBusiness Analysis For Dummies Rating: 4 out of 5 stars4/5Business Writing For Dummies Rating: 3 out of 5 stars3/5Teach Yourself VISUALLY Microsoft 365 Rating: 0 out of 5 stars0 ratingsMicrosoft 365 For Dummies Rating: 0 out of 5 stars0 ratingsCareer Development All-in-One For Dummies Rating: 5 out of 5 stars5/5Office 2019 All-in-One For Dummies Rating: 0 out of 5 stars0 ratingsProject Management for Small Projects, Third Edition Rating: 4 out of 5 stars4/5SharePoint For Dummies Rating: 0 out of 5 stars0 ratingsOffice 2019 For Seniors For Dummies Rating: 0 out of 5 stars0 ratingsOffice 2016 For Dummies Rating: 3 out of 5 stars3/5Business Planning Essentials For Dummies Rating: 5 out of 5 stars5/5Project Management For Dummies Rating: 4 out of 5 stars4/5Agile Project Management For Dummies Rating: 3 out of 5 stars3/5How to Plan Projects with Microsoft Project Rating: 5 out of 5 stars5/5Managing For Dummies Rating: 4 out of 5 stars4/5Strategic Planning Kit For Dummies Rating: 5 out of 5 stars5/5
Enterprise Applications For You
Bitcoin For Dummies Rating: 4 out of 5 stars4/5Creating Online Courses with ChatGPT | A Step-by-Step Guide with Prompt Templates Rating: 4 out of 5 stars4/5Enterprise AI For Dummies Rating: 3 out of 5 stars3/5Trend Following: Learn to Make a Fortune in Both Bull and Bear Markets Rating: 5 out of 5 stars5/5Lean Management for Beginners: Fundamentals of Lean Management for Small and Medium-Sized Enterprises - With many Practical Examples Rating: 0 out of 5 stars0 ratingsAgile Project Management: Scrum for Beginners Rating: 4 out of 5 stars4/5Notion for Beginners: Notion for Work, Play, and Productivity Rating: 4 out of 5 stars4/5Excel : The Ultimate Comprehensive Step-By-Step Guide to the Basics of Excel Programming: 1 Rating: 5 out of 5 stars5/5Learn Software Testing in 24 Hours Rating: 0 out of 5 stars0 ratingsChange Management for Beginners: Understanding Change Processes and Actively Shaping Them Rating: 5 out of 5 stars5/5Product Operations: How successful companies build better products at scale Rating: 0 out of 5 stars0 ratingsReact Projects: Build 12 real-world applications from scratch using React, React Native, and React 360 Rating: 0 out of 5 stars0 ratings101 Most Popular Excel Formulas: 101 Excel Series, #1 Rating: 4 out of 5 stars4/5Logseq for Students: Super Powered Outliner Notebook for Learning with Confidence Rating: 5 out of 5 stars5/5Learn SAP Basis in 24 Hours Rating: 5 out of 5 stars5/5Learn PMP in 24 Hours Rating: 0 out of 5 stars0 ratingsPersonal Knowledge Graphs: Connected thinking to boost productivity, creativity and discovery Rating: 0 out of 5 stars0 ratingsGenerative AI For Dummies Rating: 0 out of 5 stars0 ratingsScrum: Understanding Scrum at a Deeper Level and Mastering Agile Project Management Rating: 4 out of 5 stars4/5Excel Guide for Success Rating: 5 out of 5 stars5/5Business Analytics Rating: 4 out of 5 stars4/5
Reviews for Project 2016 For Dummies
0 ratings0 reviews
Book preview
Project 2016 For Dummies - Cynthia Snyder Dionisio
Introduction
Over the years, project management has evolved from a discipline that began with index cards and yarn to one that now uses sophisticated analyses, techniques, projections, reporting, and time and money tracking. Project management software brings functionality to project management that makes planning and tracking the complex projects we undertake a little more manageable.
About This Book
Microsoft Office Project 2016, the most recent incarnation of the world’s most popular project management software, offers a tremendous wealth of functionality to users. In the beginning, however, as with most software, mastering it can seem like a daunting process. It helps to understand how Project’s features relate to what you do every day as a project manager.
In Project 2016 For Dummies, my goal is to help you explore Project 2016, providing information on relevant project management concepts while also offering specific procedures to build and track a Project schedule. More important, I offer advice on how to make all these features and procedures mesh with what you already know as a project manager to ease the transition to using Project 2016.
