pappers (co-author) by Luis Felipe Candido
Sustainability is addressed through the triple bottom line concept, bringing together economic, e... more Sustainability is addressed through the triple bottom line concept, bringing together economic, environmental and social issues, related management actions and their impacts for better building sites. Lean concepts are incorporated into the economic side of the model, while a new concept – wellbeing – expands the social pillar. Green attributes render themselves naturally to the environmental part of the triple bottom line approach. A model to evaluate how and in what degree lean, green and wellbeing concepts are being applied in site layout managing is developed using Design Science Research (DSR) propositions. This procedure is tested in three different sites in the city of Fortaleza, in the Brazilian northeast region. Results point out that the model artifact obtained through DSR is capable of synthesizing a huge number of variables both in terms of possible management actions and in terms of their sustainability outcomes. Graphical displays help to guide how sustainability might improve over time, either evaluating individual sites against their previous records or benchmarking different building projects.
O planejamento de obras de grande porte vem se tornando cada vez mais importante com o intuito de... more O planejamento de obras de grande porte vem se tornando cada vez mais importante com o intuito de diminuir os desperdícios e cumprir os prazos e os custos estimados. O objetivo desse trabalho é analisar a aplicação do método da Linha de Balanço em obras da indústria do petróleo. Para isso, utilizou-se do estudo de caso para análise de uma construção de um tanque de armazenamento de Cimento Asfáltico de Petróleo (CAP), da refinaria Petrobras/Lubnor. Foram elaborados dois cronogramas com a utilização da ferramenta de Linha de Balanço. O primeiro foi chamado de LB 1T, englobando a construção de 1 tanque de armazenamento de CAP, onde é retratado o caso da Petrobras/Lubnor. O segundo cronograma foi feito como sugestão para comparação. Trata-se da simulação da construção de 3 tanques e foi nomeado de LB 3T. Com os resultados da pesquisa foi concluído que a aplicação dessa técnica pode ser viável, desde que se encontre uma unidade de repetição que justifique a sua escolha.
A medição de desempenho de projetos de construção é uma atividade fundamental para a aferição dos... more A medição de desempenho de projetos de construção é uma atividade fundamental para a aferição dos resultados de um empreendimento. É através desse processo que é possível avaliar o desempenho alcançado para então propor ações de melhoria. Atualmente, a principal metodologia de medição utilizada pelas empresas construtoras é a físico-financeira. Está tem por finalidade aferir o progresso físico e o custo para sua realização. O presente artigo tem por objetivo analisar o modelo de medição de desempenho de uma construtora de Fortaleza, CE, através de um estudo de caso. Verificou-se que o sistema de medição físico-financeiro é incapaz de expressar o verdadeiro desempenho de um projeto de construção frente às modernas estratégias de gerencia. É imprescindível agregar aos processos de medição critérios de desempenho como qualidade e produtividade. Verificou-se também, a inabilidade com que a empresa do estudo conduzia sua sistemática de medição e o desalinhamento com sua filosofia de gestão (Construção Enxuta). Esta evidência confirma hipóteses empíricas de que as práticas de medição de desempenho na construção estão desatualizadas e precisam de mais estudos neste campo do conhecimento.
Com vista à continuidade da expansão no setor imobiliário, têm-se medidas de incentivo para const... more Com vista à continuidade da expansão no setor imobiliário, têm-se medidas de incentivo para construção civil, através da desoneração da alíquota de INSS, incidente sobre as folhas de pagamento, e a redução da alíquota de imposto sobre o Regime Especial de Tributação (RET), para empreendimentos concebidos como patrimônios de afetação. Desta forma, tem-se como objetivo avaliar o real impacto dessas medidas na rentabilidade de um empreendimento de médio padrão na cidade de Fortaleza. Realizou-se o trabalho através de um estudo de caso único, descritivo e exploratório. Os resultados caracterizam-se como aplicados e com dados quantitativos. A partir do fluxo de caixa realizado neste empreendimento, utilizou-se de conceitos sobre viabilidade econômico-financeira e fizeram-se análises comparativas entre a realidade do empreendimento e os resultados, obtidos com parâmetros advindos do novo cenário tributário. Verificou-se o impacto á redução conjunta da carga tributária e a desoneração da folha de pagamento. Logo, tem-se ganhos de 12,9% no lucro a valor presente, 10% na Taxa Interna de Retorno e 12,7% no Índice de lucratividade. O impacto é significativo e merece atenção por parte de pesquisadores e empresas.
