Monterey County Rail Extension
Salinas station will be the morning starting point for planned weekday train service to San Francisco over the Monterey County Rail Extension.
Overview
Service typeInter-city rail
StatusPlanned
LocaleNorthern California, United States
Current operator(s)Caltrain
WebsiteMonterey County Rail Extension
Route
TerminiSalinas
San Francisco (4th and King)
Distance travelled122 mi (196 km)
Service frequencyTwice daily (proposed)
    • 2× Salinas→SF (AM)
    • 2× SF→Salinas (PM)

The Monterey County Rail Extension is a planned commuter rail extension that would bring Caltrain passenger service south of its existing Gilroy, California terminus to Salinas in Monterey County, using the existing Coast Line owned by Union Pacific (UPRR). Implementation of the rail extension will occur over three phases, starting from Salinas and moving north. When construction is complete, there will be four trains operated over the extended line per weekday: two northbound trains that depart from Salinas and travel to San Francisco (4th & King) in the morning, and two southbound trains that return to Salinas in the afternoon.

History

edit

Southern Pacific

edit
 
Next-to-last Del Monte after crossing the Salinas River Trestle (April 1971)

The Southern Pacific Railroad (SP) operated intercity passenger train services in California, including the Del Monte between San Francisco and Monterey, until the inception of Amtrak in 1971. Amtrak declined to continue operation of the Del Monte and the service was discontinued.[1]: 49 

 
Map III from the Rail Passenger Development Plan (1984), showing stations and route for planned passenger service between San Francisco and Monterey

Potential restoration of passenger service to Monterey had been identified as early as 1980. A study published in 1981 was described in the Caltrans 1984-89 Rail Passenger Development Plan, which stated restoration of passenger service to Monterey could be feasible if certain conditions could be met, including track improvements along the Monterey Branch Line, construction of stations south of San Jose, and completion of the Downtown Rail Extension in San Francisco. The annual operating cost would be $2.5 million, serving an estimated 190,000 to 234,000 passengers per year, assuming a schedule similar to the former Del Monte.[1]: 49–50  Because Amtrak did not provide direct service to San Francisco, it continued to rebuff requests to restart the service in the 1980s.[1]: 50  Operation of a San Francisco–Monterey route under SP continued to be studied; with an annual ridership forecast of 210,000, gross revenue would be $1.1 million, yielding a higher first-year farebox recovery ratio than any previous public rail transit project in California.[1]: 50, 52  However, because of the large capital investment required (SP estimated $3.4–4.4 million alone would be required to rehabilitate the track), the state did not continue to purse restarting the service.[1]: 52 

Caltrain

edit

SP retained operation of the Peninsula Commute intercity commuter rail service after 1971, serving cities along the San Francisco Peninsula and Santa Clara Valley between San Francisco (4th and King station) and San Jose (Diridon) until it was first sponsored and then taken over by Caltrans between 1980 and 1985.[2] In 1985, the state took over the service, which was renamed to Caltrain and SP was retained as the contract operator. The tri-county (San Francsico, San Mateo, and Santa Clara) Peninsula Corridor Joint Powers Board (PCJPB) was formed to take over the regional rail service from the state and purchased the right-of-way between San Francisco and Tamien from SP in 1991. Subsequently, PCJPB extended Caltrain extended commuter service south of San Jose to Gilroy in July 1992.[3] Because the PCJPB owned right-of-way ends at Control Point Lick, just south of Tamien station, extended service south of there is provided under an agreement with the UPRR to use that railroad's Coast Line for a limited number of daily passenger trains. These are operated in the traditional commute direction: northbound in the morning from Gilroy to San Francisco, returning south in the afternoon. Caltrain built a layover yard in Gilroy between 6th and 10th streets, next to Gilroy Transit Center, where trains are stored overnight; tracks terminate just north of 10th and do not connect with the rest of the Coast Line.[4]