Here are some broad topics that I help you explore in this book. You can
Start out in Project 2016 by entering tasks and dependencies, estimating durations, and working with views
Work with resources, calendars, and costs
Negotiate constraints, fine-tune the schedule, and set a baseline
Gather data, analyze progress, take corrective actions, and report project status
Within this book, you may note that some web addresses break across two lines of text. If you’re reading this book in print and want to visit one of these web pages, simply key in the web address exactly as it’s noted in the text, pretending as though the line break doesn’t exist. If you’re reading this as an e-book, you’ve got it easy — just click the web address to be taken directly to the web page.
Foolish Assumptions
I’ve made some assumptions about you, gentle reader. I figure that you’re computer-literate and that you know how to use the mouse, the keyboard, software menus, and toolbars. I assume that you know how to use most common Windows functions (such as the Clipboard), as well as many basic software functions, such as selecting text and dragging and dropping items with the mouse.
I also assume that you have experience in managing projects. Whether you manage very large projects that are several years long or you have been a team lead on a project, the information in this book is more accessible if you have a background in project management.
I do not assume that you’ve used Project or any other project management software. If you’re new to Project, you’ll find what you need to get up to speed, including information on how Project works, finding your way around the Project interface, and building your first Project plan. If you’ve used an earlier version of Project, you’ll find out about Project 2016 and all the new features it provides.
Icons Used in This Book
One picture is worth … well, you know. That’s why For Dummies books use icons to provide visual clues to what’s going on. Essentially, icons call your attention to bits of special information that may well make your life easier. The following icons are used in this book.
remember The Remember icon signals either a pertinent fact that relates to what you’re reading at the time (but is also mentioned elsewhere in the book) or a reiteration of a particularly important piece of information that’s, well, worth repeating.
tip Tips are the advice columns of computer books: They offer sage advice, a bit more information about topics under discussion that may be of interest, or ways to do things a bit more efficiently.
warning Warning icons spell trouble with a capital T: When you see a warning, read it. If you’re not careful, you might do something at this point that could cause disaster.
Beyond the Book
In addition to the material in the print or e-book you’re reading right now, this product also comes with some access-anywhere goodies on the web:
Cheat Sheet: The cheat sheet has lots of shortcuts and other nifty tips and tricks. You can find the Cheat Sheet at www.dummies.com/cheatsheet/project2016.
Web Extras: There is a web extra for every part in this book. Just follow the link to the Web Extras at www.dummies.com/extras/project2016.
Companion website: This book is accompanied by a companion website that includes a project charter example and template, as well as several sample forms to help you plan and manage the schedule. To access this additional material, point your web browser to www.dummies.com/go/project2016fd.
Where to Go from Here
Take what you’ve learned in the project management school of hard knocks and jump into the world of Project 2016. When you do, you’ll be rewarded with a wealth of tools and information that help you manage your projects much more efficiently.
Your first step might be to read the table of contents and find the sections of this book that you need — or simply turn to Chapter 1 and start reading.
Part I
Getting Started with Project 2016
webextra For Dummies can help you get started with lots of subjects. Visit www.dummies.com for more great content online.
In this part …
check.png Get familiar with the Ribbons and file tabs in Project 2016.
check.png See how to open a new project, enter tasks, and organize a project.
check.png Become skilled in working with summary tasks, milestones, and notes.
check.png Identify and arrange task dependencies to create a network diagram.
check.png Develop duration estimates for tasks.
check.png Customize Project views to meet your needs.
Chapter 1
Project Management, Project 2016, and You
In This Chapter
arrow Understanding the elements of a project
arrow Laying out the project manager’s role
arrow Benefitting from Project 2016
arrow Exploring the software interface
arrow Finding help in Project
Welcome to the world of computerized project management with Microsoft Project. If you’ve never used project management software, you’re entering a brave new world.
Everything you used to do with handwritten to-do lists, word processors, and spreadsheets magically comes together in Project. However, this transition doesn’t come in a moment, and you need a basic understanding of what project management software can do to get you up to speed. If you’ve used previous versions of Project, the overview in this chapter can refresh your memory and ease you into a few of the new Project 2016 features.
Even if you’re a seasoned project manager, this chapter provides the foundation for how to work with Project.
