International Journal of Built Environment and Sustainability
The COVID-19 pandemic has generated a wide range of socioeconomic disruption, which causes devast... more The COVID-19 pandemic has generated a wide range of socioeconomic disruption, which causes devastating in numerous aspects. Our knowledge of the true health of the construction industry under the ravage of COVID-19 outbreak is largely based on very limited data. This study aims to assess the impact of pandemic on the construction industry through an investigation in Vietnam. Data were collected through 129 respondents whose online questionnaire survey completed according to their recent direct or indirect participation in delivering construction projects during the spread. The implications of COVID-19 on the construction industry were examined based on simple percentage analysis and Relative Importance Index approaches. Three principal facets of the construction industry were considered: firms' business activities, project performance, and workforce demand. The findings highlighted the multilevel, multidimensional nature of the epidemic consequences on the construction sector. Notably, the revenue and profitability, in a general sense, have decreased during the COVID-19 period, while most of the production and business costs had remained unchanged. Further, the pandemic was argued to impair construction practitioners' incomes and mental health and sabotage projects' schedule and cost.
International Journal of Building Pathology and Adaptation
Purpose-This study aims to investigate the impact of primary building information modelling (BIM)... more Purpose-This study aims to investigate the impact of primary building information modelling (BIM)-related factors, extracted from the literature on the subject, on construction project performance. Design/methodology/approach-Based on data collected from 134 BIM users, this study used structural equation modelling to assess the impact of these factors in five main BIM-related factor clusters. Findings-The results of the analysis confirmed the reliability and validity of the research design and outcomes. The findings indicated that the BIM-related external factors cluster is the most influential cluster affecting construction project performance. BIM-related project factors and BIM-related technological factors also had a significant impact on project performance. These were followed by the BIM-related management factors cluster, while the BIM-related human factors cluster had a low impact on project performance. Research limitations/implications-This study will contribute to fostering BIM adoption and implementation in the construction industry in developing countries. Originality/value-This study has filled a crucial knowledge gap by providing information on manageable primary BIM-related factors affecting construction project performance.
The transport system is considered the "backbone" of the urban development. Along with the rapid ... more The transport system is considered the "backbone" of the urban development. Along with the rapid economic development, the urban road transport system is being paid attention and invested by Hanoi city. By the year 2050, The Hanoi municipal government is expected to complete and hand over for use about 317 urban road transport projects. Due to the high demands of social and economic efficiency, the urban road transport projects in Hanoi face many risks. In which, there are 13 high dangerous risks for the urban road transport project in Hanoi. These risks have the high probability and severity impacted on the outcome of the projects. The project participant's risk management standpoint will determine the solutions to respond the respective risks, thereby affecting the results of the project. In this paper, the authors compare the risk management standpoint of three main project participants, including owner/project management board, consultant and main contractor/subcontractor. The difference of the risk management standpoint is shown clearly by the project participants' assessments of 13 high dangerous risks.
Introduction: Building Information Modeling (BIM) is characterized by potential benefits at many ... more Introduction: Building Information Modeling (BIM) is characterized by potential benefits at many phases of the construction project life cycle. However, no comprehensive study has been conducted to evaluate the benefits of BIM adoption and implementation for project stakeholders in the Vietnamese construction industry context. Methods: This study aimed to identify and evaluate the benefits of BIM adoption and implementation in construction projects based on the perception of project stakeholders through data collection from 159 valid construction practitioners. The reliability and validity tests were performed to analyze collected data by SPSS 22 software. Results: The results demonstrated that four primary clusters of the project stakeholders received benefits when BIM was adopted in construction projects: architectural and structural design units (10 benefits), facility management units (8 benefits), contractors (6 benefits), and owners (6 benefits). These clusters accounted for 58.954%, 5.975%, 4.682%, and 3.736%, respectively, of the variance that characterized the benefits of BIM adoption. The findings indicated that 'improve the quality of design drawings', and 'minimize conflicts/changes' were the most significant BIM benefits for architectural and structural design units, whereas 'convenient for managing project data' and 'easy planning and resource mobilization' were the top benefits for facility management units. For contractors, 'minimize construction errors' and 'construction cost saving' were the most prominent benefits. Besides, BIM brought owners such striking benefits as 'maximize project performance' and 'easier to choose investment options'.