Since the inauguration of Gilroy service, the concept of a passenger rail extension to Monterey County has been considered, starting with the Caltrans-sponsored Passenger Rail Feasibility Study No. 05D423 (1992), which examined the possibility of passenger rail service between San Francisco, Monterey, Salinas, and Hollister, concluding that Salinas was a feasible origin for the commuter rail service.[5]: 214  In 1994, the Monterey County Regional Transportation Plan selected a Caltrain extension as the locally-preferred alternative.[5]: 214  The cities of Salinas and Watsonville also considered rail station improvements and construction starting in 1996, including a Draft Pajaro Valley Station Project Study Report (1997)[5]: 214  and Pajaro Railyards Area Feasibility Study (2000),[5]: 214  culminating in a study sponsored by the Transportation Agency for Monterey County (TAMC), Extension of Caltrain Commuter Service to Monterey County Business Plan (2000).[6]: 2–1 [7]

Under the Business Plan, a one-way fare from Salinas was estimated to cost approximately $3.50 and increased ridership would bring in an extra $1.4 million in annual revenue.[7]: 3  The total cost of the project was estimated to be $25.7 M, most of which would be spent for improvement/construction of the three stations ($19.5 M) and the new layover facility in Salinas ($3.8 M).[7]

Subsequently, Caltrain was approached by TAMC to extend service further south along the Coast Line from Gilroy into Monterey County. A draft of the Caltrain Extension to Monterey County Alternatives Analysis was first published in 2006 and updated in 2007;[5] four alternatives were analyzed, with most assuming inter-county commuter rail service provided by Caltrain, extended from Gilroy to either Castroville or Salinas, connecting to Monterey via Marina on a new intra-county service provided by either bus rapid transit, light rail transit, or local buses:

2006/07 Alternatives Analysis[5]: 10, 12, 48 
Alt. Main line (intercounty) service Monterey Branch Line (intracounty) service Cost ($M)
Type Service
(potential vehicles)
Type Service
(potential vehicles)
A Commuter Rail Caltrain Extension to Salinas, transfer to local service at Castroville or Salinas
(Caltrain, Superliner, or Colorado Railcar DMU)
BRT Phased implementation:

(articulated or rigid buses, trolley cars)

193
B Caltrain Extension to Salinas, transfer to local service at Salinas
(Caltrain, Superliner, or Colorado Railcar DMU)
Phase 1:
BRT

(articulated or rigid buses, trolley cars)

  • Intercity rail service (Monterey to SF)

(streetcar-like DMUs)

305
Phase 2:
LRT

(streetcar-like DMUs)

  • Intercity rail service (Monterey to SF)

(streetcar-like DMUs)

C Caltrain Extension to Salinas, transfer to local service at Castroville
(Caltrain, Superliner, or Colorado Railcar DMU)
LRT Phased implementation:

(streetcar-like DMUs)

230
D Express Bus Monterey County to Bay Area[a] Local Bus Monterey/Marina
Marina/Salinas
1.234

Also in 2006, with the Caltrain Express project completed, PCJPB began planning the electrification of the line, publishing results in the Project 2025 report (2006);[8] the electrification project would compete with MCRX for Caltrain's time and attention.

A draft environmental impact report (DEIR) published in 2006 stated the lack of public transportation options between Monterey County and the San Francisco Bay Area has resulted in increased private commuter vehicle traffic.[6]: 1–6  The 2006/07 Alternatives Analysis estimated that approximately 6,000 people commuted daily from Monterey County to the Bay Area.[5]: ES-1  According to the DEIR, traffic on U.S. Route 101 was projected to rise by up to 56% in 2020 compared to 1998 levels, resulting in unstable traffic flow from the Salinas city limits to the Santa Clara County line as a result.[6]: 1–7, Table 1-2 