Introducing Project Management
You probably handle projects day in and day out. Some are obvious, because your boss named them so that any fool would know that they’re projects: Acme Drilling Project or Network Expansion IT Project, for example. Others are less obvious, such as that presentation you need to put together for your director or that how-to guide on planting a vegetable garden in your backyard.
In this book, a project is defined as a unique venture undertaken to produce distinct deliverables, products, or outcomes. In the context of a project, a deliverable is a discrete component or item that meets the requirements of the project, such as a design document or a prototype. Projects have multiple variables; some are straightforward to define, and others aren’t.
Using the information about variables in Table 1-1, you can say that project management is the practice of organizing, managing, and controlling project variables to meet the project outcomes and mission.
Table 1-1 Project Variables
Defining project manager
Although understanding the role (let alone the usefulness) of certain managers isn’t always easy, you can easily spot the value of a project manager: This person creates the master plan for a project and ensures that it is implemented successfully. Along the way, the project manager uses technical, business, and professional skills to manage the completion of tasks and keep the schedule on track.
tip A truly professional project manager may have a degree in project management or a professional certification. For example, if you see the initials PMP beside a name, that person has been certified as a project management professional by the Project Management Institute, the leading global organization establishing project management standards and credentials, and offering educational and other types of resources in the field.
Identifying what a project manager does
A project manager isn’t always the highest authority in a project. Often, that role belongs to whoever manages the project manager — including, possibly, members of senior management. Rather, the project manager is the person who ensures that aspects of the project are integrated and assumes hands-on responsibility for successes as well as failures.
tip In project management parlance, the person who champions (and funds) a project is the project sponsor. Although the project manager may work for the project sponsor, the project often also has a customer — outside the project manager’s own company or within it — for whom the end product is produced.
The project manager manages these essential pieces of a project:
Scope: Define and organize all work that needs to be done in order to meet the project mission and create deliverables.
Schedule: This element, which you create by working with Project, includes the estimated steps and associated timing involved in reaching the project goal.
Resources: Assign resources and track their activities on the project as well as resolve resource conflicts and build consensus. This part of the job also involves managing nonhuman resources such as materials and equipment.
Cost: Estimate project costs and apply those estimates across the schedule to create a time-phased budget.
Communication: Notify appropriate stakeholders (everyone who has a legitimate stake in its success) of the project status.
Creating a logical balance of the defined variables of scope, time, cost, and resources is at the core of a good project manager’s job throughout the life of a project. Managing a project requires overseeing all its variables to ensure that the project goals are accomplished on time, within the limits of the budget, and using the assigned resources while also addressing risks, managing change, and satisfying stakeholders. Sound easy? Maybe not. However, one thing is certain: Having software to help organize and structure the work makes managing the project less daunting. That’s where Project 2016 can help.
Introducing Project 2016
Project 2016, which is a scheduling tool, helps you organize, manage, and control defined variables, as identified in the preceding section. Project can also help you manage the undefined variables as well. In this book, I show you how to use Project to organize and manage your work, create realistic schedules, and optimize your use of resources.
Take a moment to look at some of the wonderful ways in which Project can help you organize, manage, and control your project. Now that you have, or your company has, bought Project (and this book) and you’re investing your time to understand how to use it, you can enjoy these benefits:
Use built-in templates to get a head start on your project. Project templates are prebuilt plans for a typical business project, such as commercial construction, an engineering project, a new product rollout, software development, or an office move.
Organize your project by phase, deliverable, geography, or any other method. The outline format allows you to progressively elaborate the information in greater granularity depending on how detailed you want your plan to be.
Determine costs by your chosen method. Examples are time period, resource type, deliverable, or cost type.
Organize resources by resource type. Level your resources to avoid overallocation, or determine the impact on the duration of a task based on a change in resources.
Calculate costs and timing based on your input. You can quickly calculate what-if scenarios to solve resource conflicts, maintain costs within your budget, or meet a deliverable deadline.
Use views and reports with the click of a button. A wealth of information is now available to you — and those you report to. You no longer have to manually build a report on total costs to date to meet a last-minute request from your boss.