Tóm tắt: Hợp đồng là văn bản pháp lý ràng buộc quyền và nghĩa vụ các bên tham gia hợp đồng. Hợp đ... more Tóm tắt: Hợp đồng là văn bản pháp lý ràng buộc quyền và nghĩa vụ các bên tham gia hợp đồng. Hợp đồng xây dựng có ý nghĩa quan trọng trong quản lý quá trình sản xuất, là cơ sở căn cứ đầu tiên để các bên xử lý khi xảy ra tranh chấp. Tuy nhiên, giữa các văn bản pháp luật về hợp đồng xây dựng ở nước ta còn tồn tại nhiều vấn đề chưa thống nhất và chưa đầy đủ. Bài báo này sẽ đề cập đến một số nội dung của vấn đề này. Từ khóa: Hợp đồng xây dựng, văn bản pháp luật, quá trình sản xuất
Abstract: Contracts are legal document to bind the parties. Construction contracts have important implications in the management of production processes and are the first basis for dispute settlement. This article aims to study and complete some contents of disunion between legal documents on construction contracts. Keywords: Construction contracts, legal, production processes
Abstract:
Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển ... more Abstract: Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển rất quan tâm, nhất là trong lĩnh vực phát triển cơ sở hạ tầng (CSHT) giao thông đường bộ (GTĐB). Bài báo tổng hợp những nhân tố tác động đến sự thành công của dự án PPP, trong đó phân tích nhân tố có ý nghĩa quyết định là vai trò của Nhà nước, để thúc đẩy đầu tư theo hình thức đối tác công tư (PPP), đặc biệt đối với các dự án phát triển CSHT GTĐB.
Keywords: Đối tác công tư (PPP), cơ sở hạ tầng giao thông đường bộ, nhân tố tác động, sự thành công, vai trò của Nhà nước.
Tóm tắt:
Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó cô... more Tóm tắt: Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó công tác quản lý chất lượng quá trình thi công xây dựnglà một trong những yếu tố quyết định đến chất lượng công trình. Qua điều tra khảo sát, nhóm tác giả đã đánh giá thực trạngcủa công tác quản lý chất lượng thi công xây dựng công trình trên địa bàn Hà Nội hiện nay. Từ đó, nhóm tác giả đề xuất ra mô hình quản lý chất lượng toàn diện ứng dụng cho quá trình thi công xây dựng công trình dựa trên các nguyên tắc của hệ thống quản lý chất lượng toàn diện. Đây là một trong những giải pháp bền vững nhằm nâng cao chất lượng thi công xây dựng công trình ở nước ta hiện nay. Từ khóa: Quản lý chất lượng toàn diện, thi công xây dựng,đơn vị thi công,
ABSTRACT: The quality in construction depends on various factors, of which, project quality management is deemed as the most important one. Through conducting survey, the authors drew the big picture of construction quality manage¬ment in Hanoi. On that basis, the authors proposed the model of total quality management that is applicable to construction phase of contracting companies. This is expected to be a sus¬tainable solution to improve the construction project quality in Vietnam. Keywords: Total quality management, construction, execu¬tion units.
TA reasonable option for construction works will be effectively contributed to ensure effectivene... more TA reasonable option for construction works will be effectively contributed to ensure effectiveness, cost, time reduction and quality. This article aims to study and complete the evaluating method of selecting option for construction, hence, helps contractors to choose the most reasonable option that satify all requirements and interests.