The proposed extension would create new stations and stops in Pajaro (serving Watsonville in adjacent Santa Cruz County at an estimated cost of US$6,585,000 (equivalent to $9,953,000 in 2023))[6] and Castroville (at an estimated cost of US$11,150,000 (equivalent to $16,852,000 in 2023))[6] before terminating at the existing Salinas Amtrak station that currently is served by Coast Starlight passenger service. Under these plans, the Salinas station would be rebuilt as an intermodal station to connect commuter rail with Monterey-Salinas Transit buses. A layover yard would be added to accommodate Caltrain crews and maintenance, and the total cost of the Salinas improvements was estimated at US$39,705,000 (equivalent to $60,010,000 in 2023).[6] The 2006/07 Alternatives Analysis stated the Caltrain Extension would attract 1,028 riders in each direction in 2010, doubling ridership by 2030; this would be equivalent to expanding the freeway by 14 to 12 lane over the 74.2 mi (119.4 km) extension, and "when compared to the cost of constructing equivalent freeway capacity", the project would "pay for itself in one year".[5]: ES-8 

The cost of operating commuter rail from the anticipated start of service until 2030 was estimated at US$64,900,000 (equivalent to $98,089,000 in 2023) for two daily round trips, including an expansion to four round trips daily within ten years.[6] Extensions to Hollister have been proposed since at least 2003.[9] This project depends on state and federal funding availability, a possible local sales tax measure, and an agreement with UPRR, the owner of the Coast Line. This project is managed by TAMC, who released the Final Environment Impact Report (EIR) for this project in 2006.[10]

Capitol Corridor

edit
 
Existing and planned standard gauge commuter rail services in the San Francisco Bay Area, as of 2021.

In 2009, Caltrain requested that TAMC approach other train operators. TAMC subsequently opened discussions with the Capitol Corridor Joint Powers Authority (CCJPA) and the Caltrans Division of Rail to extend Capitol Corridor service south from San Jose to Salinas using the same Coast Line routing and stations.[11] The switch to Capitol Corridor was cited as an advantage, since CCJPA had experience with commuter trains sharing service on UPRR-owned freight right-of-way. Two Capitol Corridor trains would originate from Salinas in the mornings and run through to San Jose and on to Sacramento, with two evening trains making the return trip south to Salinas.[11]

By 2016, plans had shifted to favor an extension of Capitol Corridor to Salinas.[12] In 2018, the awarding of Road Repair and Accountability Act funds, Caltrain was named as the operator of the first commuter rail service to Salinas, with an extension of the Capitol Corridor service to follow.[13]

As of March 2020, two daily Caltrain round trips are planned to begin in 2022 after the completion of the Salinas layover facility and trackwork at Gilroy. Future phases will add stations at Pajaro/Watsonville and Castroville, with the potential for up to six daily round trips.[14]

Route

edit

Rail passenger traffic between Salinas and Tamien (via Gilroy) will run over the existing Union Pacific-owned Coast Subdivision. The three phases of the MCRX project are centered around the three stations that will be built or rebuilt for passenger service:

  1. Salinas (intermodal upgrade of existing Amtrak station, MCRX terminus)
  2. Pajaro/Watsonville (new intermodal infill station, connecting to routes in Santa Cruz County)
  3. Castroville (new intermodal infill station, connecting to Pacific Grove via Marina and Monterey)

Phase 1 — Salinas

edit
 
Salinas station building (Oct 2021), as rebuilt with intermodal bus connections

The first phase of the project will extend the southern terminus to the existing Salinas station and improve it. In addition, the layover yard will be moved from Gilroy to a new site in Salinas, and the Gilroy station will be upgraded to allow through-traffic by extending the PCJPB-owned tracks south across 10th Street in Gilroy to connect with the Coast Line.[15]

Work on the Salinas station has been ongoing since June 1996. The city of Salinas finalized site plans in June 1998 and acquired the 3.5-acre (1.4 ha) station site in 1999 from the UPRR, then subsequently constructed the existing Amtrak facility.[5]: 215  Construction on Salinas station was completed in January 2021 at an estimated cost of $11.2 million;[16] it has been upgraded with an intermodal transfer area using five bus bays in the station parking lot, and Lincoln Avenue has been extended across West Market Street with a new signalized intersection to facilitate traffic flows.[17]

The next part of the work will involve construction of an overnight train layover facility at Salinas, for which property acquisition is underway.[17] The cost of the Salinas train layover facility is estimated to be $25 million, and work is scheduled to start in 2023 and finish in 2024.[16] Gilroy track modifications are scheduled for approximately the same time with an estimated cost of $16 million; the scope and schedule need approval from Union Pacific.[18]

