Assessing the safety of gas
installations in buildings
Received: 8th August, 2005
Barrie Church and Geoff Winckles
are directors of Global Energy Associates Ltd (GEA), specialist gas engineering consultants
providing technical support and tailor-made training courses in the UK and internationally. GEA
also produces a simple computer tool to assist with pipe sizing calculations as well as a range of
purging units to simplify purging and decommissioning jobs. Both authors are extremely active
in the development of UK and European installation standards. This paper represents an
updated version of a talk previously given by them to the Continuing Professional Development
Foundation in London.
Abstract
In general, the public perception of natural gas is that it is a safe
and reliable product to use for heating premises. Very few realise
how widely it is used in commerce and industry, primarily because
they rarely hear of an incident or explosion caused by gas.
Nevertheless, the risk of an incident will always be present to a
greater or lesser extent. The safety of gas installations is of
paramount importance to owners and managers of buildings.
Previously British Gas and now The Institution of Gas Engineers
and Managers (IGEM) and the Health and Safety Executive (HSE)
spend a great deal of time and effort to ensure that adequate
safety advice is available to designers and installers of gas
systems. The lack of major incidents due to gas explosions caused
by failures downstream of the meter can only reflect well on
competent workmanship and adherence to codes of practice, plus
qualified advice available from consultants. Nonetheless,
incidents do occur and the most common of these is carbon
monoxide poisoning from an appliance or flue problem. A small
number of explosions also occur due to gas leakage from pipework
within buildings. These can be very photogenic and consequently
always make bigger headlines. This paper outlines some of the
areas of responsibility for gas installations and guidance for
building designers.
Keywords:
explosions, pipework, risk assessment, gas installations, gas safety,
building safety
GAS EXPLOSIONS
Global Energy Associates Ltd
St. Johns House
St. Johns Industrial Estate
Dunmow Road, Takeley
Bishop’s Stortford CM22 6SP, UK
Tel: þ44 (0)1279 870710
Fax: þ44 (0)1279 870710
E-mail:
[email protected]
86
Mixtures of gas and air will burn, but only within limits. If there is either
too much gas or too much air, the mixture will not burn. The ‘flammability
limits’ are those air and gas mixtures at each end of the range which will
just burn. At the air-rich end it is known as a lean condition and this is the
lower flammable limit (LFL) or lower explosive limit (LEL). At the other
end where there is too little air it is gas rich and known as the upper
explosive limit (UEL) or higher flammable limit (HFL) (Figure 1).
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
Gas in buildings
Figure 1:
Conditions for a gas
explosion
Flammability limits of gas/air mixtures
For natural gas the flammable range is about 4.5 – 15 per cent gas in
air, for propane it is 2– 10 per cent and for butane it is 1.8 – 8 per cent.
As a rough guide, burner gas/air mixtures work at the upper end of the
scale and gas leaks build up the air/gas mixture from the lower end, so
explosions tend to occur from gas leaks and burning (flames) of the
richer mixtures.
If ignition of the gas/air mixture occurs in the open air, and the
combustion process is fast enough, a pressure wave may be generated
which travels ahead of the flame, at or just above the speed of sound,
related to the flame speed of the gas. For natural gas (methane) this is
comparatively slow at 0.36 m/s.
Most releases of gas result from a gas leak and occur within a room
or building. If a flammable mixture forms and is ignited then a confined
gas explosion will occur (Figure 2).
Under a completely constrained condition, a gas/air mixture can
produce a maximum pressure in excess of 8 bar. Most buildings and
heating plant are not capable of withstanding anything this high; however,
Figure 2:
Example of a gas explosion
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
87
Church and Winckles
Choose materials for
strength
internal gas explosions rarely cause complete destruction because,
either by design, or fortuitously, the pressure is relieved (vented) in
some way.
Buildings tend to be composite structures and in an explosion the
weaker parts will fail first, providing an open area venting the pressure.
If failure of the weakest structural component is not enough to prevent the
explosion pressure increasing, other components will fail in order of
strength. This carries on with higher pressures being generated until the
total pressure can be vented.
Building Regulations provide guidance on the minimum thickness of
glass for a given surface area; the bigger the area the thicker the glass.
Typically for a domestic building 20– 70 mbar breaking pressure is
expected. Domestically it is ‘usual’ that the windows represent the
external weak point of the structure and are the first component to fail and
relieve the pressure created by an explosion. Tests carried out some
years ago indicate that double glazing only increases the breaking pressure
by 30 per cent and shatter resistant films have a negligible effect on
breaking pressure.