USMCA 2014 : 13th International Symposium on New Technologies for Urban Safety of Mega Cities in Asia (Seiken Sympsium 78), 2014
There is an increasing number of construction activities in Hanoi, which affects the daily life o... more There is an increasing number of construction activities in Hanoi, which affects the daily life of citizen there because of noise, dust or accidents. To minimize these harms, implementation schedule of construction projects should be controlled. However, most construction projects in Hanoi to be time delays, both leading to exceeding initial time and cost budget of clients, contractors and bothering urban inhabitants’ life. The paper constructed a questionnaire, basing on interviews with stakeholders, which is distributed among Vietnamese contractors for identifying and evaluating the risks in terms of time in the construction phase of projects in Hanoi. Results found four main groups of causing time delays: (1) by accident factors, (2) technique and management factors, (3) poor supervision and (4) government policies. Then, the paper puts forward some recommendations for the Contractors to prevent, deal with and manage time risk encountered in construction projects for carrying out safe, efficient and quality construction activities in Hanoi context, the capital of Vietnam.
There is an increasing number of construction activities in Hanoi, which affects to the daily lif... more There is an increasing number of construction activities in Hanoi, which affects to the daily life of citizen there because of noise, dust or accidents. To minimize these harms, implementation schedule of construction projects should be controlled. However, most construction projects in Hanoito be time delays, both leading to exceeding initial time and cost budget of clients, contractors and bothering urban inhabitants’ life. The paper constructed a questionnaire, basing on interview with stakeholders, which is distributed among Vietnamese contractors for identifying and evaluating the risks in terms of time in construction phase of projects in Hanoi. Results found four main groups of causing time delays: (1) by accident factors, (2) technique and management factors, (3) poor supervision and (4) government policies.Then, the paper puts forward some recommendations for the Contractors to prevent, deal with and manage time risk encountered in construction projects for carrying out safe, efficient and quality construction activities in Hanoi context, the capital of Vietnam. Keywords: time-related risk, construction delay, construction projects in Hanoi
International Journal of Built Environment and Sustainability
The COVID-19 pandemic has generated a wide range of socioeconomic disruption, which causes devast... more The COVID-19 pandemic has generated a wide range of socioeconomic disruption, which causes devastating in numerous aspects. Our knowledge of the true health of the construction industry under the ravage of COVID-19 outbreak is largely based on very limited data. This study aims to assess the impact of pandemic on the construction industry through an investigation in Vietnam. Data were collected through 129 respondents whose online questionnaire survey completed according to their recent direct or indirect participation in delivering construction projects during the spread. The implications of COVID-19 on the construction industry were examined based on simple percentage analysis and Relative Importance Index approaches. Three principal facets of the construction industry were considered: firms' business activities, project performance, and workforce demand. The findings highlighted the multilevel, multidimensional nature of the epidemic consequences on the construction sector. Notably, the revenue and profitability, in a general sense, have decreased during the COVID-19 period, while most of the production and business costs had remained unchanged. Further, the pandemic was argued to impair construction practitioners' incomes and mental health and sabotage projects' schedule and cost.
International Journal of Building Pathology and Adaptation
Purpose-This study aims to investigate the impact of primary building information modelling (BIM)... more Purpose-This study aims to investigate the impact of primary building information modelling (BIM)-related factors, extracted from the literature on the subject, on construction project performance. Design/methodology/approach-Based on data collected from 134 BIM users, this study used structural equation modelling to assess the impact of these factors in five main BIM-related factor clusters. Findings-The results of the analysis confirmed the reliability and validity of the research design and outcomes. The findings indicated that the BIM-related external factors cluster is the most influential cluster affecting construction project performance. BIM-related project factors and BIM-related technological factors also had a significant impact on project performance. These were followed by the BIM-related management factors cluster, while the BIM-related human factors cluster had a low impact on project performance. Research limitations/implications-This study will contribute to fostering BIM adoption and implementation in the construction industry in developing countries. Originality/value-This study has filled a crucial knowledge gap by providing information on manageable primary BIM-related factors affecting construction project performance.