Phase 2 — Pajaro/Watsonville

edit

The next phase of the project will add a new intermodal Pajaro/Watsonville infill station to serve both Pajaro and Watsonville, at the site of the former Southern Pacific Watsonville Junction station, connecting with Santa Cruz METRO bus routes for destinations in Santa Cruz County.[19] In addition, there are several proposal to inaugurate commuter rail service over the Santa Cruz Branch Rail Line, which runs west and north along the coast between Pajaro and Davenport via Santa Cruz.[20]

Pajaro/Watsonville station would be close to the intersection of Lewis and Salinas roads, south of the eastern leg of the existing rail wye where the Coast Line and Santa Cruz Branch meet. The cost of the new intermodal station is estimated to be $69 million, including site preparation; for expanded service, an additional $30 M would be needed for modifications. The station plans are undergoing environmental review, and construction could start as early as 2026.[21]

The 2000 Business Plan report suggested that on-track speeds could be improved in the future by widening the "Betabel" curve (Curve No. 109, near the Betabel Road interchange with U.S. Highway 101), south of Gilroy. Track speeds are restricted to 50 mph (80 km/h) in this area, and drop further as trains negotiate more sharp curves at Chittenden Pass / Pajaro Gap, near a rock quarry.[7]: 28–30  The cost of these improvements, including a potential new rail tunnel, were estimated to be approximately $11 to $14 M, approximately half the estimated cost of the entire extension at the time, making it more likely to be implemented as a future improvement.[7]: 30 

Proposed Santa Cruz Branch stations
Iowa Pacific #1102 at downtown Watsonville (2014)
SP #3765 on the 1905 San Lorenzo River Bridge, a filming location for The Lost Boys
Iowa Pacific #1101 in downtown Santa Cruz (2012)
SP #2872 at Davenport (1985)

Listed distances are along the Santa Cruz Branch from the Coast Subdivision:[22]: 58 

  • Pajaro 0.32 mi (0.51 km)
  • Downtown Watsonville 1.67 mi (2.69 km)
  • Seascape 10.32 mi (16.61 km)
  • Aptos Village 12.52 mi (20.15 km)
  • Seacliff Village 13.16 mi (21.18 km)
  • New Brighton/Cabrillo 14.17 mi (22.80 km)
  • Capitola 15.68 mi (25.23 km)
  • 41st Ave 16.77 mi (26.99 km)
  • 17th Ave 17.85 mi (28.73 km)
  • Seabright 19.17 mi (30.85 km)
  • Boardwalk 19.76 mi (31.80 km)
  • Downtown Santa Cruz 20.02 mi (32.22 km)
  • Bay St/California 20.72 mi (33.35 km)
  • Westside Santa Cruz 22.05 mi (35.49 km)
  • Davenport 31 mi (50 km)

The Santa Cruz Railroad inaugurated rail service to Watsonville in 1876, having started work on the line from Santa Cruz in 1873. A second rail line was completed in 1880, connecting the city to the San Francisco Bay Area via a narrow-gauge railway built by the South Pacific Coast Railroad over the Southern Coast Ranges. Both companies were acquired by the Southern Pacific by 1887, which began offering Suntan Special excursion service from San Jose to Santa Cruz via the over-the-mountain line in July 1927.[22]: 12–13  After a winter storm shut down the mountain line and CA-17 opened paralleling its route, Southern Pacific rerouted Suntan Special service starting in summer 1940 to the longer overland route via Gilroy and Pajaro until the final excursions over Labor Day weekend, 1959;[22]: 13–14  although the route was much longer, the travel time increased by only 30 minutes because the gentler terrain allowed higher speeds.[23]

