Academia.eduAcademia.edu

PENGADAAN TITIK REFERENSI PEMETAAN DI KOTA BANDUNG

Rencana titik referensi kota bandung

LAPORAN TUGAS BESAR GD-3105 SURVEY GNSS SEMESTER I TAHUN 2016/2017 PENGADAAN TITIK REFERENSI PEMETAAN DI KOTA BANDUNG Diajukan untuk memenuhi salah satu syarat kelulusan mata kuliah GD-3105 Survey GNSS Dosen: (197803292010121004) Irwan Gumilar, ST., M.Si Teguh Purnama Sidiq, ST., M.Sc. (198308222014041001) Asisten: Daniel Arianto Tampubolon 15112016 Tio Akira Al Rasyid 15113053 Disusun oleh: Rifa Akbar Ahadiat 15114021 PROGRAM STUDI TEKNIK GEODESI DAN GEOMATIKA FAKULTAS ILMU DAN TEKNOLOGI KEBUMIAN INSTITUT TEKNOLOGI BANDUNG 2016 DAFTAR ISI DAFTAR ISI ..................................................................................................... 2 DAFTAR GAMBAR ........................................................................................ 3 DAFTAR TABEL ............................................................................................. 4 BAB I PENDAHULUAN ................................................................................ 5 1.1 Latar Belakang........................................................................................................... 5 1.2 Tujuan ....................................................................................................................... 6 1.3 Lokasi Studi ............................................................................................................... 6 BAB II TEORI DASAR ................................................................................... 7 2. Dasar Teori ................................................................................................................ 7 2.1 GPS Tipe Navigasi ...................................................................................................... 7 2.2 Prinsip penentuan posisi dengan GPS....................................................................... 7 2.3 Istilah Penting di dalam Penggunaan GPS Handheld ..............................................12 BAB III PERENCANAAN PENGAMATAN................................................ 13 3. Perencanaan ...........................................................................................................13 3.1 Struktur Perusahaan ...............................................................................................13 1.4 Tim Survei ...............................................................................................................13 1.5 Alat dan Keperluan logistik .....................................................................................15 1.6 Perencanaan titik referensi .....................................................................................16 3.4 Timeline pengerjaan ...............................................................................................18 3.5 Teknis pengukuran titik referensi ...........................................................................19 3.6 Rancangan Anggaran Biaya .....................................................................................38 DAFTAR PUSTAKA ..................................................................................... 41 2 DAFTAR GAMBAR Gambar 3.1 Struktur Perusahaan ......................................................................................13 Gambar 3.2 Struktur tim survei.........................................................................................13 Gambar 3.4.1 Titik-titik referensi hasil plotting dengan google earth ..............................16 Gambar 3.4.2 Baseline yang dibentuk dari titik-titik referensi .........................................17 3 DAFTAR TABEL Tabel 3.3.1 List keperluan logistik .....................................................................................15 Tabel 3.4.1 timeline pengerjaan .......................................................................................18 Tabel 3.5.1 Teknis pengukuran tim 1 ................................................................................19 Tabel 3.5.2 Teknis pengukuran tim 2 ................................................................................25 Tabel 3.5.3 Teknis pengukuran tim 3 ................................................................................31 Tabel 3.6.1 Biaya selama pengukuran titik referensi ........................................................38 4 BAB I PENDAHULUAN 1.1 Latar Belakang Perencanaan pembangunan merupakan bagian yang sangat penting dan tidak boleh diabaikan dalam proses pembangunan. Hal ini dikarenakan kebutuhan akan pembangunan itu sendiri lebih besar daripada sumber daya yang tersedia. Melalui perencanaan dirumuskan kegiatan pembangunan yang secara efisien dan efektif dapat memberi hasil yang optimal dalam memanfaatkan sumber daya yang tersedia serta mengembangkan potensi yang ada (Kartasasmita, 1997:49). Dari sekian banyak produk perencanaan yang diperlukan dalam pembangunan wilayah dalam penyelenggaraan otonomi