Light internal walls such as plasterboard and breeze block and internal
doors will only withstand around a 50 mbar pressure rise. Traditional 4.5inch brick walls are stronger and withstanding pressure of 200þ mbar
would be usual. Buildings in the UK are not built with explosions in mind,
unlike countries that need to protect against earthquakes, it is therefore
important that architects do not regard the gas installation as an
afterthought.
AREAS OF RESPONSIBILITY FOR GAS INSTALLATION
Commercial gas users
must prepare a risk
assessment
88
All ‘persons’ working on gas installations within domestic or commercial
buildings, under the Gas Safety (Installation and Use) Regulations,
must be qualified under the ACS Scheme and CORGI registered. This
is neither a cheap nor an easy process.
Codes of practice, in general, express the view that designers need to be
competent, however, there is no such legal requirement (other than a
duty of care) for anyone on the design side to be qualified to the CORGI
level of installers or even to have knowledge of installation standards.
The CORGI-registered engineer becomes responsible when he
installs/commissions the installation. The contractor only has two real
options, one is to complete the work and refuse to commission it and the
other is to refuse to start until the design is correct. It is always better
to design it right than to have to retrofit it right later. The authors have
real experience of architects and mechanical engineering companies
making major mistakes in design that could have led to an incident or,
at least, unsatisfactory appliance operation.
It has always been the responsibility of all nondomestic gas users
(owners or occupiers) to understand the ways in which gas is used
on their premises and to have carried out a risk assessment in order
that any operational hazards can be identified, controlled and/or
removed. This requirement is now part of UK legislation known as
the Dangerous Substances and Explosive Atmospheres Regulations
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
Gas in buildings
(DSEAR) resulting from a European Directive known as ATEX.
DSEAR applies to all industrial and most commercial gas and oil-fired
installations with exceptions for domestic gas installations and
CE-marked gas appliances.
With new plant, the responsibility rests with the final supplier (main
building contractor) to ensure that an appropriate level of information is
provided to the installer and end user so that, in the first instance, the
equipment is safely installed and, in relation to the end user, safely
operated and maintained. This information must ensure that a sound
basis for safety is available for incorporation into a risk assessment to
be carried out by the end user.
With existing plant the user must carry out their own risk assessment
and any risks identified must be dealt with by 2006. In all cases the
designer/installer/end user is required to show that whatever means is
adopted to comply with the DSEAR is justified by risk assessment.
Fundamental design
Natural gas is lighter than air, unlike LPG, which is heavier than air. So on
the basis of safety it is logical that natural gas ventilation must always
be at a high level to deal with gas leaks. No gas pipework or appliance
should be installed without adequate ventilation.
Pipework needs to meet
gas codes of practice
Ventilation is necessary
for all pipework areas
Gas pipework
Gas installation pipes and final connections need to be installed in
accordance with The Institution of Gas Engineers and Managers’ (IGEM)
(1994) publication UP/2, Gas Installation Pipework, Boosters and
Compressors in Industrial and Commercial Premises, and tested to UP/1
or 1A. UK legislation Gas Safety (Installation and Use) Regulations
(GSIUR) requires pipework to be installed in a sound and workmanlike
manner and to be constructed of materials suitable for the purpose. Gas
pipework must not be installed in poorly or nonventilated areas,
particularly pipe ducts or joint service risers. Unventilated spaces would
constitute an ‘at risk’ situation.
Pipework in service ducts
Steel gas pipes preferably should be installed within a rising duct
ventilated at the top and bottom. On each floor there are often smoke vents
that are normally closed (sealed sufficiently to meet fire officer
requirements). In the event of a fire (smoke) the vent or vents will open to
clear the smoke.
Ventilation cannot be provided using air which is, or can be, distributed
around the building. The worry of pipes in ducts is that of leakage from
joints, this can be minimised by having as few joints as possible,
preferably welded, or an alternative would be to use continuous stainless
steel flexible pipe (BS 7838) with fittings outside the duct.
IGEM’s (1994) publication UP/2 includes a formula relating to duct
ventilation that can be applied to roof or ceiling voids. The installation
of gas pipes in large area voids is usually dealt with by using a ‘notional’
duct around the pipe, so (both) ventilation grilles to the outside preferably
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
89
Church and Winckles
Figure 3:
Installation of gas pipes in roof or ceiling voids
would be at a high level and above the pipe for natural gas, to disperse any
gas leaks (Figure 3).
It’s easier to design it
right than replace the
pipework
Pipe sizing
The sizing of gas pipework has proven in recent times to be a headache.