In 1996, when the Southern Pacific was being acquired and merged into Union Pacific, the Santa Cruz County Regional Transportation Commission (SCCRTC) ran several demonstration trains, including the "return of the Suntan Special" (contracted Caltrain service from San Jose to Santa Cruz via Watsonville, Aptos, and Capitola), "Coastal Cruzer" (San Jose to Santa Cruz via Aptos and Capitola using a diesel multiple unit IC3 Flexliner), and "First Night Trolley" (shuttle service within Santa Cruz using another DMU, the RegioSprinter), each attracting more than 1,000 passengers.[22]: 14  On October 12, 2012, SCCRTC acquired the Santa Cruz Branch from Union Pacific, as the Class 1 operator was not interested in allowing passenger service.[22]: 14–15 [23] A demonstration of a battery-dominant hydrogen fuel cell streetcar manufactured by TIG/m along this line was held in October 2021. Coast Futura offered the service without collecting fares to determine the feasibility of rail transit operation.[24]

The rail right-of-way owned by SCCRTC is sufficiently wide in almost all places to accommodate a single track alongside the planned 32 mi long (51 km), 12 ft wide (3.7 m) Monterey Bay Sanctuary Scenic Trail (MBSST), closely following the shoreline of Monterey Bay from the San Mateo County line to Pajaro.[22]: 17–19  The first segment of the trail in Santa Cruz, stretching 2.1 mi (3.4 km) north from milepost 28.6, is called the North Coast segment and connects to Davenport; work on North Coast is scheduled to start in fall 2024 and will take approximately a year to complete.[25][26] When finished, MBSST will extend the existing Monterey Bay Coastal Trail, spanning approximately 50 mi (80 km) from Lovers Point at Pacific Grove in the south to Wilder Ranch in the north.[27]

Phase 3 — Castroville

edit
 
Castroville depot (1975)

The final phase of the project would add the Castroville station, another multimodal infill station that will be built at Castroville,[28] connecting to a new planned local express transit service along the Monterey Branch Line down the Monterey Peninsula to Monterey via Marina.[29]

The Castroville station plans have received environmental clearance, but the $27 million required for construction have not yet been identified.[28]

Monterey Branch
 
The Monterey Bay Coastal Recreational Trail follows the abandoned rail right-of-way in Monterey (2013).

The Monterey Branch is a 19.6 mi (31.5 km) long rail line which was completed in 1879 by Southern Pacific, connecting Castroville to Lake Majella in Pacific Grove.[30]: 1  SP operated regular Del Monte passenger service between Monterey and San Francisco from 1881 until 1971, as the length of the intercity service was just 125 mi (201 km), under the 150 mi (240 km) cutoff for Amtrak to take over operations.[31] After passenger service was discontinued, the rail line continued in use for freight until 1978, when the line was shortened to the crossing at Contra Costa Street in Seaside[30]: 1  and continued to be used by United States Army trains transporting material to Fort Ord until the early 1990s.[32] Meanwhile, the cities of Monterey and Pacific Grove began acquiring segments of the southern/western end of the right-of-way in 1976, opening the first section of what would become the 18 mi (29 km) Monterey Bay Coastal Trail in 1980.[33] The Passenger Rail Feasibility Study kicked off in 1992, and made recommendations for inter- and intra-county passenger rail service, with the goals of connecting Monterey County to the Bay Area and alleviating heavy traffic along CA-1.

Del Monte at Monterey (Sep 1970)
Monterey and the Coastal Trail (Jun 2018)

TAMC contracted Amtrak to run a Talgo 8 trainset from San Francisco to Fort Ord on June 12, 1999 to demonstrate its viability and build interest in regular service,[34] but poor track conditions forced the cancellation of further demonstrations.[32] On July 13 of that year, Governor Gray Davis signed SB886 into law, which allowed TAMC to participate in any passenger rail service agreement between Caltrans and Amtrak in the San Francisco-San Jose-Monterey corridor.[35] In September 2003, TAMC purchased the remaining Monterey Branch Line right-of-way between Seaside and Castroville for $9.4 million and began planning to build a light rail transit service using the existing and replaced rails. Parsons performed an alternatives analysis in 2008, with updates in 2009 and 2011, identifying light rail as the locally-preferred alternative. The Alternatives Analysis for the Monterey Peninsula Fixed Guideway Corridor Study was again updated in 2012 by Kimley-Horn.[36] Funding has been uncertain and the light rail project, which would run 15.2 mi (24.5 km) from Castroville to Monterey, has been paused.[30]: 1 