The transport system is considered the "backbone" of the urban development. Along with the rapid ... more The transport system is considered the "backbone" of the urban development. Along with the rapid economic development, the urban road transport system is being paid attention and invested by Hanoi city. By the year 2050, The Hanoi municipal government is expected to complete and hand over for use about 317 urban road transport projects. Due to the high demands of social and economic efficiency, the urban road transport projects in Hanoi face many risks. In which, there are 13 high dangerous risks for the urban road transport project in Hanoi. These risks have the high probability and severity impacted on the outcome of the projects. The project participant's risk management standpoint will determine the solutions to respond the respective risks, thereby affecting the results of the project. In this paper, the authors compare the risk management standpoint of three main project participants, including owner/project management board, consultant and main contractor/subcontractor. The difference of the risk management standpoint is shown clearly by the project participants' assessments of 13 high dangerous risks.
Introduction: Building Information Modeling (BIM) is characterized by potential benefits at many ... more Introduction: Building Information Modeling (BIM) is characterized by potential benefits at many phases of the construction project life cycle. However, no comprehensive study has been conducted to evaluate the benefits of BIM adoption and implementation for project stakeholders in the Vietnamese construction industry context. Methods: This study aimed to identify and evaluate the benefits of BIM adoption and implementation in construction projects based on the perception of project stakeholders through data collection from 159 valid construction practitioners. The reliability and validity tests were performed to analyze collected data by SPSS 22 software. Results: The results demonstrated that four primary clusters of the project stakeholders received benefits when BIM was adopted in construction projects: architectural and structural design units (10 benefits), facility management units (8 benefits), contractors (6 benefits), and owners (6 benefits). These clusters accounted for 58.954%, 5.975%, 4.682%, and 3.736%, respectively, of the variance that characterized the benefits of BIM adoption. The findings indicated that 'improve the quality of design drawings', and 'minimize conflicts/changes' were the most significant BIM benefits for architectural and structural design units, whereas 'convenient for managing project data' and 'easy planning and resource mobilization' were the top benefits for facility management units. For contractors, 'minimize construction errors' and 'construction cost saving' were the most prominent benefits. Besides, BIM brought owners such striking benefits as 'maximize project performance' and 'easier to choose investment options'.
Tóm tắt: Hợp đồng là văn bản pháp lý ràng buộc quyền và nghĩa vụ các bên tham gia hợp đồng. Hợp đ... more Tóm tắt: Hợp đồng là văn bản pháp lý ràng buộc quyền và nghĩa vụ các bên tham gia hợp đồng. Hợp đồng xây dựng có ý nghĩa quan trọng trong quản lý quá trình sản xuất, là cơ sở căn cứ đầu tiên để các bên xử lý khi xảy ra tranh chấp. Tuy nhiên, giữa các văn bản pháp luật về hợp đồng xây dựng ở nước ta còn tồn tại nhiều vấn đề chưa thống nhất và chưa đầy đủ. Bài báo này sẽ đề cập đến một số nội dung của vấn đề này. Từ khóa: Hợp đồng xây dựng, văn bản pháp luật, quá trình sản xuất
Abstract: Contracts are legal document to bind the parties. Construction contracts have important implications in the management of production processes and are the first basis for dispute settlement. This article aims to study and complete some contents of disunion between legal documents on construction contracts. Keywords: Construction contracts, legal, production processes
Abstract:
Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển ... more Abstract: Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển rất quan tâm, nhất là trong lĩnh vực phát triển cơ sở hạ tầng (CSHT) giao thông đường bộ (GTĐB). Bài báo tổng hợp những nhân tố tác động đến sự thành công của dự án PPP, trong đó phân tích nhân tố có ý nghĩa quyết định là vai trò của Nhà nước, để thúc đẩy đầu tư theo hình thức đối tác công tư (PPP), đặc biệt đối với các dự án phát triển CSHT GTĐB.
Keywords: Đối tác công tư (PPP), cơ sở hạ tầng giao thông đường bộ, nhân tố tác động, sự thành công, vai trò của Nhà nước.