George Nunes Soares (Universidade Federal do Ceará) [email protected]
Luís Felipe Cândid... more George Nunes Soares (Universidade Federal do Ceará) [email protected]
Luís Felipe Cândido (Universidade Federal do Ceará) [email protected]
Resumo:
A produtividade é uma ferramenta importante no processo de tomada de decisão. Muitos gestores não mensuram a produtividade de sua obra e com isso não tem o controle da execução dos seus serviços, logo do planejamento do empreendimento. Esse trabalho consiste em um estudo de caso descritivo no qual se avaliou a atividade de aterro dentro do serviço de terraplenagem. A obra reside na cidade de Teresina-PI, onde se avaliou a produtividade de três combinações diferentes de maquinário. O qual se chamou de grupo 1, 2 e 3. Avaliou-se os impactos dessas mudanças nos números de produtividade e auxiliou-se os gestores nas suas tomadas de decisões.
Palavras chave: Produtividade, tomada de decisão, Aterro.
Productivity analysis of activity in embankment grading service
Abstract
Productivity is an important tool in the decision making process. Many managers do not measure the productivity of your work and it does not control the performance of its services, then the planning of the project. This work is a descriptive case study which evaluated the activity within the embankment grading service. The work resides in the city of Teresina-PI, which evaluated the productivity of three different combinations of machinery. Which is called group 1, 2 and 3 evaluated the impacts of these changes on productivity figures and helped himself managers in their decision making.
Key-words: Productivity, decision making, embankment.
40th International Association for Housing (IAHS) World Congress, Dec 16, 2014
Serious problems of incompatibility of information generated by the design process can be found i... more Serious problems of incompatibility of information generated by the design process can be found in many works today. This is due to the complex nature of the architecture, engineering and construction industry (AEC). The platform BIM (Building Information Modeling) is a tool that contributes to improving the practice of architectural design and drafting of the entire network of the AEC industry, but this does not occur easily. Miettinen and Paavola (2014) argue are reports of implementation experience in different organizations and contexts providing knowledge about problems and bottlenecks in implementation necessary. The aim of this work is to establish a common platform for the exchange of digital information during the design process. Aiming at the trial of the benefits of BIM and synchronized collaborative work environment; visualization and the elimination of conflicts between architectural design and structural design. The method used was the case study of architectural and structural design process of a Multifamily Residential Building with Small Units. The narrative technique of storytelling is used to describe the results of a case study in a history project. Results of this work are the construction of 3D model design integrating architecture and structure; visualization and elimination of conflicts between those projects; experience of the design process in collaborative working environment; work experience based on the concept cloud computing. The interpretation of the results showing success in early visualization of conflicts between architecture and structure enabling the elimination of losses and risks of problems during construction.
40th International Association for Housing (IAHS) World Congress, Dec 16, 2014
In 2013 the Brazilian Technical Standards Association published the Brazilian standard NBR 15,575... more In 2013 the Brazilian Technical Standards Association published the Brazilian standard NBR 15,575 which comes to the performance of residential buildings by establishing quality standards; quantitative criteria; assumptions and methods of evaluation in order to measure performance. The criteria of performance standards require the review of projects aimed at improving the traditionally ones used. It is believed that the fulfillment of performance criteria increases the value of residential construction, but the literature does not provide indicators of how much the percentage increase is. Enterprises of Social Housing proportionate profit very low margins, forcing builders to pursue lower production costs. The aim of this paper is to present the percentage increase in the cost of a dwelling with performance. The method used was to measure the difference in cost between a design traditionally used in building construction and other similar uses that construction materials and systems that meet requirements of fencing systems and coverage of standard systems. This analysis of the cost of construction was carried out by modeling in virtual environment of two versions of the project in the program based on Building Information Modeling (BIM). The results indicate that the fulfillment of performance criteria increase the cost of housing construction in percentage of approximately 12% of the cost of houses built with previous projects NBR 15.575/2013. We conclude that research on the Built Environment Technology with proposals that take care of the performance criteria and the final cost of the building result in technological improvement with proposals for technological innovation. We consider contributions of this work: quantifying the additional performance cost of housing; the methodology of analysis of construction costs in BIM format and version of design that caters to the Brazilian standard performance of residential buildings.
Papers (main author) by Luis Felipe Candido
A abordagem Design Science (DS) tem sido frequentemente adotada nas áreas de Ciências Sociais Apl... more A abordagem Design Science (DS) tem sido frequentemente adotada nas áreas de Ciências Sociais Aplicadas e Engenharias. Neste artigo, a área Gestão e Economia da Construção (GEC) foi explorada, por sua interdisciplinaridade com estudos organizacionais, e pela ausência de estudos abordando a aplicação da DS nesta área, razões que conferem relevância e ineditismo ao artigo. Através de análise de conteúdo de publicações em GEC, evidenciou-se boa aderência destas pesquisas às diretrizes da DS, embora duas diretrizes sejam notadamente pouco atendidas. Predominaram artefatos do tipo modelos conceituais. O estudo propõe um framework útil para pesquisadores em DS e recomenda pesquisas complementares.