While the application for federal transit subsidies is being considered, TAMC has asked Monterey-Salinas Transit to run bus rapid transit service over the right-of-way.[29] The MST SURF! BRT service will run over 6 mi (9.7 km) of the Monterey Branch Line right-of-way, between Marina and Sand City / Seaside.[37] The busway would run parallel to the tracks and CA-1, between the rails and Beach Range Road, stretching from Contra Costa Street (in Seaside) to Reservation Road (in Marina).[30]: Fig.3-2  SURF! would be MST's second BRT line, following the Jazz Line connecting Seaside and Monterey.[38]


List of stations

edit

Ordered from north to south, with milepost markers denoting distance from San Francisco 4th & King

Monterey County Rail Extension stations
Station Distance[b][39] Connecting services
Pajaro/Watsonville 97.0 Santa Cruz Branch Rail Line
Castroville 106.5 Monterey Branch Line
Salinas 114.9 Coast Starlight
Coast Line (continues)
Notes
  1. ^ including Caltrain stations in San Francisco, San Mateo, and Santa Clara counties
  2. ^ Milepost distance from San Francisco[5]: 218 

References

edit
  1. ^ a b c d e Rail Passenger Development Plan: 1984-89 Fiscal Years. Sacramento, CA: Division of Mass Transportation, Caltrans. 1984. OCLC 10983344.
  2. ^ "Milestones 1980s". Peninsula Corridor Joint Powers Board. Retrieved 18 August 2021.
  3. ^ "Milestones 1990s". Peninsula Corridor Joint Powers Board. Retrieved 18 August 2021.
  4. ^ "San Francisco to Lick and Gilroy Layover Yard - Aerial photo map of Joint Facility trackage" (PDF). Peninsula Corridor Joint Powers Board. June 8, 2005. Retrieved 19 August 2021.
  5. ^ a b c d e f g h i j Parsons (April 2007). Caltrain Extension to Monterey County: Alternatives Analysis (PDF) (Report). Draft. Transportation Agency for Monterey County. Retrieved 30 August 2021.
  6. ^ a b c d e f g Parsons Transportation Group (26 April 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume I: Draft Environmental Impact Report (PDF) (Report). Transportation Agency of Monterey County. Retrieved 3 July 2016.
  7. ^ a b c d e Parsons Transportation Group, Inc. (August 2000). Extension of Caltrain Commuter Service to Monterey County Business Plan (PDF) (Report). Transportation Agency for Monterey County. Retrieved 29 August 2022.
  8. ^ Project 2025 (Report). Peninsula Corridor Joint Powers Board. November 30, 2006. Archived from the original on May 4, 2007.
  9. ^ "Commuter rail service from Hollister?". Hollister Free Lance. 24 April 2003. Retrieved 16 October 2020.
  10. ^ Parsons Transportation Group (July 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume III Final Environment Impact Report (EIR) (PDF) (Report). San Jose, California: Transportation Agency of Monterey County. Retrieved December 6, 2014.
  11. ^ a b Parsons (August 2013). Addendum: Capitol Corridor Extension to Monterey County Environmental Impact Report (PDF) (Report). Transportation Agency for Monterey County. Retrieved 3 July 2016.
  12. ^ Rahaim, Nick (5 January 2017). "Frank's Fish Market will close to pave way for new Salinas train station". Monterey County Now. Retrieved 15 January 2017.
  13. ^ Johnson, Jim (9 May 2018). "Salinas commuter rail extension project gets $10 million SB 1 gas tax grant". Monterey Herald. Retrieved 11 May 2018.
  14. ^ "Monterey County Rail Extension" (PDF). Transportation Agency for Monterey County. March 2020.
  15. ^ "Monterey County Rail Extension Phase 1: Kick Start Project". Transportation Agency for Monterey County. Retrieved 30 August 2022.