Tóm tắt:
Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó cô... more Tóm tắt: Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó công tác quản lý chất lượng quá trình thi công xây dựnglà một trong những yếu tố quyết định đến chất lượng công trình. Qua điều tra khảo sát, nhóm tác giả đã đánh giá thực trạngcủa công tác quản lý chất lượng thi công xây dựng công trình trên địa bàn Hà Nội hiện nay. Từ đó, nhóm tác giả đề xuất ra mô hình quản lý chất lượng toàn diện ứng dụng cho quá trình thi công xây dựng công trình dựa trên các nguyên tắc của hệ thống quản lý chất lượng toàn diện. Đây là một trong những giải pháp bền vững nhằm nâng cao chất lượng thi công xây dựng công trình ở nước ta hiện nay. Từ khóa: Quản lý chất lượng toàn diện, thi công xây dựng,đơn vị thi công,
ABSTRACT: The quality in construction depends on various factors, of which, project quality management is deemed as the most important one. Through conducting survey, the authors drew the big picture of construction quality manage¬ment in Hanoi. On that basis, the authors proposed the model of total quality management that is applicable to construction phase of contracting companies. This is expected to be a sus¬tainable solution to improve the construction project quality in Vietnam. Keywords: Total quality management, construction, execu¬tion units.
TA reasonable option for construction works will be effectively contributed to ensure effectivene... more TA reasonable option for construction works will be effectively contributed to ensure effectiveness, cost, time reduction and quality. This article aims to study and complete the evaluating method of selecting option for construction, hence, helps contractors to choose the most reasonable option that satify all requirements and interests.
USMCA 2014 : 13th International Symposium on New Technologies for Urban Safety of Mega Cities in Asia (Seiken Sympsium 78), 2014
There is an increasing number of construction activities in Hanoi, which affects the daily life o... more There is an increasing number of construction activities in Hanoi, which affects the daily life of citizen there because of noise, dust or accidents. To minimize these harms, implementation schedule of construction projects should be controlled. However, most construction projects in Hanoi to be time delays, both leading to exceeding initial time and cost budget of clients, contractors and bothering urban inhabitants’ life. The paper constructed a questionnaire, basing on interviews with stakeholders, which is distributed among Vietnamese contractors for identifying and evaluating the risks in terms of time in the construction phase of projects in Hanoi. Results found four main groups of causing time delays: (1) by accident factors, (2) technique and management factors, (3) poor supervision and (4) government policies. Then, the paper puts forward some recommendations for the Contractors to prevent, deal with and manage time risk encountered in construction projects for carrying out safe, efficient and quality construction activities in Hanoi context, the capital of Vietnam.
There is an increasing number of construction activities in Hanoi, which affects to the daily lif... more There is an increasing number of construction activities in Hanoi, which affects to the daily life of citizen there because of noise, dust or accidents. To minimize these harms, implementation schedule of construction projects should be controlled. However, most construction projects in Hanoito be time delays, both leading to exceeding initial time and cost budget of clients, contractors and bothering urban inhabitants’ life. The paper constructed a questionnaire, basing on interview with stakeholders, which is distributed among Vietnamese contractors for identifying and evaluating the risks in terms of time in construction phase of projects in Hanoi. Results found four main groups of causing time delays: (1) by accident factors, (2) technique and management factors, (3) poor supervision and (4) government policies.Then, the paper puts forward some recommendations for the Contractors to prevent, deal with and manage time risk encountered in construction projects for carrying out safe, efficient and quality construction activities in Hanoi context, the capital of Vietnam. Keywords: time-related risk, construction delay, construction projects in Hanoi
Uploads
Papers by Nguyen Toan
Từ khóa: Hợp đồng xây dựng, văn bản pháp luật, quá trình sản xuất
Abstract: Contracts are legal document to bind the parties. Construction contracts have important implications in the management of production processes and are the first basis for dispute settlement. This article aims to study and complete some contents of disunion between legal documents on construction contracts.
Keywords: Construction contracts, legal, production processes
Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển rất quan tâm, nhất là trong lĩnh vực phát triển cơ sở hạ tầng (CSHT) giao thông đường bộ (GTĐB). Bài báo tổng hợp những nhân tố tác động đến sự thành công của dự án PPP, trong đó phân tích nhân tố có ý nghĩa quyết định là vai trò của Nhà nước, để thúc đẩy đầu tư theo hình thức đối tác công tư (PPP), đặc biệt đối với các dự án phát triển CSHT GTĐB.
