Nowhere Is Ready for This Heat
The Pacific Northwest is melting now, but all across America the infrastructure we have was built for the wrong century.
by Robinson Meyer
Jun 29, 2021
4 minutes
The Portland Streetcar is 20 years old, making it relatively sprightly for infrastructure in the United States. Yet it was built for a different geological epoch. On Sunday, while Portland suffered through what was then its hottest day ever, the system started to melt. As the temperature reached 112 degrees Fahrenheit, a power cable on a major bridge , twisted around some metal hardware, and scorched. Elsewhere, the wires that run above the track expanded and sagged so much that they risked touching the train cars. By mid-afternoon, the streetcar system had shut down. The trams, which run on 100 percent renewable energy, seem to offer exactly the sort of urban
You’re reading a preview, subscribe to read more.
Start your free 30 days