  16. ^ a b "Salinas Intermodal Transportation Center" (PDF). Transportation Agency for Monterey County. January 2022. Retrieved 30 August 2022.
  17. ^ a b Schmalz, David (October 12, 2021). "A long-stalled commuter rail extension project from Gilroy to Salinas is making critical progress, and finally has an estimated arrival time". Monterey County Now. Retrieved 22 August 2022.
  18. ^ "Gilroy Station Track Project" (PDF). Transportation Agency for Monterey County. January 2022. Retrieved 30 August 2022.
  19. ^ "Monterey County Rail Extension Phase 2: Pajaro / Watsonville". Transportation Agency for Monterey County. Retrieved 30 August 2022.
  20. ^ "Rail Service Studies". Santa Cruz County Regional Transportation Commission. Retrieved 30 August 2022.
  21. ^ "Pajaro/Watsonville Multimodal Transportation Station" (PDF). Transportation Agency for Monterey County. March 2022. Retrieved 30 August 2022.
  22. ^ a b c d e f Fehr & Peers; LTK Engineering Services; RailPros (December 2015). Santa Cruz Branch Rail Line, Rail Transit Feasibility Study (PDF) (Report). Santa Cruz County Regional Transportation Commission. Retrieved 18 August 2021.
  23. ^ a b Whaley, Derek R. (September 6, 2019). "Curiosities: The Sun Tan Special". Santa Cruz Trains. Retrieved 29 August 2022.
  24. ^ Hartman, Melissa (October 15, 2021). "Streetcar demonstration opens to the public in Watsonville, Santa Cruz". Santa Cruz Sentinel. Retrieved 1 November 2021.
  25. ^ "Monterey Bay Sanctuary Scenic Trail". Federal Highway Administration, U.S. Department of Transportation. Retrieved 29 August 2022.
  26. ^ "Monterey Bay Sacntuary Scenic Trail Network (Coastal Rail Trail". Santa Cruz County Regional Transportation Commission. Retrieved 29 August 2022.
  27. ^ Alta Planning + Design (July 2007). Monterey Bay Sanctuary Scenic Trail Master Plan (PDF) (Report). Transportation Agency for Monterey County. Retrieved 29 August 2022.
  28. ^ a b "Monterey County Rail Extension Phase 3: Castroville". Transportation Agency for Monterey County. Retrieved 30 August 2022.
  29. ^ a b "Monterey Branch Line". Transportation Agency for Monterey County. Retrieved 30 August 2022.
  30. ^ a b c d Kimley–Horn (March 2021). "3: Project Description" (PDF). Initial Study/Mitigated Negative Declaration: MST SURF! Busway and Bus Rapid Transit Project, Monterey County, California (Report). Monterey-Salinas Transit. Retrieved 30 August 2022.
  31. ^ Challenger Tom (December 8, 2019). "Monterey Branch Railroad". Gribble Nation. Retrieved 30 August 2022.
  32. ^ a b "The Monterey Branch: Castroville to Pacific Grove, CA". Abandoned Rails. Retrieved 22 August 2022.
  33. ^ Stark, Laura (May 12, 2017). "California's Monterey Bay Coastal Recreation Trail". Rails to Trails Conservancy. Retrieved 29 August 2022.
  34. ^ "Rail service to Monterey County Planned" (PDF). Staying on Track. Peninsula Rail 2000. August 1999. Retrieved 22 August 2022.
  35. ^ California State Assembly. "An act to amend Section 14035 of the Government Code, relating to transportation". 1999–2000 Session of the Legislature. Statutes of California. State of California. Ch. 103 (Direct URL).
  36. ^ Kimley-Horn and Associates, Inc. (March 2012). Alternatives Analysis for the Monterey Peninsula Fixed Guideway Corridor Study (PDF) (Report). Transportation Agency for Monterey County. Retrieved 30 August 2022.
  37. ^ "SURF! Busway and Bus Rapid Transit Project". Monterey-Salinas Transit. Retrieved 30 August 2022.
  38. ^ "Our Newest Busway & Bus Rapid Transit Project: SURF! Express" (PDF). Monterey-Salinas Transit. Retrieved 30 August 2022.
  39. ^ SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation. p. 5–6.