Skip to main content
There has been relatively little empirical research into the causes of research misconduct. To begin to address this void, the authors collected data from closed case files of the Office of Research Integrity (ORI). These data were in the... more
    • by 
    •   10  
      Applied EthicsOrganizational CultureMultidimensional ScalingResearch Misconduct
    • by 
    • by 
    •   6  
      ArchitectureDisaster StudiesPost-conflict Reconstruction and DevelopmentEmergency Shelter
    • by 
    •   2  
      Architectural EducationArchitecture Education
    • by  and +4
    •   13  
      Medical SciencesMusicEducationArchitecture
En noviembre de 2013, una de las mayores tormentas tropicales registradas en la historia azotó Filipinas, el segundo país más propenso del mundo a ser afectado por desastres naturales según el ‘World Risk Report 2014’. Un equipo del grupo... more
    • by  and +1
    •   7  
      Bamboo ArchitecturePost disaster housing reconstructionPost Disaster HousingTemporary Housing
One of the critical aspects of sheltering after a disaster is the divergence between providing for short-term needs (emergency or temporary shelter) and long-term needs (permanent housing). However, more often than not, short-term housing... more
    • by 
    •   8  
      ArchitectureUrban DesignPost disaster housing reconstructionPost-Disaster Shelter & Reconstruction
Building permanent accommodation after a disaster takes time for reasons including the removal of debris, the lack of available land, and the procurement of resources. In the period in-between, affected communities find shelter in... more
    • by 
    •   6  
      Post Disaster ReconstructionPost-Disaster Shelter & ReconstructionPost Disaster HousingTransitional Shelters
En agosto de 2016 se constituye la Mesa Intersectorial de Habitabilidad Transitoria, instancia compuesta por diversas instituciones, convocada por la Oficina Nacional de Emergencia con el objeto de discutir propuestas de mejora en torno a... more
    • by  and +1
    •   2  
      Post Disaster ReconstructionPost-Disaster Shelter & Reconstruction
Although the international displacement of people caused by the Syrian conflict has dominated the media for the past several years, an inside story that is less visible requires more attention: that of internal displacement. More than... more
    • by 
    •   4  
      Emergency ShelterHome, Belonging and DisplacementDisplacementShelter Design and Development
Chile has experienced two of the world’s ten strongest earthquakes in recorded history. Building codes are revised after large seismic events have led to safer behaviour of buildings, especially in urban areas, and have significantly... more
    • by  and +1
    •   6  
      Post Disaster ReconstructionPost Disaster RecoveryPost disaster housing reconstructionPost-Disaster Shelter & Reconstruction
El artículo aborda el papel que desempeñaron los avisos que se publicaron en un conjunto de revistas de arquitectura chilenas entre 1930 y 1950, en la construcción, difusión e instalación de una significación sociocultural de la idea... more
    • by  and +1
    •   3  
      PublicidadEspacios DomésticosInfraestructura urbana
cost of the building in the Philippines is around 469GBP, with an approximate construction time of 7 days by a team of 4 people. The cost of the house in the UK was: 3,556GBP due to the high cost of the imported materials.
    • by 
    • by 
Materiales / Materials Estructura en bambú Ø 3, 5 y 10 cm, hilo de pescar (monofilamento de 1,8 mm), techo de paja, fundaciones de concreto, terminaciones de bambú Ø 3 cm, pantallas de bambú / Bamboo structure Ø 3, 5 and 10 cm, fishing... more
    • by 
    • Architecture
This scoping review explores the bamboo construction situation in Pakistan, including the species available, where they grow, built examples, perceptions, barriers to their use and the potential of the material, aiming to enable... more
    • by 
    •   2  
      Materials EngineeringCivil Engineering
This article analyses how energy efficiency regulatory frameworks have been developed in Argentina, Brazil, Mexico and Chile, within a context of developing countries, and it discusses if this context has been able to influence a culture... more
    • by 
    • Sustainability
cost of the building in the Philippines is around 469GBP, with an approximate construction time of 7 days by a team of 4 people. The cost of the house in the UK was: 3,556GBP due to the high cost of the imported materials. Image 25: Side... more
    • by 
In the face of a natural catastrophe, resistance is a necessary but not sufficient condition. A building can withstand an earthquake or a flood, but that does not mean that the life it held will go back to be developed in a normal way.... more
    • by 
    • by 
    • Business