There is also a lack of understanding of the pressure losses across
some types of valve, especially across fire valves, and check meters. Full
bore ball valves probably have the lowest pressure drop alongside gate
valves; the ball valve has a 90-degree action with easy to see open and
closed positions and the other is multi-turn with leakage potential from
stem seals with the additional worry of debris preventing tight closing.
A cheap alternative at the larger sizes is the butterfly valve but, at low
pressures, the pressure drop can be high.
In IGEM’s (1994) publication UP/2 it is recommended that for lowpressure installations a 1 mbar total drop from the meter to the appliance
isolation valve is aimed for. The addition of an automatic safety shutoff valve (commonly called a fire valve) into pipework could have
disastrous effects on pressure drops. Equally, adding a check meter for
energy monitoring can prove problematic. The diaphragm meter will have
in excess of 1 mbar at maximum rating and a turbine meter may have
over 2 mbar. Adding a meter and a couple of valves to a system could
reduce the available pressure to below 10 mbar.
Example 1
In a recent installation, where check meters were installed into existing
pipework, the total drop across the system had grown to 10 mbar. This
situation was initially blamed on Transco, of course, for lack of pressure.
Increasing the Transco inlet pressure was too expensive, as was replacing
80m of 150mm pipe, and the only solution was to take the components
out of line.
90
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
Gas in buildings
Example 2
The designer first had underestimated the pipe sizing for the load, making
a potentially excessive pressure drop at the required gas rate. This was
not discovered until after the pipework was installed.
The mechanical and electrical (M&E) consultant’s solution was to
install a gas booster rather than replace a small length of pipe, about 20m
of 75mm diameter, which could be increased in size to 100mm.
The booster was required to operate continuously and as such a standby
was needed. With gas boosters that operate under low or no-load
conditions the gas will start to get hot and this in turn could lead to shaft
seal failure. So 20m of 50mm diameter pipe as a cooling loop was needed.
The booster room was in the middle of the building and as such
mechanical ventilation was needed. Failure of this ventilation might have
led to a build-up of gas should there have been a leak; as the system was
totally unmanned, so gas detection was also fitted. Correct design initially
would have prevented this situation.
Ventilation is always
required for gas plant
Plant-room ventilation
An assessment should be carried out of potential leakage sources (joints,
component appliance pipework, vents etc) and the likelihood of a leak
and its consequences. For example, a leak in a basement boiler house
would have more consequential concerns than one in a single-storey plant
room. Any area assessed as having a ‘risk’ would need to have some
action taken, such as regular checks on pipework tightness, regular visits
by staff aware of gas risks and, in extreme cases, gas detection systems
installed.
In the case of a basement boiler house one might consider the risk of gas
leakage leading to an explosion from threaded, flanged or compression
joints, from valve stems, from damaged flexibles or from gas booster shaft
seals. In each case the authors would use some knowledge or historical
experience of failures and apply a method to monitor and prevent their
occurrence. Prevention may be the use of a trained boiler operative to
check daily that there is no smell of gas, or to check monthly with a gas
leakage tester that there is no indication of gas leakage, or to annually
check with leak detection fluid, or to do a pressure tightness test every five
years. If none of these simple and mostly low-cost alternatives can be
employed one may wish to consider an automatic gas detection system.
Whatever automatic or manual system is applied, it will also have risks of
system failure. Will the operator forget to do it? Will the detector be
unreliable and be overridden?
Example
There was an incident in a below-ground boiler house, some years ago,
that led to a major explosion and severe damage to a high-rise building.
Fortunately there were no serious injuries or fatalities as it happened at
01:30am. Rubble was strewn over a playing field that could have killed
many children if it had happened during the day. The force was such as to
propel slabs of concrete weighing over 1 tonne onto the roof of the
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
91
Church and Winckles
22-storey building. It was considered by the HSE that a greater use of risk
assessment should have been used in determining the safety issues relating
to the location and maintenance of large plant. Within a few months,
IGEM had prepared a draft document on boiler houses (UP/10) dealing
with these issues.
GAS DETECTION
Insurers and architects often consider the use of gas detection systems
in commercial buildings. In the authors’ experience, gas detection is
fraught with problems and best designed out. Such systems, of course,
need regular maintenance and calibration but above all the location of
the detector heads needs better consideration than is given in current
standards.
Where is the best place to locate a detector head in a plant room?
Generally, they are located at ceiling level, as natural gas is lighter than
air. But in most plant rooms there is plenty of air movement, all of
which rapidly dilutes any gas leak. This means that the leak has to be
much larger before it is detected unless a more sensitive detection system
is applied at greater cost. It would be better to locate the heads nearer
to the potential point of gas leakage, but if one knows by risk assessment
where a leak may occur, why not design it out?