Earned Value Management (EVM) is a technique of performance measurement focused on project physic... more Earned Value Management (EVM) is a technique of performance measurement focused on project physical, financial and time progress, indicating planned and actual performance, variations of them and forecasts on final project duration and cost. It takes a step further traditional measurement tools like PERT/Cost and C/SCSC. EVM is strongly supported by Project Management Community gather around the Project Management Institute, but recently the technique is being criticized in respect to its conceptual problems and implementation difficulties. This paper aims to explore in greater depth this debate through a case study on a construction project that applied EVM as a planning and control tool. Four major problems are analyzed in the search for an enlarged list of topics the EVM approach fails to support lean construction applications. Among them are the disregard for the mobilization of resources phase and the lack of consideration of construction indirect costs. Finally, the authors concluded that EVM is just an extension of the traditional approach of measuring physical and financial advances over time. This narrow approach is insufficient to provide a comprehensive managerial tool, as became clear through the analyses of the building project under consideration.
RESUMO
Este trabalho tem por objetivo apresentar uma bateria de perguntas que testam o grau de... more RESUMO
Este trabalho tem por objetivo apresentar uma bateria de perguntas que testam o grau de conhecimento e prática de ações ligadas à construção enxuta por parte de supervisores de obras e coordenadores de projetos, na figura tanto de engenheiros de obra como arquitetos. Estas perguntas compõem o questionário de Perguntas Irrespondíveis no Contexto da Construção Civil, um dos questionários da série desenvolvida pela UFSC. Procura-se, também, identificar aquelas áreas da produção enxuta que os profissionais têm domínio a partir de sua experiência ou da assimilação de conceitos em cursos específicos como aqueles propiciados por disciplinas de um curso de especialização em gerenciamento de obras. Um grupo de 35 alunos responderam as 100 questões formuladas proporcionando a visualização dos resultados práticos dessa ferramenta os quais foram apresentados conforme a classificação sugerida por Amaral et al (2007) que sugere que a construção enxuta deve se preocupar com questões relativas aos Ciclos, ao Fluxo, a Coordenação de atividades, a Qualidade de Vida no Trabalho e a prática do Kaizen. Pode-se concluir que as principais dificuldades dos respondentes estão ligadas a dois elementos essenciais da produção enxuta, que são a Organização do Fluxo de Atividades e Estações de Trabalho e Melhoria Contínua (Kaizen).
Palavras-chave: Ensino na construção, construção enxuta, ferramentas de ensino
ABSTRACT
This paper aims to present a series of inquires that assess the level of knowledge and practices regarding the Lean Construction by supervisors and project coordinators construction like architects and construction site engineers. These questions belong to the Unanswerable Questions in the Context of Building Construction (simply called of Uquest) one of the questionnaires of a series developed by UFSC researchers to transmit Lean Construction knowledge. Is intended also, to identify the areas of Lean production which the professionals has domain from their experience or concepts assimilationby specific disciplines of post-graduation courses in Construction Management. A group of 35 experienced professionals answered the 100 formulated questions providing the practice results of the tool used: Uquest. These results were presented according to classification suggested by Amaral el al (2007). In this classification, the main concepts of Lean Construction were arranged in 5 pillars: Cycle, Flow, Coordination of activities, Safety and Quality in construction site and Kaizen Practice. As conclusion, the main barriers to Lean concepts comprehension by the respondents were related to two essential elements of Lean Production: (1) organizing the flow of activities and workstations and (2) continuous improvement (Kaizen)
Keywords: Teaching in construction, lean construction, skills for teaching
Resumo
O custeio-meta (ou target costing) é uma estratégia eficaz na busca do equilíbrio entre... more Resumo
O custeio-meta (ou target costing) é uma estratégia eficaz na busca do equilíbrio entre o custo x preço, qualidade e funcionalidade. Desenvolvida na manufatura, a aplicação destes conceitos na construção civil vem aumentando e adquirindo maturidade. Diante do exposto, a presente pesquisa é um estudo bibliométrico cujo objetivo principal é descrever o quadro de publicações sobre custeio-meta na construção civil nos últimos 5 anos (2009-2013). Como resultado, foi observado um total de 30 publicações com parcela significativa de contribuição nacional (16 publicações ou 53% da amostra). Verificou-se também que as principais fontes de publicações foram a conferência anual da comunidade da construção enxuta (IGLC, com 36%) e os encontros da ANTAC (ENTAC e SIBRAGEC, com 17%). Os temas mais recorrentes foram custeio-meta no contexto de habitações de interesse social, gerenciamento de projeto, processo de projeto e desenvolvimento de novos produtos. Por fim, pode-se destacar a contribuição de pesquisas qualitativas (33%) e 83% de estudos empíricos, o que remete a afirmativa inicial de que a aplicação do custeio-meta na construção civil está em processo de maturação. Como contribuição, espera-se atualizar e expandir os estudos que já foram desenvolvidos no tema consolidando o eixo referencial do conhecimento
Palavras-chave: construção civil, gestão de custos, custeio-meta, bibliometria.