daerah sebagaimana dikemukakan diatas, salah satu penyusunan perencanaan yang penting menjadi perhatian pemerintah daerah adalah menyusun perencanaan penataan ruang wilayah. Perencanaan dalam pembangun ini yang mejadikan alasan suatu pengadaan titik referensi perlu dilakukan. Dimana Seiring dengan pesatnya pertumbuhan ekonomi dan peningkatan investasi dalam pemanfaatan sumber daya alam, maka kebutuhan informasi geografi suatu wilayah dalam skala yang lebih detail merupakan suatu hal yang sangat penting dan sangat mendesak untuk disegerakan pengadaannya. Berkaitan dengan hal tersebut di atas maka pihak-pihak yang berkepentingan dengan adanya kebutuhan akan informasi yang lebih detail tentang kondisi topografi suatu daerah dengan terpaksa mengadakan survey dan pemetaan sendiri berhubung tertinggalnya atau terlambatnya Indonesia dalam memetakan seluruh wilayahnya untuk peta skala besar. 5 1.2 Tujuan Melakukan perencanaan dalam pengadaan titik-titik referensi pemetaan di kota bandung. 1.3 Lokasi Studi Lokasi studi berada di seluruh daerah kota Bandung. Berikut rinciannya Letak geografis : 6°54 53,08 LU 107°36 35,32 BT Lokasi : Provinsi Jawa Barat, Kota Bandung Gambar 1.1 Lokasi studi Kota Bandung 6 BAB II TEORI DASAR 2. Dasar Teori 2.1 GPS Tipe Navigasi GPS (Global Positioning System) adalah sistem satelit navigasi dan penentuan posisi yang dimiliki dan dikelola oleh militer Amerika Serikat. Sistem ini dirancang untuk memberikan posisi dan kecepatan tiga-dimensi serta informasi mengenai waktu, secara kontinyu di seluruh dunia tanpa bergantung waktu dan cuaca, bagi banyak orang secara simultan. Tujuan utama GPS adalah untuk mewujudkan sistem penentuan posisi di darat, laut, dan udara bagi pihak tentara Amerika Serikat dan sekutunya, namun kemudian sistem ini bebas digunakan oleh semua pengguna. (Abidin, 2006) 2.2 Prinsip penentuan posisi dengan GPS Pada penentuan posisi dengan menggunakan GPS, datum yang digunakan adalah datum Word Geodetic System 1984 (WGS 84). Datum ini adalah sistem referensi yang digunakan oleh Departemen Pertahanan Amerika Serikat (DoD) sebagai pemilik dan pengelola satelit GPS untuk merepresentasikan parameter-parameter dari orbit satelit GPS. (Abidin, 2006) Prinsip penentuan posisi dengan GPS yaitu menggunakan metode reseksi jarak, dimana pengukuran jarak dilakukan secara simultan ke beberapa satelit yang telah diketahui koordinatnya. Pada pengukuran GPS, setiap epoknya memiliki empat parameter yang harus ditentukan : yaitu 3 parameter koordinat X,Y,Z atau L,B,h dan satu parameter kesalahan waktu 7 akibat ketidaksinkronan jam osilator di satelit dengan jam di receiver GPS. Oleh karena diperlukan minimal pengukuran jarak ke empat satelit. Ketelitian yang dihasilkan pada GPS ini bergantung kepada empat faktor yaitu : metode penentuan posisi yang digunakan, geometri dan distribusi satelit yang diamati, ketelitian data yang digunakan, dan strtegi/pengolahan data yang diterapkan. Metode penentuan posisi dengan GPS pertama-tama terbagi dua, yaitu metode absolut, dan metode diferensial. Masing-masing metode kemudian dapat dilakukan dengan cara real time dan atau post-processing. Apabila objek yang ditentukan posisinya diam maka metodenya disebut Statik. Sebaliknya apabila objek yang ditentukan posisinya bergerak, maka metodenya disebut kinematik. Selanjutnya lebih detail lagi kita akan menemukan metode-metode seperti SPP, DGPS, RTK, Survei GPS, Rapid statik, pseudo kinematik, dan stop and go, serta masih ada beberapa metode lainnya. Secara garis besar penentuan posisi dengan GPS ini dibagi menjadi dua metode yaitu metode absolut dan metode relatif. Metode absolut atau sering disebut point positioning, menentukan posisi hanya berdasarkan pada 1 pesawat penerima (receiver) saja. Ketelitian posisi dalam beberapa meter (tidak berketelitian tinggi) dan umumnya hanya diperuntukkan bagi keperluan navigasi. Data yang biasa digunakan adalah data psudorange. Metode relatif atau sering disebut differential positioning, menetukan posisi dengan menggunakan lebih dari sebuah receiver. Satu GPS dipasang pada lokasi tertentu dimuka bumi dan secara terus menerus menerima sinyal dari satelit dalam jangka waktu tertentu dijadikan sebagai referensi bagi yang lainnya. Metode ini menghasilkan posisi berketelitian tinggi (umumnya kurang dari 1 meter) dan diaplikasikan untuk keperluan survei geodesi ataupun pemetaan yang memerlukan ketelitian tinggi. Beberapa kesalahan dalam penentuan posisi dengan kedua metode di atas antara lain disebabkan oleh : efek multipath, efek selective availability 8 (SA), maupun kesalahan karena ketidaksinkronan antara peta kerja dan setting yang dilakukan saat menggunakan GPS. Multipath Fenomena dimana sinyal dari satelit tiba di antenna receiver melalui dua atau lebih lintasan yang berbeda. Hal ini biasa terjadi jika kita melakukan pengukuran posisi di lokasi-lokasi yang berdekatan dengan benda reflektif, seperti di samping gedung tinggi, di bawah kawat transmisi tegangan tinggi, di bawah