Keywords: Đối tác công tư (PPP), cơ sở hạ tầng giao thông đường bộ, nhân tố tác động, sự thành công, vai trò của Nhà nước.
Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó công tác quản lý chất lượng quá trình thi công xây dựnglà một trong những yếu tố quyết định đến chất lượng công trình. Qua điều tra khảo sát, nhóm tác giả đã đánh giá thực trạngcủa công tác quản lý chất lượng thi công xây dựng công trình trên địa bàn Hà Nội hiện nay. Từ đó, nhóm tác giả đề xuất ra mô hình quản lý chất lượng toàn diện ứng dụng cho quá trình thi công xây dựng công trình dựa trên các nguyên tắc của hệ thống quản lý chất lượng toàn diện. Đây là một trong những giải pháp bền vững nhằm nâng cao chất lượng thi công xây dựng công trình ở nước ta hiện nay.
Từ khóa: Quản lý chất lượng toàn diện, thi công xây dựng,đơn vị thi công,
ABSTRACT: The quality in construction depends on various factors, of which, project quality management is deemed as the most important one. Through conducting survey, the authors drew the big picture of construction quality manage¬ment in Hanoi. On that basis, the authors proposed the model of total quality management that is applicable to construction phase of contracting companies. This is expected to be a sus¬tainable solution to improve the construction project quality in Vietnam.
Keywords: Total quality management, construction, execu¬tion units.
Keywords: time-related risk, construction delay, construction projects in Hanoi
Từ khóa: Hợp đồng xây dựng, văn bản pháp luật, quá trình sản xuất
Abstract: Contracts are legal document to bind the parties. Construction contracts have important implications in the management of production processes and are the first basis for dispute settlement. This article aims to study and complete some contents of disunion between legal documents on construction contracts.
Keywords: Construction contracts, legal, production processes
Đầu tư theo hình thức đối tác công tư (PPP) là xu hướng được các nước đang phát triển rất quan tâm, nhất là trong lĩnh vực phát triển cơ sở hạ tầng (CSHT) giao thông đường bộ (GTĐB). Bài báo tổng hợp những nhân tố tác động đến sự thành công của dự án PPP, trong đó phân tích nhân tố có ý nghĩa quyết định là vai trò của Nhà nước, để thúc đẩy đầu tư theo hình thức đối tác công tư (PPP), đặc biệt đối với các dự án phát triển CSHT GTĐB.
Keywords: Đối tác công tư (PPP), cơ sở hạ tầng giao thông đường bộ, nhân tố tác động, sự thành công, vai trò của Nhà nước.
Chất lượng của công trình xây dựng phụ thuộc vào rất nhiều yếu tố khác nhau, trong đó công tác quản lý chất lượng quá trình thi công xây dựnglà một trong những yếu tố quyết định đến chất lượng công trình. Qua điều tra khảo sát, nhóm tác giả đã đánh giá thực trạngcủa công tác quản lý chất lượng thi công xây dựng công trình trên địa bàn Hà Nội hiện nay. Từ đó, nhóm tác giả đề xuất ra mô hình quản lý chất lượng toàn diện ứng dụng cho quá trình thi công xây dựng công trình dựa trên các nguyên tắc của hệ thống quản lý chất lượng toàn diện. Đây là một trong những giải pháp bền vững nhằm nâng cao chất lượng thi công xây dựng công trình ở nước ta hiện nay.
Từ khóa: Quản lý chất lượng toàn diện, thi công xây dựng,đơn vị thi công,
ABSTRACT: The quality in construction depends on various factors, of which, project quality management is deemed as the most important one. Through conducting survey, the authors drew the big picture of construction quality manage¬ment in Hanoi. On that basis, the authors proposed the model of total quality management that is applicable to construction phase of contracting companies. This is expected to be a sus¬tainable solution to improve the construction project quality in Vietnam.
Keywords: Total quality management, construction, execu¬tion units.
Keywords: time-related risk, construction delay, construction projects in Hanoi