Abstract
The target costing approach can be characterized as effective strategy to equalize cost x price, quality and functionality. Developed in manufacturing industry, the application of these concepts in construction industry has growth and acquiring maturity. Then, this paper aims to analyze the scientific publications about the target costing in building construction in the last 5 years (2009-2013) in a bibliometric approach. As result, 36 papers were found with a significant participation of Brazil (16 papers or 53% of the sample). The principal sources of publications observed were the annual IGLC conference (36%) and events of ANTAC (ENTAC e SIBRAGEC, with 17%). The most frequently themes were target costing in context of social housing, project management, project process and development of new products. Finally, the qualitative research was used in 33% of sample, while 83% from this sample was empirical study. This information reinforces the maturity process which the target costing has been improving. With this paper, authors hope provide a vision about this theme in the building industry, consolidating and spreading it like a knowledge area.
Keywords: building construction, cost management, target costing, bibliometric analysis.
ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 15., 2014, Maceió. Anais... Maceió: ANTAC, 2014., Nov 2014
RESUMO
Tento em vista materiais potencialmente recicláveis no contexto urbano, o PET (polietil... more RESUMO
Tento em vista materiais potencialmente recicláveis no contexto urbano, o PET (polietileno tereftalato) já vem sendo utilizado em diversos segmentos industriais, porém este material, ainda é pouco utilizado na construção civil. Um estudo realizado pela Associação Brasileira da Indústria do PET (ABIPET) em 2011 revelou que houve um acréscimo de 304% na recuperação do PET de 1994 a 2011, totalizando cerca 294 Ktons cujo principal destino final foi aplicações nas indústrias têxteis (39,30%), não sendo contabilizada parcela de consumo para construção civil. Assim, o presente trabalho apresenta os resultados de uma pesquisa experimental desenvolvida com o intuito de testar o uso do PET triturado em substituição da areia natural nas frações de 15%, 30% e 45% para a fabricação de blocos de concreto prensado com incorporação de PET reciclado. Foram determinados às características geométricas, os índices físicos e características mecânicas, tais como massa seca, absorção de água, condutividade térmica e resistência à compressão. Ao serem analisados os resultados, pode-se concluir que o teor que apresentou os melhores resultados foi de 15% de PET, devido ao acréscimo de sua resistência à compressão em relação aos demais teores, destacando-se ainda uma menor absorção, resultante de seu maior empacotamento e melhor homogeneidade do compósito.
Palavras-chave: Bloco de Vedação, Sustentabilidade, PET
ABSTRACT
Among the materials with potential of recycle, the PET (polyethylene terephthalate), is widely used in different industrials sectors. However, the use of this recycled material in construction industry is insignificant. In 2011, a study conducted by Brazilian Association of PET Industry (ABIPET) revealed a growth of the level of recycling of PET in 304% between 1994 and 2011. In absolute numbers this represents about 294 kilotons. This result represents the second in recycling of PET around the world, just behind of Japan. The main application of PET recycled are performed in textile industry (39,30%) and the consumption by construction industry is so small that it was not recorded in survey. Thus, this paper aims to presents the results of an experimental research developed about the use of PET recycled replacing by volume of fine aggregate in fraction of 15%, 30% and 45%. The geometric, physical and mechanical characteristics were found, between them, the dry mass, water absorption, thermal conductivity and compressive strength. Can be conclude the content that replacing of 15% of PET achieved the best results due of the biggest compressive strength, lower of water absorption, resulting from its higher homogeneity and better wrapping of composite with PET recycled.
Keywords: Concrete blocks, Sustainability, PET.