pohon, dll. Untuk mengatasinya dapat dilakukan dengan menghindari pengamatan dekat benda reflektif, menggunakan satelit dengan tingkat kesehatan yang baik,melakukan pengukuran secara berulang-ulang dan dirata-rata hasilnya. Selective Availabillity (SA) Teknik pemfilteran yang diaplikasikan untuk memproteksi ketelitian tinggi GPS bagi khalayak umum dengan cara mengacak sinyalsinyal dari satelit terutama yang berhubungan dengan informasi waktu. Koreksinya hanya dapat dilakukan oleh pihak yang berwenang mengelola GPS ataupun pihak militer Amerika saja. Pihak-pihak lain yang mempunyai ijin untuk menggunakan data berketelitian tinggi biasanya juga diberi tahu cara koreksinya. SA merupakan sumber kesalahan paling besar bagi penentuan posisi dengan metode absolut. Namun dengan menerapkan metode relatif (differential positioning) kesalahan tersebut dapat dikurangi. Ambiguitas Fase Ambiguitas fase dari pengamatan fase sinyal GPS adalah sejumlah gelombang penuh yang tidak terukur oleh receiver GPS. Untuk dapat merekonstruksi jarak ukuran antara satelit dengan antena maka harga ambiguitas fase ditentukan terlebih dahulu. Pada pengamatan one-way (dari satu antena ke satu satelit) dan singgle difference, ambiguitas fase sulit untuk dipisahkan dengan efek kesalahan jam pada receiver atau satelit, dan oleh sebab itu sifat kebulatan harganya sulit untuk dieksploitasi. Sedangkan pada pengamatan double-difference, efek kesalahan jam pada receiver dan satelit tereliminasi, sehingga sifat kebulatan harganya dapat dieksploitasi. 9 Cycle Slips Cycle slips adalah ketidak-kontinyuan dalm jumlah gelombang penuh dari fase gelombang pembawa yang diamati, karena receiver disebabkan oleh satu dan lain hal, ‘terputus’ dalm pengamatan sinyal. Kalau kita membuat plot data pengamatan fase terhadap waktu, maka cycle slips dapat dikenali dari loncatan mendadak dari kurva grafik yang ditunjukkan pada gambar di bawah. Harga ambiguitas fase sebelum dan sesudah terjadinya cycle slips akan berbeda besarnya. Anti Spoofing Anti Spoofing (AS) adalah suatu kebijakan dari DoD Amerika Serikat, dimana kode-P dari sinyal GPS diubah menjadi kode-Y yang bersifat rahasia, yang strukturnya hanya diketahui pihak militer Amerika dan pihakpihak yang diberi izin. Kesalahan jam Data pseudorange dan fase kedua-duanya akan dipengaruhi oleh kesalahan jam receiver dan jam satelit. Kesalahan dari salah satu jam, apakah itu dalam bentuk offset waktu, offset frekuensi, ataupun frequensi drift akan langsung mempengaruhi ukuran jarak, baik itu pseudorange ataupun jarak fase. Pergerakkan dari Pusat Fase Antena Pusat fase antena adalah pusat (sumber) yang sebenarnya dari radiasi dan dalam konteks GPS merupakan titik referensi yang sebenarnya digunakan dalam pengukuran sinyal secara elektronis. Titik sumber radiasi yang ideal akan mempunyai muka fase gelombang berbentuk bola serta pusat fase yang tetap. Tetapi dalam realitanya, karena sumber radiasi yang ideal tersebut sulit untuk direalisasikan pada antena GPS, maka pusat fase antena GPS umumnya berubah-rubah bergantung pada elevasi dan azimut satelit serta intensitas sinyal, dan lokasinya akan berbeda untuk sinyal L1 dan L2. Karena satelit GPS selalu bergerak, maka pusat fase dari antena pun akan berubah dari waktu ke waktu. Imaging 10 Imaging adalah suatu fenomena yang melibatkan suatu benda konduktif(konduktor) yang berada dekat dengan antena GPS, seperti reflektor berukuran besar maupun grandplane dari antena itu sendiri. Radiasi dari antena sebenarnya akan menimbulkan arus induksi pada benda konduktif yang reflektif tersebut. Sehingga benda tersebut akan membangkitkan pola radisasi tertentu, sehingga seolah-olah menjadi antena tersendiri yang dapat dilihat sebagai bayangan “image” dari antena sebenarnya. Pola radiasi dari kedua antena ini selanjunya akan berinteraksi (coupling) dan resultan dari pola fase antena yang dihasilkan akan berbeda dengan pola fase antena GPS yang seharusnya. Kesalahan Ephemeris (orbit) Kesalahan ephemeris (orbit) adalah kesalahan dimana orbit satelit yang dilaporkan oleh ephemeris satelit tidak sama dengan orbit satelit yang sebenarnya. Kesalahan ephemeris ini akan mempengaruhi ketelitian dari koordinat titik-titik (obsolut maupun relatif) yang ditentukan. Dalam penentuan posisi secara relatif, semakin panjang baseline yang diamati maka efek dari bias efemeris satelit akan makin besar. Bias ionosfer Ionosfer adalah lapisan atas atmosfer dimana terdapat sejumlah elektron dan ion bebas yang mempengaruhi perambatan gelombang radio. Dimana ion-ion bebas dalam lapisan ionosfer akan mempengaruhi propogasi sinyal GPS. Dalam hal ini ionosfer akan mempengaruhi kecepatan, arah, polarisasi dan kekuatan dari sinyal GPS yang melaluinya. Bias troposfer Sinyal dari satelit GPS untuk sampai ke antena harus melalui lapisan troposfer, yaitu laisan atmosfer netral yang berbatasan dengan permukaan bumi dimana temperatur menurun dengan membesarnya ketinggian. Ketika melalui troposfer sinyal GPS akan mengalami refraksi, yang