Manage complex algorithms (that you couldn’t even begin to figure out on your own) to complete such tasks as leveling resource assignments to solve resource conflicts, filtering tasks by various criteria, modeling what-if scenarios, and calculating the dollar value of work performed to date.
remember No matter how cool the tool, you have to take the time to enter meaningful data. Great software doesn’t ensure great outcomes; it only makes them easier to achieve.
Getting to Know You
The file you create in Project is a Project schedule model. It’s a model because it models what you think will happen given what you know at the time. However, for ease of reference, I just refer to it as a schedule. The schedule has a plethora of data about various aspects of your project as well as graphical representations of that information.
remember Some people refer to the project schedule as the project plan. In reality, the project plan contains the project schedule — plus information such as the budget, work breakdown structure, project life cycle, risk management plan, and many other ingredients necessary to effectively manage a project.
When you first open Project 2016, you see several options for starting a new project, as shown in Figure 1-1.
Figure 1-1: What you see when you open Project 2016.
You can open a blank project, create a new project from an existing project, or create a new project by importing information from Microsoft Excel or SharePoint. You can also take advantage of premade templates for common project types, such as these examples:
Agile project management
Software development
New product launch
Residential construction
If you don’t see the template you need, you can search for online templates by entering keywords in the search box at the top of the page. For purposes of this discussion, I assume that you’re starting with a new, blank project.
When you open a new project, you see the Quick Access toolbar, a few file tabs, the Ribbon, the Timeline, a pane with a sheet and a chart, and the status bar, as shown in Figure 1-2.
Figure 1-2: A blank project.
In Figure 1-2, you see Gantt Chart view. (I discuss views in Chapter 6.) For now, here’s an overview of the major elements in Project (refer to Figure 1-2):
Quick Access toolbar: The Quick Access toolbar, above and to the left of the Ribbon, is onscreen at all times and in all views.
File tab: The file tabs organize commands based on a particular type of activity. For example, if you’re working with resources, you’ll likely find the command or setting you want on the Resource tab.
Ribbon: The Ribbon provides easy access to the most commonly used tools and commands. When you change tabs, the available tools on the Ribbon change.
Group: A group is a set of related commands or choices on the Ribbon. For example, to format text in a cell on the sheet, first find the formatting information you need in the Font group on the Task tab of the Ribbon.
Timeline: The Timeline provides an overview of the entire project — a graphical view of the project from start to finish. You have the option of showing the Timeline or hiding it.
Sheet: Similar to a spreadsheet, the sheet displays the data in the project. The default fields change depending on the file tab you’re working in. You can customize the columns and fields in the sheet to meet your needs.
Chart: The chart is a graphical depiction of the information on the sheet. Depending on the view or file tab you see, you might also see a bar chart depicting the duration of a task or a resource histogram showing resource usage.
Status bar: The status bar, at the bottom of the Project window, has information on views and zoom level on the right, and information on how newly entered tasks are scheduled on the left.
Navigating file tabs and the Ribbon
Each of the seven file tabs in Project shows different options on the Ribbon. In this section, I provide an overview of each file tab and of the Ribbon and the Quick Access toolbar. I elaborate on various functions and commands on the Ribbon in later chapters.
The first tab on the left, the File tab, stands out in bright green. After you click this tab, you see the menu bar down the left side, as shown in Figure 1-3.
Figure 1-3: The File tab menu.
The File tab puts you into Backstage view, where you find choices for working with files and changing options. For example, you can create a new project, open an existing project, save your current project, or print your current project. From Backstage view, you can also share, export, or close your current project. If you’re feeling adventurous, you can even customize the Ribbon and the Quick Access toolbar.
The Task file tab is where you spend a lot of your time in Project. As you can see in Figure 1-4, on the far left side of the Task file tab is the View. The default view is Gantt Chart view. It shows the task information and the chart that displays a bar chart representing the duration of each task.
Figure 1-4: The Task file tab.
In addition to Gantt Chart, you can choose these views:
You may recognize some of the groups of commands on the Task file tab. For example, the Clipboard and Font groups are standard in many Windows applications. Other groups, such as Schedule and Tasks, are specific to a particular view — in this case, Gantt Chart view. Look for the deep green Gantt Chart Tools Format tab when you see the Task file tab in Gantt Chart view. In other views, you see different tools above the Format tab.
The Resource file tab, shown in Figure 1-5, helps you organize resources, such as adding, assigning, and leveling resources across tasks. In Project, resources include people, equipment, material, locations, and supplies. You can assign costs and calendars to resources. (I talk more about resources in Chapter 7.)