RESUMO
O Gerenciamento do Valor Agregado (Earned Value Management, EVM) ou Análise do Valor Ag... more RESUMO
O Gerenciamento do Valor Agregado (Earned Value Management, EVM) ou Análise do Valor Agregado (Earned Value Analysis, EVA) é uma técnica de medição e controle de projetos baseado na medição física, financeira e de tempo que proporciona indicadores de avanço real, variações de desempenho e previsões para conclusão do projeto. Entretanto, vários trabalhos científicos vêm descrevendo alguns problemas e limitações desta técnica como, por exemplo, a desconsideração dos fluxos de trabalho e a incompatibilidade de previsões em estágios iniciais de construção. Assim, através de um estudo de caso único, exploratório e descritivo, o presente trabalho tem por objetivo analisar o uso da técnica do EVM em um projeto de construção sob a óptica da construção enxuta. O estudo pode confirmar alguns problemas levantados em outros trabalhos, bem como expandi-los, proporcionando uma visão mais holística sobre a aplicabilidade desta técnica na construção civil, especialmente em obras cuja mentalidade enxuta é aplicada. Por fim, os autores concluem que a técnica do EVM é uma repetição da técnica de medição físico-financeira plotada no tempo e que suas limitações podem tornar o seu uso incompatível com projetos de construção.
Palavras-chave: Gerenciamento do Valor Agregado, Controle de Projetos de Construção, Construção Enxuta, Gerenciamento de Projetos.
ABSTRACT
The Earned Value Management (EVM) or Earned Value Analysis (EVA) is performance measurement technique and a project control tool based on physical, financial and time progress, providing indexes of project outcomes as actual performance, performance delays and forecasting at project conclusion. However some papers describe problems and limitations of this technique like disregard of workflows and incompatibility for early stages of work progress forecasts. Thus, through a unique case study exploratory and descriptive, this paper aims to analyze the use of EVM technique on a construction project under the lights of Lean Construction. As result, this paper confirmed some problems surveyed by others researchers as well as enlarged the list of topics which EVM approach fails to support of lean construction applications enabling a more depth and a holistic understanding about the applicability of this technique on Building Construction, especially in Lean Construction Projects. Finally, the authors concluded that EVM is just an extension of the traditional approach of measuring physical and financial advances over time what may render their use incompatible in construction projects.
Keywords: Earned Value Management, Construction Projects Control, Lean Construction, Project Management
Uploads
pappers (co-author) by Luis Felipe Candido
Luís Felipe Cândido (Universidade Federal do Ceará) [email protected]
Resumo:
A produtividade é uma ferramenta importante no processo de tomada de decisão. Muitos gestores não mensuram a produtividade de sua obra e com isso não tem o controle da execução dos seus serviços, logo do planejamento do empreendimento. Esse trabalho consiste em um estudo de caso descritivo no qual se avaliou a atividade de aterro dentro do serviço de terraplenagem. A obra reside na cidade de Teresina-PI, onde se avaliou a produtividade de três combinações diferentes de maquinário. O qual se chamou de grupo 1, 2 e 3. Avaliou-se os impactos dessas mudanças nos números de produtividade e auxiliou-se os gestores nas suas tomadas de decisões.
Palavras chave: Produtividade, tomada de decisão, Aterro.
Productivity analysis of activity in embankment grading service
Abstract
Productivity is an important tool in the decision making process. Many managers do not measure the productivity of your work and it does not control the performance of its services, then the planning of the project. This work is a descriptive case study which evaluated the activity within the embankment grading service. The work resides in the city of Teresina-PI, which evaluated the productivity of three different combinations of machinery. Which is called group 1, 2 and 3 evaluated the impacts of these changes on productivity figures and helped himself managers in their decision making.
Key-words: Productivity, decision making, embankment.
Papers (main author) by Luis Felipe Candido
Este trabalho tem por objetivo apresentar uma bateria de perguntas que testam o grau de conhecimento e prática de ações ligadas à construção enxuta por parte de supervisores de obras e coordenadores de projetos, na figura tanto de engenheiros de obra como arquitetos. Estas perguntas compõem o questionário de Perguntas Irrespondíveis no Contexto da Construção Civil, um dos questionários da série desenvolvida pela UFSC. Procura-se, também, identificar aquelas áreas da produção enxuta que os profissionais têm domínio a partir de sua experiência ou da assimilação de conceitos em cursos específicos como aqueles propiciados por disciplinas de um curso de especialização em gerenciamento de obras. Um grupo de 35 alunos responderam as 100 questões formuladas proporcionando a visualização dos resultados práticos dessa ferramenta os quais foram apresentados conforme a classificação sugerida por Amaral et al (2007) que sugere que a construção enxuta deve se preocupar com questões relativas aos Ciclos, ao Fluxo, a Coordenação de atividades, a Qualidade de Vida no Trabalho e a prática do Kaizen. Pode-se concluir que as principais dificuldades dos respondentes estão ligadas a dois elementos essenciais da produção enxuta, que são a Organização do Fluxo de Atividades e Estações de Trabalho e Melhoria Contínua (Kaizen).