menyebabkan perubahan kecepatan dan arah sinyal GPS. 11 2.3 Istilah Penting di dalam Penggunaan GPS Handheld Beberapa istilah yang penting untuk diketahui yang berhubungan dengan GPS : Waypoint Istilah yang digunakan oleh GPS untuk suatu lokasi yang telah ditandai. Waypoint terdiri dari koordinat lintang (latitude) dan bujur (longitude). Sebuah waypoint biasa digambarkan dalam bentuk titik dan simbol sesuai dengan jenis lokasi. Mark Menandai suatu posisi tertentu pada GPS. Jika menandai lokasi menjadi waypoint,maka dikatakan telah melakukan marking. Route Kumpulan waypoint yang ingin ditempuh secara berurutan dan dimasukkan ke dalam GPS. Track Arah perjalanan yang sedang ditempuh dengan menggunakan GPS. Biasanya digambarkan berupa garis pada display GPS. Elevation Istilah pada GPS untuk menentukan ketinggian. Ada dua jenis pengukur ketinggian pada GPS, yaitu menggunakan alat klasik ‘barometer ’ atau menggunakan perhitungan satelit. Pengukuran ketinggian menggunakan barometer jauh lebih akurat di udara bebas,namun tidak bisa bekerja dalam pesawat atau ruang vakum lainnya.Ini disebabkan oleh perbedaan tekanan udara dalam ruang vakum dengan tekanan udara di luar. Pengukuran ketinggian menggunakan satelit akan lebih akurat pada tempat seperti 12 BAB III PERENCANAAN PENGAMATAN 3.Perencanaan 3.1 Struktur Perusahaan Gambar 3.1 Struktur Perusahaan 1.4 Tim Survei Team Leader Asistant Leader Surveyor Support Gambar 3.2 Struktur tim survei 13 Dimana struktur organisasi ini dijelaskan mulai dari pemberi kerja hingga sampai dipegang oleh perusahaan, kemudian membentuk tim-tim untuk sepenuhnya bertanggung jawab terhadap pekerjaan Survey dan Mapping yang akan dilaksanakan. Mengenai tugas-tugas dan wewenang dari personil lebih detil akan dijelaskan pada bagian selanjutnya. 1. Team Leader Syarat : Lulusan pendidikan Sarjana Strata 2 (S2) Geodesi dengan pengalaman 8 tahun dibidangnya. Tugas dan tanggung jawab : a) Mengkoordinir seluruh aktifitas tim dalam mengelola kegiatan baik di kantor maupun di lapangan. b) Bertanggung jawab terhadap Pemberi Pekerjaan yang berkaitan terhadap kegiatan tim pelaksana pekerjaan dan pelaksanaan pekerjaan yang sedang berlangsung. c) Membuat jadwal kegiatan d) Mengkaji ulang serta pengecekan seluruh hasil pekerjaan yang telah dilaksanakan. e) Melaksanakan presentasi dengan direksi pekerjaan dan instansi terkait. f) Bertanggung jawab atas semua hasil dalam pekerjaan ini. 2. Asistent Leader Syarat : Lulusan pendidikan Sarjana Strata 2 Geodesi (S2) atau Sarjana Strata 1 Geodesi (S1) dengan pengalaman kerja minimal 5 (delapan) tahun. Tugas dan tanggung jawab : a) Ahli Survey GPS bertugas merencanakan lingkup pekerjaan analisa, mengkoordinir, dan bertanggung jawab terhadap hasil pengukuran GPS 3. Surveyor 14 Kriteria : a) Minimal D-3 Geodesi atau S-1 Geodesi dengan penglaman 2 tahun pada bidang survey pemetaan. b) Berpengalaman praktis dalam pengoperasian receiver GPS yang akan digunakan c) Berpengalaman dalam pengolahan data Survei GPS Tugas dan tanggung jawab : a) Melakukan pekerjaan pengukuran titik ikat (Benchmark) dengan GPS b) Bertanggung jawab menjaga dan menggunakan peralatan survey. c) Menggambar sketsa pengukuran di lapangan. d) Mengolah data hasil pengamatan GPS Geodetik e) Melaporkan hasil pekerjaan kepada Geodetic Engineer serta masalah-masalah yang dihadapi. 4. Support Kriteria : a) Minimal SMP – SMA. b) Berpengalaman dalam hal membantu proyek seperti: mengemudi, angkat barang dan lain-lain. c) Giat dan tekun. Tugas dan tanggung jawab : a) Mengantarkan tim ke tempat tujuan. b) Mengemudi dengan aman dan nyaman. 1.5 Alat dan Keperluan logistik Tabel 3.3.1 List keperluan logistik No 1 Alat GPS Geodetik Hi Target Jumlah 15 15 Keterangan Baik 2 3 4 5 6 7 8 9 10 11 12 13 GPS Garmin Penginapan Bintang 3 Jas Hujan / Ponco Handy Talky Kertas A0/A4 Meteran Printer Catridge / Tinta Plotter Safety Shoes Rompi Survey Helm Survey Mobil 7 9 15 15 2 Paket 15 2 1 26 26 26 7 Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik 1.6 Perencanaan titik referensi Terdapat 150 titik referensi dengan 340 baseline dan 30 common baseline yang terukur. Gambar 3.4.1 Titik-titik referensi hasil plotting dengan google earth 16 Gambar 3.4.2 Baseline yang dibentuk dari titik-titik referensi Gambar diatas merupakan hasil dari baseline yang diukur dimana rincian sebagai berikut: Jumlah titik : 150 titik. Jumlah Baseline : 340 baseline. Jumlah Common Baseline : 30 Common Baseline 17 3.4 Timeline pengerjaan Tabel 3.4.1 timeline pengerjaan No Kegiatan Minggu ke- Hari ke- 1 Waktu Kegiatan 2 3 4 1 Penyerahan proposal 2 3 Penandatangan Persiapan dan kontrak perencanaan 4 Mobilisasi ke tempat survei 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 5 survei awal 6 7 8 9 Perencanaan Pelaksanaan Pengolahan Penyajian teknis pengukuran data data 10 Jumlah orang 11 Orang yang bekerja 12 Pembaya ran Team Leader 1 10% Team Leader + Asisten 3 30% TL + Asisten + Surveyor + Support 5 30% TL + Asisten + Surveyor + Support 26 20% TL + Asisten 