2012
TQ2652 : Crane preparation
taken 13 years ago, near to Reigate, Surrey, England
Crane preparation
Over the weekend of 21/22 January 2012, the A217 at the top of Reigate Hill was closed to enable the removal of a temporary bridge that had been installed 6 months previously alongside Reigate Hill footbridge, while the footbridge was refurbished (see
TQ2652 : Reigate Hill Footbridge - refurbishment for view of the temporary bridge when first installed in July 2011).
In this view on the Saturday, the crane to be used for removing the temporary bridge is being prepared for use.
Image classification
(about):
Geograph
This page has been
viewed about
114 times