Palavras-chave: Ensino na construção, construção enxuta, ferramentas de ensino
ABSTRACT
This paper aims to present a series of inquires that assess the level of knowledge and practices regarding the Lean Construction by supervisors and project coordinators construction like architects and construction site engineers. These questions belong to the Unanswerable Questions in the Context of Building Construction (simply called of Uquest) one of the questionnaires of a series developed by UFSC researchers to transmit Lean Construction knowledge. Is intended also, to identify the areas of Lean production which the professionals has domain from their experience or concepts assimilationby specific disciplines of post-graduation courses in Construction Management. A group of 35 experienced professionals answered the 100 formulated questions providing the practice results of the tool used: Uquest. These results were presented according to classification suggested by Amaral el al (2007). In this classification, the main concepts of Lean Construction were arranged in 5 pillars: Cycle, Flow, Coordination of activities, Safety and Quality in construction site and Kaizen Practice. As conclusion, the main barriers to Lean concepts comprehension by the respondents were related to two essential elements of Lean Production: (1) organizing the flow of activities and workstations and (2) continuous improvement (Kaizen)
Keywords: Teaching in construction, lean construction, skills for teaching
O custeio-meta (ou target costing) é uma estratégia eficaz na busca do equilíbrio entre o custo x preço, qualidade e funcionalidade. Desenvolvida na manufatura, a aplicação destes conceitos na construção civil vem aumentando e adquirindo maturidade. Diante do exposto, a presente pesquisa é um estudo bibliométrico cujo objetivo principal é descrever o quadro de publicações sobre custeio-meta na construção civil nos últimos 5 anos (2009-2013). Como resultado, foi observado um total de 30 publicações com parcela significativa de contribuição nacional (16 publicações ou 53% da amostra). Verificou-se também que as principais fontes de publicações foram a conferência anual da comunidade da construção enxuta (IGLC, com 36%) e os encontros da ANTAC (ENTAC e SIBRAGEC, com 17%). Os temas mais recorrentes foram custeio-meta no contexto de habitações de interesse social, gerenciamento de projeto, processo de projeto e desenvolvimento de novos produtos. Por fim, pode-se destacar a contribuição de pesquisas qualitativas (33%) e 83% de estudos empíricos, o que remete a afirmativa inicial de que a aplicação do custeio-meta na construção civil está em processo de maturação. Como contribuição, espera-se atualizar e expandir os estudos que já foram desenvolvidos no tema consolidando o eixo referencial do conhecimento
Palavras-chave: construção civil, gestão de custos, custeio-meta, bibliometria.
Abstract
The target costing approach can be characterized as effective strategy to equalize cost x price, quality and functionality. Developed in manufacturing industry, the application of these concepts in construction industry has growth and acquiring maturity. Then, this paper aims to analyze the scientific publications about the target costing in building construction in the last 5 years (2009-2013) in a bibliometric approach. As result, 36 papers were found with a significant participation of Brazil (16 papers or 53% of the sample). The principal sources of publications observed were the annual IGLC conference (36%) and events of ANTAC (ENTAC e SIBRAGEC, with 17%). The most frequently themes were target costing in context of social housing, project management, project process and development of new products. Finally, the qualitative research was used in 33% of sample, while 83% from this sample was empirical study. This information reinforces the maturity process which the target costing has been improving. With this paper, authors hope provide a vision about this theme in the building industry, consolidating and spreading it like a knowledge area.
Keywords: building construction, cost management, target costing, bibliometric analysis.
Tento em vista materiais potencialmente recicláveis no contexto urbano, o PET (polietileno tereftalato) já vem sendo utilizado em diversos segmentos industriais, porém este material, ainda é pouco utilizado na construção civil. Um estudo realizado pela Associação Brasileira da Indústria do PET (ABIPET) em 2011 revelou que houve um acréscimo de 304% na recuperação do PET de 1994 a 2011, totalizando cerca 294 Ktons cujo principal destino final foi aplicações nas indústrias têxteis (39,30%), não sendo contabilizada parcela de consumo para construção civil. Assim, o presente trabalho apresenta os resultados de uma pesquisa experimental desenvolvida com o intuito de testar o uso do PET triturado em substituição da areia natural nas frações de 15%, 30% e 45% para a fabricação de blocos de concreto prensado com incorporação de PET reciclado. Foram determinados às características geométricas, os índices físicos e características mecânicas, tais como massa seca, absorção de água, condutividade térmica e resistência à compressão. Ao serem analisados os resultados, pode-se concluir que o teor que apresentou os melhores resultados foi de 15% de PET, devido ao acréscimo de sua resistência à compressão em relação aos demais teores, destacando-se ainda uma menor absorção, resultante de seu maior empacotamento e melhor homogeneidade do compósito.