3 TL + Asisten 3 18 10% 3.5 Teknis pengukuran titik referensi Tabel 3.5.1 Teknis pengukuran tim 1 No Mobilisasi ke survey area Sesi Baseline 2 1 4 5 Mobilisasi ke survey area 7 2 9 10 Mobilisasi ke survey area 12 3 14 15 Mobilisasi ke survey area 18 GP049GP062 GP049GP050 GP049GP051 GP049GP123 GP049GP039 08.0010.00 1 GP049, GP062, GP050, GP051, GP123, GP039 GP062 -> GP027 1 GP049GP027 GP027GP039 GP039GP123 GP123GP051 GP051GP050 11.0013.00 1 GP049, GP027, GP050, GP051, GP123, GP039 GP049 -> GP062, GP027 -> GP128, GP051 -> GP063, GP123 -> GP129, GP039 -> GP052 1 GP050GP062 GP062GP128 GP128GP063 GP063GP129 GP129GP052 14.0016.00 1 GP050, GP062, GP128, GP063, GP129, GP052 GP062 -> GP051, GP052 -> GP123 1 07.00-08.00 16 17 Minggu 13.00-14.00 11 13 Perpindahan 10.00-11.00 6 8 Posisi Alat 07.00-08.00 1 3 Hari Jam 1 GP050GP0128 GP050GP063 GP063GP051 08.0010.00 2 19 GP050, GP063, GP128, GP051, GP129, GP123 GP050-> GP123, GP063-> GP052, GP128-> GP116, GP051-> GP053, GP129-> GP041 1 GP051GP129 GP129GP123 19 20 Mobilisasi ke survey area 10.00-11.00 21 22 23 2 24 25 Mobilisasi ke survey area 27 3 29 30 Mobilisasi ke survey area 32 1 34 35 Mobilisasi ke survey area 36 37 38 GP052-> GP039, GP053-> GP040, GP041-> GP111, GP112-> GP027 1 GP123GP116 GP116GP039 GP039GP040 GP040GP111 GP111GP027 14.0016.00 2 GP123, GP116, GP039, GP040, GP111, GP027 GP123-> GP027, GP116-> GP016, GP039-> GP017, GP040-> GP028, GP111-> GP108, GP027-> GP018 1 07.00-08.00 31 33 11.0013.00 2 GP123, GP052, GP116, GP053, GP041, GP112 13.00-14.00 26 28 GP123GP052 GP052GP116 GP116GP053 GP053GP041 GP041GP112 2 GP027GP016 GP016GP017 GP017GP028 GP028GP108 GP108GP018 GP016GP111 GP111GP017 GP017GP040 08.0010.00 3 11.0013.00 3 20 GP027, GP016, GP017, GP028, GP108, GP018 GP027-> GP111, GP108-> GP040, GP018-> GP112 10.00-11.00 GP016-> GP112, GP016, GP111-> GP029, GP111, GP017-> GP117, GP017, GP040-> GP124, GP040, GP028-> GP130, GP028, GP112 GP112-> GP064 1 1 GP040GP028 GP028GP112 39 40 Mobilisasi ke survey area 13.00-14.00 41 42 43 3 44 45 Mobilisasi ke survey area 47 1 49 50 Mobilisasi ke survey area 52 2 54 55 Mobilisasi ke survey area 58 1 GP064GP076 GP076GP075 GP075GP134 GP134GP074 GP074GP128 08.0010.00 4 GP064, GP076, GP075, GP134, GP074, GP128 GP064-> GP063, GP076-> GP129, GP128-> GP052 1 GP074GP063 GP063GP134 GP134GP129 GP129GP075 GP075GP052 11.0013.00 4 GP074, GP063, GP134, GP129, GP075, GP052 GP074-> GP052, GP063-> GP076, GP134-> GP064, GP129-> GP124, GP075-> GP053, 1 13.00-14.00 56 57 GP112-> GP076, GP029-> GP075, GP117-> GP134, GP124-> GP074, GP130-> GP128 10.00-11.00 51 53 14.0016.00 3 GP112, GP029, GP117, GP124, GP130, GP064 07.00-08.00 46 48 GP112GP029 GP029GP117 GP117GP124 GP124GP130 GP130GP064 3 GP052GP076 GP052GP064 GP064GP052 14.0016.00 4 21 GP052, GP076, GP064, GP052, GP053, GP124 GP052-> GP040, GP076-> GP117, GP064-> GP029, GP052-> GP028 1 GP052GP053 GP053GP124 59 60 Mobilisasi ke survey area 07.00-08.00 61 62 63 1 64 65 Mobilisasi ke survey area 67 2 69 70 Mobilisasi ke survey area 72 3 74 75 Mobilisasi ke survey area 78 1 GP112GP018 GP018GP109 GP109GP019 GP019GP113 GP113GP042 11.0013.00 5 GP112, GP018, GP109, GP019, GP113, GP042 GP018-> GP029, GP113-> GP117 1 GP112GP109 GP109GP029 GP029GP019 GP019GP117 GP117GP042 14.0016.00 5 GP112, GP109, GP029, GP019, GP117, GP042 GP112-> GP042, GP109-> GP054, GP029-> GP066, GP019-> GP065, GP117-> GP135, GP042-> GP077 1 07.00-08.00 76 77 GP053-> GP112, GP040-> GP018, GP117-> GP109, GP029-> GP019, GP028-> GP113, GP108-> GP042 13.00-14.00 71 73 08.0010.00 5 GP053, GP040, GP117, GP029, GP028, GP108 10.00-11.00 66 68 GP053GP040 GP053GP117 GP053GP029 GP053GP028 GP028GP108 1 GP042GP054 GP054GP066 GP066GP065 08.0010.00 6 22 GP042, GP054, GP066, GP065, GP135, GP077 GP042-> GP024, GP065-> GP124, GP135-> GP130, GP077-> GP065 1 GP065GP135 GP135GP077 79 80 Mobilisasi ke survey area 10.00-11.00 81 82 83 2 84 85 Mobilisasi ke survey area 87 3 89 90 Mobilisasi ke survey area 92 1 94 95 Mobilisasi ke survey area 98 1 GP077GP141 GP141GP140 GP140GP139 GP139GP085 GP085GP074 14.0016.00 6 GP077, GP141, GP140, GP139, GP085, GP074 GP077-> GP085, GP140-> GP134, GP085-> GP075, GP074-> GP076 1 GP085GP134 GP085GP075 GP075GP139 GP139GP076 GP076GP141 08.0010.00 7 GP085, GP134, GP075, GP139, GP076, GP141 GP085-> GP140, GP134->GP091, GP075-> GP092, GP139-> GP142, GP076-> GP078, GP141-> GP131 1 10.00-11.00 96 97 GP024-> GP077, GP124-> GP141, GP054-> GP140, GP130-> GP139, GP066-> GP085, GP065-> GP074 07.00-08.00 91 93 11.0013.00 6 GP024, GP124, GP054, GP130, GP066, GP065 13.00-14.00 86 88 GP024GP124 GP124GP054 GP054GP130 GP130GP066 GP130GP065 2 GP140GP091 GP091GP092 GP092GP142 11.0013.00 7 23 GP140, GP091, GP092, GP142, GP078, GP131 GP140-> GP141, GP092-> GP077, GP131-> GP135 1 GP142GP078 GP078GP131 99 100 Mobilisasi ke survey area 13.00-14.00 101 102 103 3 104 105 Mobilisasi ke survey area 107 1 109 110 Mobilisasi ke survey area 112 2 114 115 Mobilisasi ke survey area 118 1 GP065GP078 GP078GP066 GP066GP131 GP131GP054 GP054GP055 08.0010.00 8 