A suit for compensation for breach of contract upon withdrawal of sub-contractor's bid before submission of the contractor's bid.
A sub-contractor submitted his bid to a contractor, who wanted it for making an estimate for submitting his own bid. The contractor appointed a committee which approved subcontractor's bid. Like earlier transactions between the two, the contractor did not give a formal acceptance letter to the sub-contractor. Before the contractor could submit his ownbid, the sub-contractor realised a mistake, and withdrew his bid. The contractor obtained a bid from another sub-contractor, and completed the work, and filed a suit for recovering compensation alleging that there was a contract formed by the sub-contractor's bid.
Click or copy this link for the case : https://obiterdictadotin.files.wordpress.com/2019/06/mercury-builders-v-earth-movers-v2.pdf