Palavras-chave: Bloco de Vedação, Sustentabilidade, PET
ABSTRACT
Among the materials with potential of recycle, the PET (polyethylene terephthalate), is widely used in different industrials sectors. However, the use of this recycled material in construction industry is insignificant. In 2011, a study conducted by Brazilian Association of PET Industry (ABIPET) revealed a growth of the level of recycling of PET in 304% between 1994 and 2011. In absolute numbers this represents about 294 kilotons. This result represents the second in recycling of PET around the world, just behind of Japan. The main application of PET recycled are performed in textile industry (39,30%) and the consumption by construction industry is so small that it was not recorded in survey. Thus, this paper aims to presents the results of an experimental research developed about the use of PET recycled replacing by volume of fine aggregate in fraction of 15%, 30% and 45%. The geometric, physical and mechanical characteristics were found, between them, the dry mass, water absorption, thermal conductivity and compressive strength. Can be conclude the content that replacing of 15% of PET achieved the best results due of the biggest compressive strength, lower of water absorption, resulting from its higher homogeneity and better wrapping of composite with PET recycled.
Keywords: Concrete blocks, Sustainability, PET.
O Gerenciamento do Valor Agregado (Earned Value Management, EVM) ou Análise do Valor Agregado (Earned Value Analysis, EVA) é uma técnica de medição e controle de projetos baseado na medição física, financeira e de tempo que proporciona indicadores de avanço real, variações de desempenho e previsões para conclusão do projeto. Entretanto, vários trabalhos científicos vêm descrevendo alguns problemas e limitações desta técnica como, por exemplo, a desconsideração dos fluxos de trabalho e a incompatibilidade de previsões em estágios iniciais de construção. Assim, através de um estudo de caso único, exploratório e descritivo, o presente trabalho tem por objetivo analisar o uso da técnica do EVM em um projeto de construção sob a óptica da construção enxuta. O estudo pode confirmar alguns problemas levantados em outros trabalhos, bem como expandi-los, proporcionando uma visão mais holística sobre a aplicabilidade desta técnica na construção civil, especialmente em obras cuja mentalidade enxuta é aplicada. Por fim, os autores concluem que a técnica do EVM é uma repetição da técnica de medição físico-financeira plotada no tempo e que suas limitações podem tornar o seu uso incompatível com projetos de construção.
Palavras-chave: Gerenciamento do Valor Agregado, Controle de Projetos de Construção, Construção Enxuta, Gerenciamento de Projetos.
ABSTRACT
The Earned Value Management (EVM) or Earned Value Analysis (EVA) is performance measurement technique and a project control tool based on physical, financial and time progress, providing indexes of project outcomes as actual performance, performance delays and forecasting at project conclusion. However some papers describe problems and limitations of this technique like disregard of workflows and incompatibility for early stages of work progress forecasts. Thus, through a unique case study exploratory and descriptive, this paper aims to analyze the use of EVM technique on a construction project under the lights of Lean Construction. As result, this paper confirmed some problems surveyed by others researchers as well as enlarged the list of topics which EVM approach fails to support of lean construction applications enabling a more depth and a holistic understanding about the applicability of this technique on Building Construction, especially in Lean Construction Projects. Finally, the authors concluded that EVM is just an extension of the traditional approach of measuring physical and financial advances over time what may render their use incompatible in construction projects.
Keywords: Earned Value Management, Construction Projects Control, Lean Construction, Project Management
Luís Felipe Cândido (Universidade Federal do Ceará) [email protected]
Resumo:
A produtividade é uma ferramenta importante no processo de tomada de decisão. Muitos gestores não mensuram a produtividade de sua obra e com isso não tem o controle da execução dos seus serviços, logo do planejamento do empreendimento. Esse trabalho consiste em um estudo de caso descritivo no qual se avaliou a atividade de aterro dentro do serviço de terraplenagem. A obra reside na cidade de Teresina-PI, onde se avaliou a produtividade de três combinações diferentes de maquinário. O qual se chamou de grupo 1, 2 e 3. Avaliou-se os impactos dessas mudanças nos números de produtividade e auxiliou-se os gestores nas suas tomadas de decisões.
Palavras chave: Produtividade, tomada de decisão, Aterro.
Productivity analysis of activity in embankment grading service
Abstract
Productivity is an important tool in the decision making process. Many managers do not measure the productivity of your work and it does not control the performance of its services, then the planning of the project. This work is a descriptive case study which evaluated the activity within the embankment grading service. The work resides in the city of Teresina-PI, which evaluated the productivity of three different combinations of machinery. Which is called group 1, 2 and 3 evaluated the impacts of these changes on productivity figures and helped himself managers in their decision making.
Key-words: Productivity, decision making, embankment.