GP065, GP078, GP066, GP131, GP054, GP055 GP065-> GP055, GP078-> GP118, GP066-> GP030, GP131-> GP110, GP054-> GP020, GP055-> GP015 2 GP055GP118 GP118GP030 GP030GP110 GP110GP020 GP020GP015 11.0013.00 8 GP055, GP118, GP030, GP110, GP020, GP015 GP055-> GP113, GP015-> GP019 2 13.00-14.00 116 117 GP091-> GP065, GP141-> GP078, GP142-> GP066, GP077-> GP131, GP078-> GP054, GP135-> GP055 10.00-11.00 111 113 14.0016.00 7 GP091, GP141, GP142, GP077, GP078, GP135 07.00-08.00 106 108 GP091GP141 GP141GP142 GP142GP077 GP077GP078 GP078GP135 3 GP113GP118 GP113GP030 GP113GP110 14.0016.00 8 24 GP113, GP118, GP030, GP110, GP020, GP019 GP113-> GP015, GP118-> GP014, GP030-> GP109, GP110-> GP103, GP020-> GP108 2 GP113GP020 GP020GP019 119 120 Tabel 3.5.2 Teknis pengukuran tim 2 No Mobilisasi ke survey area Sesi Baseline 122 1 124 2 3 GP011GP017 GP011GP016 GP012GP009 GP011GP012 GP012GP107 129 130 Mobilisasi ke survey area 1 08.0010.00 GP015, GP019, GP014, GP109, GP103, GP108 GP015-> GP018, GP019-> GP107, GP014-> GP108, GP109-> GP012, GP103-> GP028, GP108-> GP011 1 1 11.0013.00 GP018, GP107, GP108, GP012, GP028, GP011 GP018-> GP011, GP108-> GP017, GP028-> GP016, GP011-> GP009 1 GP011-> GP013, GP016-> GP014, GP012-> GP015, GP009-> GP110, GP107-> GP021 1 13.00-14.00 131 132 135 Minggu 10.00-11.00 127 134 GP015GP019 GP019GP014 GP014GP109 GP109GP103 GP018GP107 GP107GP108 GP108GP012 GP012GP028 GP028GP011 126 133 Perpindahan GP103GP018 125 Mobilisasi ke survey area 128 Posisi Alat 07.00-08.00 121 123 Hari Jam 1 25 14.0016.00 GP011, GP017, GP016, GP012, GP009, GP107 Mobilisasi ke survey area 07.00-08.00 1 GP107GP013 GP013GP014 GP014GP015 GP015GP110 GP015GP021 2 GP021GP031 GP031GP043 GP043GP056 GP056GP067 GP067GP079 3 GP079GP143 GP143GP093 GP093GP148 GP148GP142 GP142GP078 1 GP142GP143 GP143GP078 GP078GP079 GP079GP131 GP131GP067 136 137 138 139 140 Mobilisasi ke survey area 142 144 145 Mobilisasi ke survey area 147 149 150 Mobilisasi ke survey area 152 154 155 GP021-> GP143, GP031-> GP093, GP043-> GP148, GP056-> GP142, GP067-> GP143 2 11.0013.00 GP021, GP031, GP043, GP056, GP067, GP079 1 2 14.0016.00 GP079, GP143, GP093, GP148, GP142, GP078 GP093-> GP067, GP148-> GP131 1 GP142-> GP131, GP067-> GP056, GP143-> GP055, GP078-> GP043, GP079-> GP118, 1 07.00-08.00 151 153 1 13.00-14.00 146 148 08.0010.00 10.00-11.00 141 143 2 GP107, GP013, GP014, GP015, GP110, GP021 GP107-> GP031, GP013-> GP043, GP014-> GP056, GP015-> GP067, GP110-> GP079 3 26 08.0010.00 GP142, GP067, GP143, GP078, GP079, GP131 GP131-> GP031 Mobilisasi ke survey area 10.00-11.00 2 GP131GP056 GP056GP055 GP055GP043 GP043GP118 GP118GP031 3 GP031GP030 GP030GP021 GP021GP110 GP021GP022 GP021GP032 1 GP022GP015 GP022GP032 GP032GP114 GP114GP119 GP119GP125 2 GP125GP068 GP068GP080 GP080GP144 GP144GP149 156 157 158 159 160 Mobilisasi ke survey area 162 164 165 Mobilisasi ke survey area 167 169 170 Mobilisasi ke survey area 173 174 GP031-> GP022, GP030-> GP015, GP021-> GP119, GP110-> GP114, GP022-> GP125 3 14.0016.00 GP031, GP030, GP021, GP110, GP022, GP032 1 GP022-> GP125, GP015-> GP068, GP032-> GP080, GP119-> GP149, GP125-> GP093 4 08.0010.00 GP022, GP015, GP032, GP114, GP119, GP125 1 GP125-> GP143, GP068-> GP079, GP093-> GP067 1 10.00-11.00 171 172 1 07.00-08.00 166 168 11.0013.00 13.00-14.00 161 163 3 GP131, GP056, GP055, GP043, GP118, GP031 GP131-> GP030, GP056-> GP021, GP055-> GP110, GP043-> GP022, GP118-> GP032 4 27 11.0013.00 GP125, GP068, GP080, GP144, GP149, GP093 GP149GP093 175 Mobilisasi ke survey area 13.00-14.00 176 177 178 3 179 180 Mobilisasi ke survey area 182 1 184 187 2 189 190 Mobilisasi ke survey area 192 GP067-> GP119, GP068-> GP031, GP056-> GP114, GP125-> GP021, GP043-> GP022, GP119-> GP023 1 1 GP022GP023 GP119-> GP023, GP031-> GP033, GP114-> GP120, GP021-> GP044, GP022-> GP057, GP023-> GP132 GP023GP033 GP033GP120, 13.00-14.00 GP023, GP023-> GP033, GP136, GP120, GP033-> GP044, GP145, 14.0016.00 GP067GP068 GP068GP056 GP056GP125 GP125GP043 5 08.0010.00 GP067, GP068, GP056, GP125, GP043, GP119 10.00-11.00 186 191 1 4 GP149, GP143, GP144, GP079, GP080, GP067 GP043GP119 185 Mobilisasi ke survey area 188 GP149-> GP119, GP143-> GP068, GP144-> GP056, GP079-> GP125, GP080>GP043 07.00-08.00 181 183 GP149GP143 GP143GP144 GP144GP079 GP079GP080 GP080GP067 3 GP119GP031 GP031GP114 GP021GP022 GP021GP114 5 5 28 11.0013.00 14.0016.00 GP119, GP031, GP114, GP021, GP022, GP023 1 GP120GP044 GP044GP057 GP057GP132 193 194 195 Mobilisasi ke survey area 197 1 199 200 Mobilisasi ke survey area 202 2 204 205 Mobilisasi ke survey area 207 3 209 GP094GP095 GP095GP145 GP145GP144 GP080GP145 GP080GP136 6 11.0013.00 GP136GP068 GP068GP132 GP132GP125 GP125GP057 6 14.0016.00 7 08.0010.00 GP057GP119 210 Mobilisasi ke survey area 211 6 08.0010.00 GP132, GP136, GP145, GP094, GP149, GP144 GP132-> GP095, GP149-> GP080 1 GP094-> GP125, GP095-> GP068, GP145-> GP132, GP144-> GP057, GP080-> GP119 GP094, GP095, GP145, GP144, GP080, GP136 1 GP136-> GP119, GP068-> GP044, GP132-> GP032, GP125-> GP120, GP057-> GP022, GP119-> GP024 1 