Papers by GODELIA CANCHARI SILVERIO
The use of roadheader (RH ) equipment for the underground mining of zinc ores in the San Vicente ... more The use of roadheader (RH ) equipment for the underground mining of zinc ores in the San Vicente reservoir is analyzed. The characteristics of the ore bodies of the deposit is described in terms of technical and economic terms for removal by continuous mining system . Compared with the method of room and pillar mining with filling up currently applied , through the present value (PV ) of the cost of the two mining systems determining the continuous mining method has the lowest present value cost . The alternative of continuous mining equipment with RH without the use of explosives to break the rock, compared to the current system of mined with explosives, has other advantages , such as reducing the rocky Massif instability caused by vibrations , surface generation uniform in the excavations , reducing environmental pollution by noise, dust and gases that produce the shots and diesel equipment inside the mine . The risk to personnel handling explosives and generated significant savin...
La sobreperforación en la malla de perforación de producción en minería superficial puede reducir... more La sobreperforación en la malla de perforación de producción en minería superficial puede reducirse o eliminarse mediante el uso de cámaras de aire en el fondo de los taladros de producción. La eliminación de la sobreperforación incrementará la rentabilidad de las operaciones mineras superficiales debido a: menor costo de perforación y voladura, disminución de las vibraciones dentro y fuera del tajo, mayor estabilidad en bermas y taludes, incremento de la productividad de los equipos de perforación, carguío, acarreo, y chancado por mejora en la fragmentación del mineral de mina. Las pruebas efectuadas en una cantera de caliza con roca de dureza media demuestran la factibilidad del método.The Sub drilling length in surface mining production drilling grids, can be reduced or eliminated by addition of air chambers at the bottom of drill holes in blasting rounds. Sub drilling removal means surface mine operations revenue increase due to lower drilling and blasting costs, seismic vibrati...
The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for... more The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching facility of minerals in both, influence of seismic acceleration in the stability of tailing and clearance’s slopes. It was found that the most stable mixture from a physical and chemical point of view is three of clearance to one of tailing (3C/1T). The safety factor calculated by the Bishop algorithm SLIDE, is above 1.1 in pseudo-static conditions. In addition, there were evaluated more forms of joint storage for clearance-tailing, concluding that for the Yauricocha conditions, it can be used injections of thickened tailings through perforated pipes placed in the advancing front of the landfill. The injection can be prepared in clearing layers of 2.4 m of thickness on the pipe.En la mina Ya...
El estudio minimiza el tiempo improductivo o tiempos de espera de los equipos de carguío y acarre... more El estudio minimiza el tiempo improductivo o tiempos de espera de los equipos de carguío y acarreo entre puntos de carguío en interior mina y los puntos de descarga en superficie. Para ello se analiza el sistema existente que consiste en 4 puntos de carguío de materiales en interior mina y 4 puntos de descarga en superficie. Por aplicación de herramientas del modelo de colas se estima el costo de la espera y luego se estudia la posibilidad de reducir este costo incrementando puntos de carguío. La información que se analiza proviene de los tiempos de acarreo y demoras generadas entre los puntos de carguío y los puntos de descarga. La variable que se evalúa es el número de puntos de carguío vs. el costo de la demora de los transportadores más el costo unitario del uso de las tolvas en interior mina.The study minimizes the cycle waiting time of loading and hauling equipment between loading points of the underground mining operation and unloading points on surface. For this purpose the ...
La Universidad Nacional Mayor de San Marcos tiene 20 facultades y 59 escuelas profesionales, con ... more La Universidad Nacional Mayor de San Marcos tiene 20 facultades y 59 escuelas profesionales, con una población que supera un número aproximado de 12 000 personas que pasan un promedio de 6 horas al dia en los ambientes de la Ciudad Universitaria, En cada escuela por lo general hay una cafeteria que usan los estudiantes, docentes y el personal administrativo, todas estas personas generan residuos solidos. Uno de los problemas ambientales más serios de la sociedad actual es, sin duda, el de la generación y manejo de los residuos sólidos. La gran producción de basuras domésticas, restos de mobiliario, escombros y desmontes de los jardines obliga a establecer servicios especiales de recogida y almacenamiento de los desperdicios. Sin embargo, muchos de estos residuos se siguen vertiendo al río y a sus riberas, se acumulan en vertederos clandestinos y producen un serio impacto sobre el paisaje, la flora y la fauna del lugar. Lo que se pretende realizar con este estudio es verificar si las...
Mine equipment selection is a complex task due to numerous technical, geometrical and economical ... more Mine equipment selection is a complex task due to numerous technical, geometrical and economical variables involved. The variety of equipment manufacturers and agents carrying different models, types and sizes make the selection procedure even more complex. The mine planner does not have a tool to correctly select the equipment or fl eet for a project. Simulation fi lls the gap and contributes to this goal. This study tries to apply deterministic and probabilistic simulation approaches in selecting mining equipment using fi eld data from two surface mine operations. The deterministic model uses a one year production plan from a quarry. The equipment fl eet is selected on the basis of minimum unit cost for both drilling and excavation-haulage equipment fl eets. For the probabilistic approach the GPSS language is applied. Programs were prepared for various combinations of loaders and haulers and data from a metallic open pit mine was processed. The optimum fl eet was selected by combi...