Design out gas
detectors
APPLIANCE INSTALLATION
Location
Appliances should be located in a safe and secure position where they will
not be damaged by other activities. The use of a purpose-built plant room
is preferred. Safe access needs to be made available for maintenance to
burners, controls, etc. For example, safe access is necessary at flue
(combustion) gas sampling points. Plant rooms and areas adjacent to an
appliance should be kept free of combustible materials and any
obstructions. The Building Regulations for England and Wales must be
applied, and most elements of construction and insulation need to have at
least a 30-minute fire integrity.
The silent killer
92
Carbon monoxide risks
Air is required for complete combustion and an adequate air supply is
essential. This is clearly reflected in IGEM UP/10 for boiler houses where
high-level ventilation is always required as high as is practicable and
above 85 per cent of the height of the plant room. Similarly, LPG
ventilation has to be within 250 mm of the floor.
There is also a balance between the levels of CO2 and O2 and the
production of carbon monoxide (CO). High levels of CO are wasteful of
fuel and may have the potential to cause very serious harm to the heat
exchanger surfaces within the appliance or to people if the flue products
can leak into occupied areas. If the flue is working fine and the appliance is
producing copious quantities of CO, technically there is not a problem as
it is all going up the flue. If the flue also fails to operate, however, there is
potential for a fatality.
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
Gas in buildings
PREPARING A RISK ASSESSMENT
Risk assessment made
easy
There are several ways of preparing a risk assessment and no one system is
better or worse than another. It all depends on what one wants from the
assessment and how it is to be applied. Some of these techniques are
complicated to use for small installations and the HSE (1999) booklet
INDG 163 provides, in the writers’ view, a more practical analysis.
The basic steps as given in HSE INDG 163 are:
— Look for the hazard, classify or identify it.
— Decide who or what may be harmed and how.
— Evaluate the risks arising from the hazards and determine whether the
existing precautions are adequate or if more should be done. This
includes identifying risk control measures, a determination of the risk,
an assessment of the significance of the risk and the preparation of a
control plan to reduce the risk.
It is vital, however, that plant and procedural risk assessments are
reviewed from time to time and especially when any change to the
design or operation takes place. One of the main strengths of performing
a risk assessment during the design stage is that it highlights potential
future problems and enables the designer to consider simpler and often
cheaper options. For example, welding or using jointless gas pipe
(eg Tracpipe) would probably be cheaper than installing gas detection
systems. Using polyethylene pipe below ground overcomes corrosion
problems. Selecting a burner that operates on low-pressure gas may be
better than using one with a gas booster which has leakage potential,
maintenance and power costs.
IGEM is producing a set of generic risk assessments (IGEM/G3) to be
used by gas consumers and contractors to take some of the mystique
out of the problem. Many of the solutions are based upon those prepared
by Global Energy Associates and have been taken from the many
assessments produced for its clients. At higher pressures, it may well be
that the use of Zone 2 electrical equipment will become the norm and
only in special cases might gas detection be vital.
CONCLUSIONS
Designers, architects and M&E engineering companies need to have an
understanding of appropriate standards and safety procedures or need to
use qualified gas consultants who can advise them. Institutions, trade
associations and specialised training establishments often run seminars
explaining the background and implications of current and new codes of
practice.
Failure of professionals to keep ahead of the game exposes them to
litigation of all sorts or, worst of all, sees them recommending to clients
that money is spent on unnecessary, so-called safety features just not
intended by legislators or standards panels. Safety regulations and codes
of practice are continuously changing and it is hard for smaller companies
to keep up to date. Keeping current is made the more difficult as
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94
93
Church and Winckles
changes are also being driven from Europe within EN standards and
there is a real need to be able to monitor new BSs and ENs. Affiliation to
(or Associateship with) IGEM is one way to keep up to date. Time and
cost are always concerns but keeping up to date is a real safety issue
and failure to do so would be hard to explain in court should an incident
occur.
References
Health and Safety Executive (HSE) (1999) ‘Five steps to risk assessment — INDG’, available at:
www.hse.gov.uk/pubns/indg.pdf.
The Institution of Gas Engineers and Managers (IGEM) (1994) UP/2, Gas Installation Pipework,
Boosters and Compressors in Industrial and Commercial Premises. IGEM, Loughborough, UK.
94
q PALGRAVE MACMILLAN LTD 1742–8262/06 $30.00
Journal of Building Appraisal
VOL.2 NO.1
PP 86–94