Figure 1-5: The Resource file tab.
The Report file tab, shown in Figure 1-6, is new in Project 2016. You can create reports on resources, costs, or progress, or put them all together in a dashboard report. You can create a report that compares your current status to previous versions of your project. I tell you all about reports, including how to customize and export your reports, in Chapter 18.
Figure 1-6: The Report file tab.
On the Project file tab, you find commands to help you manage your project as a whole, rather than by task or resource. For example, you can enter or change the project start and finish dates and the baseline. If you need to change working time or add a subproject, this is the place to do it. Figure 1-7 shows the Project file tab.
Figure 1-7: The Project file tab.
The View file tab lets you see some standard views. Examples are Task views, such as Gantt Chart, and Resource views, such as Resource Usage or Team Planner. You can use the View file tab to look at information sorted by date or a specific period. You can see the View file tab in Figure 1-8.
Figure 1-8: The View file tab.
The Format file tab has commands that help you present your schedule, such as font styles, page breaks, and column settings. You can see the options in Figure 1-9.
Figure 1-9: The Format file tab.
tip You can either show or hide the Ribbon to produce more real estate on your screen. The pushpin to the far right of the Ribbon pins it to your display, keeping it open and visible (as shown in Figure 1-10). The upward-facing arrow (^) on the far-right side hides the Ribbon. If your Ribbon is closed, click on any tab, look in the lower-right corner of the Ribbon and you will see a pushpin. Click on the pushpin to keep your Ribbon open. You can also press Ctrl+F1 to show or hide the Ribbon.
Figure 1-10: Keeping your Ribbon visible.
Displaying more tools
The Quick Access toolbar, which appears onscreen at all times, initially contains the Save, Undo, and Redo buttons. You can customize the Quick Access toolbar by clicking the down arrow at the right end of the toolbar and clicking the option you want to hide or display. If you don’t see the option you want, click More Commands near the bottom of the menu to get a full list of commands you can add. Figure 1-11 shows the list of commands you can choose from.
Figure 1-11: Customizing the Quick Access toolbar.
The nifty Timeline tool shows the entire scaled time span of the project. To show the Timeline, go to the View file tab, in the Split View group and click the check box that says Timeline. You can add tasks or milestones to the Timeline. You can also copy the Timeline and paste it into reports or other presentations. To hide the Timeline, uncheck the Timeline box. You can also work with the Timeline by right-clicking to insert tasks, copy the Timeline, change the font, or view detailed information.
The status bar sits at the bottom of the project, to indicate whether your tasks are manually or automatically scheduled. (Read more on this topic in Chapter 2.) The status bar also lets you move quickly to some of the most popular views, such as Gantt, Task Usage, Team Planner, Resource Sheet, and Reports. You can also adjust the time scale from a high-level, time scaled view to a detailed time-scaled view with the View slider, on the far-right end of the status bar. I talk more about views in Chapter 6.
Tell Me What You Want to Do
In previous versions of Microsoft Office, there was a Help function. That has been replaced by the Tell Me What You Want to Do feature. If you want some coaching on how to do something in Project 2016, just click the light bulb next to the Format tab. Enter a keyword, and you have several options to choose from. I searched on critical path
and the information in Figure 1-12 came up.
Figure 1-12: A search for critical path.
Chapter 2
Starting the Project
In This Chapter
arrow Moving from concept to plan
arrow Creating the project’s work breakdown structure (WBS)
arrow Entering project information into Project
arrow Entering the WBS into Project
arrow Entering tasks into Project
arrow Saving the project
Congratulations — you’re the proud project manager of a new project! Before you do anything, you need to understand the scope of the project. You must clearly specify, for example, any intended outcomes, expectations for milestones, main deliverables, budgeted amounts, key stakeholders, and what denotes success.
Planning a project isn’t as easy as opening a file in Project and entering all the activities you have to complete. Before you can begin to plan, you need to understand the purpose of the project and the high-level information about the project, such as milestone dates and overall budget.
To complete a successful project, you need to plan well. To plan well, you need to understand the project’s objectives as well as its success criteria. Therefore, before you enter the first task into Project, you create the project charter (described a little later in this chapter) to initiate the project and develop the work breakdown structure (WBS) to organize project deliverables. Then