13.00-14.00 206 208 GP132GP136 GP136GP145 GP145GP094 GP094GP149 GP094GP144 10.00-11.00 201 203 GP120-> GP094, GP044-> GP149, GP057-> GP144 07.00-08.00 196 198 GP057, GP132 1 GP119GP044 29 GP136, GP068, GP132, GP125, GP057, GP119 07.00-08.00 GP119, GP119-> GP044, GP024, 1 GP044GP032 GP032GP120 GP120GP022 212 213 214 GP120GP024 215 Mobilisasi ke survey area 217 2 219 3 1 GP086GP145 GP086GP136 GP136GP087 GP136GP081 GP081GP057 222 224 225 Mobilisasi ke survey area 227 230 11.0013.00 1 7 14.0016.00 GP069, GP081, GP087, GP086, GP150, GP095 GP069-> GP145, GP150-> GP136, GP095-> GP057 1 GP086-> GP069, GP145-> GP058, GP136-> GP044, GP087-> GP120, GP081-> GP045 2 07.00-08.00 226 229 7 GP024, GP023, GP115, GP045, GP058, GP069 GP024-> GP069, GP023-> GP081, GP115-> GP087, GP045-> GP086, GP058-> GP150, GP069-> GP095 13.00-14.00 GP069GP081 GP081GP087 GP087GP086 GP086GP150 GP150GP095 221 228 GP024GP023 GP024GP115 GP115GP045 GP045GP058 GP058GP069 220 Mobilisasi ke survey area 223 GP044-> GP023, GP032-> GP115, GP120-> GP045, GP022-> GP058, GP024-> GP069 10.00-11.00 216 218 GP032, GP120, GP022, GP024 8 30 08.0010.00 GP086, GP145, GP136, GP087, GP081, GP057 Mobilisasi ke survey area 10.00-11.00 231 232 233 2 234 GP057GP069 GP057GP058 GP058GP044 GP058GP120 11.0013.00 GP120GP045 235 Mobilisasi ke survey area 2 GP087-> GP070, GP150-> GP126, GP097-> GP059, GP146-> GP121, GP082-> GP034, GP070-> GP025 2 13.00-14.00 239 GP087GP150 GP150GP097 GP097GP146 GP146GP082 240 GP082GP070 236 237 238 8 GP057, GP069, GP058, GP044, GP120, GP045 GP057-> GP087, GP069-> GP150, GP058-> GP097, GP044-> GP146, GP120-> GP082, GP045-> GP070 3 8 14.0016.00 GP087, GP150, GP097, GP146, GP082, GP070 Tabel 3.5.3 Teknis pengukuran tim 3 No Mobilisasi ke survey area Sesi Baseline 242 244 245 Mobilisasi ke survey area Posisi Alat Perpindahan Minggu 07.00-08.00 241 243 Hari Jam 1 GP070GP126 GP126GP059 GP059GP121 GP121GP034 GP034GP025 17 08.0010.00 GP070, GP126, GP059, GP121, GP034, GP025 GP070-> GP034, GP126> GP024, GP059-> GP045, GP121> GP126, GP034-> GP069, GP025> GP082 10.00-11.00 31 1 1 GP034GP024 GP034GP045 GP045GP126 GP126GP069 GP069GP082 1 GP087GP097 GP087GP146 GP087GP082 GP097GP096 GP096GP088 2 GP088GP083 GP083GP137 GP137GP071 GP071GP072 GP072GP060 2 GP060GP046 GP046GP035 GP035GP025 GP025GP024 GP025GP026 246 247 248 249 250 Mobilisasi ke survey area 252 254 255 Mobilisasi ke survey area 257 259 260 Mobilisasi ke survey area 262 264 265 Mobilisasi ke survey area 17 14.0016.00 GP087, GP097, GP146, GP082, GP096, GP088 GP087-> GP083, GP097> GP137, GP146-> GP071, GP082> GP072, GP096-> GP060 1 18 08.0010.00 GP088, GP083, GP137, GP071, GP072, GP060 GP088-> GP060, GP083> GP046, GP137-> GP035, GP071> GP025, GP072-> GP024, GP060> GP026 1 10.00-11.00 261 263 1 07.00-08.00 256 258 11.0013.00 GP034-> GP087, GP024> GP097, GP045-> GP146, GP126> GP096, GP069-> GP088 13.00-14.00 251 253 17 GP034, GP024, GP045, GP126, GP069, GP082 18 11.0013.00 GP060, GP046, GP035, GP025, GP024, GP026 GP035-> GP121, GP025> GP059, GP024-> GP070, GP026> GP071 13.00-14.00 32 1 2 GP046GP121 GP046GP059 GP059GP060 GP060GP070 GP070GP071 3 GP070GP083 GP083GP146 GP146GP088 GP088GP098 GP098GP083 3 GP096GP098 GP098GP137 GP137GP089 GP089GP072 GP072GP133 3 GP133GP060 GP060GP127 GP127GP046 GP046GP122 GP122GP035 266 267 268 269 270 Mobilisasi ke survey area 272 274 275 Mobilisasi ke survey area 277 279 280 Mobilisasi ke survey area 282 284 285 Mobilisasi ke survey area 19 08.0010.00 GP070, GP083, GP146, GP088, GP098, GP083 GP070-> GP096, GP083> GP089, GP146-> GP137, GP088> GP072, GP083-> GP133 1 19 11.0013.00 GP096, GP098, GP137, GP089, GP072, GP133 GP096-> GP133, GP098> GP060, GP137-> GP127, GP089> GP046, GP072-> GP122, GP133> GP035 1 13.00-14.00 281 283 1 10.00-11.00 276 278 14.0016.00 GP046-> GP083, GP121> GP146, GP059-> GP088, GP060> GP098, GP071-> GP083 07.00-08.00 271 273 18 GP046, GP121, GP059, GP060, GP070, GP071 19 14.0016.00 GP133, GP060, GP127, GP046, GP122, GP035 GP133-> GP035, GP060> GP036, GP127-> GP025, GP046> GP026, GP122-> GP037, GP035> GP038 07.00-08.00 33 1 4 GP035GP036 GP036GP025 GP036GP026 GP026GP037 GP037GP038 4 GP038GP048 GP048GP047 GP047GP061 GP061GP073 GP073GP084 4 GP084GP138 GP138GP147 GP147GP090 GP090GP100 GP100GP099 5 GP098GP099 GP099GP089 GP089GP147 GP089GP138 GP138GP072 286 287 288 289 290 Mobilisasi ke survey area 292 294 295 Mobilisasi ke survey area 297 299 300 Mobilisasi ke survey area 302 304 305 Mobilisasi ke survey area 20 11.0013.00 GP038, GP048, GP047, GP061, GP073, GP084 GP038-> GP138, GP048> GP147, GP047-> GP090, GP061> GP100, GP073-> GP099 1 20 14.0016.00 GP084, GP138, GP147, GP090, GP100, GP099 GP084-> GP098, GP147> GP089, GP090-> GP138, GP100> GP072 1 07.00-08.00 301 303 1 13.00-14.00 296 298 08.0010.00 10.00-11.00 291 293 20 GP035, GP036, GP025, GP026, GP037, GP038 GP035-> GP038, GP036> GP048, GP025-> GP047, GP026> GP061, GP037-> GP073, GP038> GP084 21 08.0010.00 GP098, GP099, GP089, GP147, GP138, GP072 GP098-> GP090, GP099> GP084, GP089-> GP073, GP147> GP133, GP072-> GP127 