The Antilla ore body open pit mining equipment is estimated for a total movement of 544 million m... more The Antilla ore body open pit mining equipment is estimated for a total movement of 544 million metric tons of ore and waste in 20 years of active operation. Mining equipment is evaluated from the point of view of 3 working systems and time savings on the performance system. Three working alternatives are analyzed: Alternative 1 consists of three-8 hour shifts per day, six day per week operation. Alternative 2 includes three-8 hour shifts per day, 7 day per week and alternative 3 consists of four-six hour shifts per day 7 day per week work. Equipment size is chosen as a function of daily production, pit geometry, bench height, working angle and space requirements for safe operation of each equipment. Performance parameters used in equipment estimation were taken from 3 similar mining operations. Lost time analysis on the equipment performance were also considered in order to improve utilization of the 4 types of equipment required in the open pit operation.Se estima el equipo de min...
Se analizaron los diferentes factores que influencian el espaciamiento de niveles y chimeneas. Al... more Se analizaron los diferentes factores que influencian el espaciamiento de niveles y chimeneas. Algunos de estos factores comunes a todas las operaciones mineras que influencian en el espaciamiento de niveles son: Caracteristicas del mineral y de la roca encajonante, condiciones economicas y la posibilidad de descubrir mineral en profundidad. Para el caso de chimeneas los factores de mayor influencia son las consideraciones geologicas, el metodo de minado y aspectos economicos. Se considero que variables especificas cuantificables mas importantes son el mantenimiento de chutes entre niveles y chimeneas, cuyo costo se incrementa con el tiempo de uso y el volumen de material que pasa por ellos o sea el espaciamiento y tambien la eficiencia y seguridad traducido en costo incremental con el espaciamiento. Combinando variables se obtuvo dos graficos que muestran el espaciamiento de niveles vs. costo incremental por tonelada de mineral en mantenimiento de chutes y espaciamiento de nieles v...
En yacimientos tabulares inclinados puede establecerse la direccion de profundizacion optima expr... more En yacimientos tabulares inclinados puede establecerse la direccion de profundizacion optima expresado como la ruta del minimo indice de desencapado que se traduce como la minima extraccion de esteril y maxima recuperacion de mineral. Sea que el yacimiento tenga ley uniforme o variable hay un punto de inicio de la excavacion en superficie y a cualquier profundidad que rinde los mayores ingresos si se elige una direccion optima de profundizacion lo cual puede trazarse conociendo los parametros geologicos y geometricos del yacimiento y usando conceptos matematicos fundamentales. Estos limites finales se fijan en secciones verticales geologicos y no requieren la division del yacimiento en bloques. Considerando que cualquier yacimiento mineral tabular irregular o diseminado puede traducirse aproximadamente en un cuerpo tabular regular, el metodo se aplica a todo yacimiento mineral permitiendo fijar rapidamente y en forma preliminar los limites finales en superficie.
Revista Del Instituto De Investigacion De La Facultad De Ingenieria Geologica Minera Metalurgica Y Geografica, May 3, 2012
Revista Del Instituto De Investigacion De La Facultad De Ingenieria Geologica Minera Metalurgica Y Geografica, Feb 24, 2012
en todo el campus, siguiendo estándares de calidad, de prevención de riesgos en la salud y por su... more en todo el campus, siguiendo estándares de calidad, de prevención de riesgos en la salud y por supuesto medio ambientales, según la agenda 21 y el modelo marcado por la ISO 14001. Este fue un proyecto a nivel piloto que implementamos y llevamos a cabo con la participacion de los alumnos, docentes y trabajadores administrativos de la Facultad de Ingenieria Geologica, Minera, Metalurgica y Geografica, y que nos servira como un pequeño laboratorio del cual tomaremos nota de variables las más relevantes para que funcione adecuadamente el Sistema de Gestión de Residuos Sólidos peligrosos que se propone en el presente proyecto. Recolectamos 600 unidades de pilas y evitamos la eliminación incontrolada de estos residuos sólidos peligros que pudieron ocasionar graves daños al ambiente, debido a la gran cantidad de sustancias peligrosas que contienen tales como mercurio, cadmio, manganeso en las pilas y baterias alcalinas lo que hace preciso implementar medidas para que se recojan independientemente de otras categorías de residuos. Nuestra meta fue realizar una gestión amigable con el medio ambiente y logramos la participación del 50% de los alumnos de la escuela de ingeníeria de minas , tambien logramos la colaboracion de los egresados en la gestión de los residuos sólidos peligrosos (pilas secas). Como un valor adicional Estamos cambiando habitos y costumbres en relacion al tratamiento de estos residuos solidos.
The study minimizes the cycle waiting time of loading and hauling equipment between loading point... more The study minimizes the cycle waiting time of loading and hauling equipment between loading points of the underground mining operation and unloading points on surface. For this purpose the existing loading and hauling system is first analyzed. Present system consists of four underground loading points and 4 unloading spots on surface. The waiting cost is estimated and then the increment in loading points underground is proved for reducing haulage cost which is a bearing component of the mining cost. By applying queuing techniques the possible reduction in waiting cost is obtained by increasing the number of loading points. The information gathered comes from loading and hauling times measured at site. Evaluated variables were number of loading points vs. waiting time cost of haulers and unit cost of underground ore and waste bins.
The Sub drilling length in surface mining production drilling grids, can be reduced or eliminated... more The Sub drilling length in surface mining production drilling grids, can be reduced or eliminated by addition of air chambers at the bottom of drill holes in blasting rounds. Sub drilling removal means surface mine operations revenue increase due to lower drilling and blasting costs, seismic vibrations decrease at inside and outside excavation areas, stable berms and slopes, productivity increase of drilling, loading, excavation, haulage and primary crushing equipment due to better ore fragmentation. The method was satisfactorily tested in a medium hardness rock at a quarry operation.
Revista Del Instituto De Investigacion De La Facultad De Ingenieria Geologica Minera Metalurgica Y Geografica, 2009
Control y prevenCión de inCendios en operaCiones mineras metáliCas
Uploads
Papers by GODELIA CANCHARI SILVERIO