10.00-11.00 34 1 5 GP138GP090 GP090GP084 GP090GP073 GP073GP133 GP133GP127 5 GP127GP122 GP122GP061 GP122GP047 GP047GP036 GP036GP048 6 GP036GP037 GP036GP038 GP038GP048 GP048GP061 GP061GP133 6 GP011GP008 GP088GP005 GP005GP002 GP002GP001 GP003GP001 306 307 308 309 310 Mobilisasi ke survey area 312 314 315 Mobilisasi ke survey area 317 319 320 Mobilisasi ke survey area 322 324 325 Mobilisasi ke survey area 21 14.0016.00 GP127, GP122, GP061, GP047, GP036, GP048 GP127-> GP036, GP122> GP037, GP047-> GP038, GP036> GP133 1 22 08.0010.00 GP036, GP037, GP038, GP048, GP061, GP133 GP036-> GP011, GP037> GP008, GP038--> GP005, GP048> GP002, GP061-> GP001, GP133> GP003 1 10.00-11.00 321 323 1 07.00-08.00 316 318 11.0013.00 13.00-14.00 311 313 21 GP138, GP090, GP084, GP073, GP133, GP127 GP138-> GP127, GP090> GP122, GP084-> GP061, GP073> GP047, GP133-> GP036, GP127> GP048 22 11.0013.00 GP011, GP008, GP005, GP002, GP001, GP003 GP011-> GP102, GP001> GP104 13.00-14.00 35 1 6 GP003GP002 GP002GP102 GP102GP005 GP102GP008 GP102GP104 7 GP104GP011 GP104GP012 GP104GP009 GP009GP105 GP105GP010 7 GP001GP004 GP004GP007 GP007GP101 GP101GP006 GP006GP106 7 GP106GP015 GP106GP014 GP106GP010 GP010GP013 GP013GP105 326 327 328 329 330 Mobilisasi ke survey area 332 334 335 Mobilisasi ke survey area 337 339 340 Mobilisasi ke survey area 342 344 345 Mobilisasi ke survey area 23 08.0010.00 GP104, GP011, GP012, GP009, GP105, GP010 GP104-> GP001, GP011> GP004, GP012-> GP007, GP009> GP101, GP105-> GP006, GP010> GP106 1 23 11.0013.00 GP001, GP004, GP007, GP101, GP006, GP106 GP001-> GP106, GP004> GP105, GP007-> GP014, GP101> GP010, GP006-> GP013. GP106> GP105 1 13.00-14.00 341 343 1 10.00-11.00 336 338 14.0016.00 07.00-08.00 331 333 22 GP003, GP002, GP102, GP005, GP008, GP104 GP003-> GP104, GP002> GP011, GP102-> GP012, GP005> GP009, GP008-> GP105, GP104> GP010 23 14.0016.00 GP106, GP015, GP014, GP010, GP013, GP105 GP106-> GP006, GP015> GP004, GP014-> GP003, GP010> GP103, GP013-> GP102 07.00-08.00 36 1 8 GP006GP004 GP006GP003 GP006GP103 GP103GP102 GP006GP105 8 GP103GP105 GP103GP009 GP103GP003 GP103GP006 GP006GP101 8 GP004GP101 GP101GP106 GP106GP006 GP006GP010 GP010GP014 9 GP100GP073 GP073GP048 GP073GP133 GP133GP084 GP084GP072 346 347 348 349 350 Mobilisasi ke survey area 352 354 355 Mobilisasi ke survey area 357 359 360 Mobilisasi ke survey area 362 364 365 Mobilisasi ke survey area 24 11.0013.00 GP103, GP105, GP009, GP003, GP006, GP101 GP103-> GP004, GP105> GP106, GP009-> GP010, GP003> GP014 2 24 14.0016.00 GP004, GP101, GP106, GP006, GP010, GP014 GP004-> GP100, GP101> GP073, GP106-> GP048, GP006> GP133, GP010-> GP084, GP014> GP072 2 07.00-08.00 361 363 2 13.00-14.00 356 358 GP004-> GP009, GP102> GP101 10.00-11.00 351 353 24 08.0010.00 GP006, GP004, GP003, GP103, GP102, GP105 25 08.0010.00 GP100, GP073, GP048, GP133, GP084, GP072 GP100-> GP104, GP073> GP011, GP048-> GP012, GP133> GP009, GP084-> GP105, GP072> GP010 10.00-11.00 37 2 366 367 368 369 370 9 GP015GP007 GP007GP022 GP007GP0106 GP007GP023 GP022GP015 25 11.0013.00 GP104, GP011, GP012, GP009, GP105, GP010 Selesai 2 3.6 Rancangan Anggaran Biaya Tabel 3.6.1 Biaya selama pengukuran titik referensi Biaya Transportasi No 1 2 Jenis Sewa Mobil Avanza Operasional / Hari Kuantitas Lama Peminjaman / hari 250000 7 9 BBM 100000 7 9 Operasional / Bahan atau Hari Kuantitas Lama Peminjaman / hari Jumlah 750000 15 9 IDR 101,250,000.00 50000 7 9 300000 9 12 30000 15 beli Jumlah Total Jumlah IDR 15,750,000.00 IDR 6,300,000.00 IDR 22,050,000.00 Biaya Pengadaan & Logistik No 1 2 3 4 Jenis GPS Geodetik Hi Target GPS Garmin Penginapan Bintang 3 Jas Hujan / Ponco 5 Handy Talky 25000 15 9 6 Kertas A0/A4 500000 2 Paket beli 38 IDR 3,150,000.00 IDR 32,400,000.00 IDR 450,000.00 IDR 3,375,000.00 IDR 1,000,000.00 7 meteran 25000 15 beli 8 Printer 100000 2 9 9 Catridge / Tinta Plotter 200000 1 beli 10 Safety Shoes 50000 26 9 11 Rompi Survey 50000 26 9 12 Helm Survey 50000 26 9 13 Konsumsi 75000 26 9 Jumlah Total IDR 50,000.00 IDR 1,800,000.00 IDR 200,000.00 IDR 11,700,000.00 IDR 11,700,000.00 IDR 11,700,000.00 IDR 17,550,000.00 IDR 196,325,000.00 Biaya personil No Jenis Operasional / Hari Kuantitas Lama Kerja / Hari 1 Tim Leader 1000000 1 25 2 Asisten Leader 750000 3 25 3 Surveyor 500000 15 9 4 Supir 200000 7 9 26 Total Biaya tim awal No Jenis 1 Mobil 2 BBM 3 konsumsi 4 Handy Talky 5 GPS Garmin 6 Surveyor 7 Supir Operasional / hari 250000 100000 75000 25000 50000 500000 200000 39 Kuantitas Lama kerja / Hari 2 3 2 3 5 3 3 3 2 3 2 3 2 3 Jumlah IDR 25,000,000.00 IDR 56,250,000.00 IDR 67,500,000.00 IDR 12,600,000.00 IDR 161,350,000.00 Jumlah IDR 1,500,000.00 IDR 600,000.00 IDR 1,125,000.00 IDR 225,000.00 IDR 300,000.00 IDR 3,000,000.00 IDR 1,200,000.00 IDR 7,950,000.00 Total Biaya Total Pajak 33% (Keuntungan 15%, PPN 10%, PPH 6%, Bunga bank 2%) Total Pembayaran 40 IDR 387,675,000.00 IDR 127,932,750.00 IDR 515,607,750.00 DAFTAR PUSTAKA Abidin, H. Z. (2006). Penentuan Posisi dengan GPS dan Aplikasinya. Jakarta: PT Pradnya Paramitha. 41