Este trabalho tem por objetivo apresentar uma bateria de perguntas que testam o grau de conhecimento e prática de ações ligadas à construção enxuta por parte de supervisores de obras e coordenadores de projetos, na figura tanto de engenheiros de obra como arquitetos. Estas perguntas compõem o questionário de Perguntas Irrespondíveis no Contexto da Construção Civil, um dos questionários da série desenvolvida pela UFSC. Procura-se, também, identificar aquelas áreas da produção enxuta que os profissionais têm domínio a partir de sua experiência ou da assimilação de conceitos em cursos específicos como aqueles propiciados por disciplinas de um curso de especialização em gerenciamento de obras. Um grupo de 35 alunos responderam as 100 questões formuladas proporcionando a visualização dos resultados práticos dessa ferramenta os quais foram apresentados conforme a classificação sugerida por Amaral et al (2007) que sugere que a construção enxuta deve se preocupar com questões relativas aos Ciclos, ao Fluxo, a Coordenação de atividades, a Qualidade de Vida no Trabalho e a prática do Kaizen. Pode-se concluir que as principais dificuldades dos respondentes estão ligadas a dois elementos essenciais da produção enxuta, que são a Organização do Fluxo de Atividades e Estações de Trabalho e Melhoria Contínua (Kaizen).
Palavras-chave: Ensino na construção, construção enxuta, ferramentas de ensino
ABSTRACT
This paper aims to present a series of inquires that assess the level of knowledge and practices regarding the Lean Construction by supervisors and project coordinators construction like architects and construction site engineers. These questions belong to the Unanswerable Questions in the Context of Building Construction (simply called of Uquest) one of the questionnaires of a series developed by UFSC researchers to transmit Lean Construction knowledge. Is intended also, to identify the areas of Lean production which the professionals has domain from their experience or concepts assimilationby specific disciplines of post-graduation courses in Construction Management. A group of 35 experienced professionals answered the 100 formulated questions providing the practice results of the tool used: Uquest. These results were presented according to classification suggested by Amaral el al (2007). In this classification, the main concepts of Lean Construction were arranged in 5 pillars: Cycle, Flow, Coordination of activities, Safety and Quality in construction site and Kaizen Practice. As conclusion, the main barriers to Lean concepts comprehension by the respondents were related to two essential elements of Lean Production: (1) organizing the flow of activities and workstations and (2) continuous improvement (Kaizen)
Keywords: Teaching in construction, lean construction, skills for teaching
O custeio-meta (ou target costing) é uma estratégia eficaz na busca do equilíbrio entre o custo x preço, qualidade e funcionalidade. Desenvolvida na manufatura, a aplicação destes conceitos na construção civil vem aumentando e adquirindo maturidade. Diante do exposto, a presente pesquisa é um estudo bibliométrico cujo objetivo principal é descrever o quadro de publicações sobre custeio-meta na construção civil nos últimos 5 anos (2009-2013). Como resultado, foi observado um total de 30 publicações com parcela significativa de contribuição nacional (16 publicações ou 53% da amostra). Verificou-se também que as principais fontes de publicações foram a conferência anual da comunidade da construção enxuta (IGLC, com 36%) e os encontros da ANTAC (ENTAC e SIBRAGEC, com 17%). Os temas mais recorrentes foram custeio-meta no contexto de habitações de interesse social, gerenciamento de projeto, processo de projeto e desenvolvimento de novos produtos. Por fim, pode-se destacar a contribuição de pesquisas qualitativas (33%) e 83% de estudos empíricos, o que remete a afirmativa inicial de que a aplicação do custeio-meta na construção civil está em processo de maturação. Como contribuição, espera-se atualizar e expandir os estudos que já foram desenvolvidos no tema consolidando o eixo referencial do conhecimento
Palavras-chave: construção civil, gestão de custos, custeio-meta, bibliometria.
Abstract
The target costing approach can be characterized as effective strategy to equalize cost x price, quality and functionality. Developed in manufacturing industry, the application of these concepts in construction industry has growth and acquiring maturity. Then, this paper aims to analyze the scientific publications about the target costing in building construction in the last 5 years (2009-2013) in a bibliometric approach. As result, 36 papers were found with a significant participation of Brazil (16 papers or 53% of the sample). The principal sources of publications observed were the annual IGLC conference (36%) and events of ANTAC (ENTAC e SIBRAGEC, with 17%). The most frequently themes were target costing in context of social housing, project management, project process and development of new products. Finally, the qualitative research was used in 33% of sample, while 83% from this sample was empirical study. This information reinforces the maturity process which the target costing has been improving. With this paper, authors hope provide a vision about this theme in the building industry, consolidating and spreading it like a knowledge area.
Keywords: building construction, cost management, target costing, bibliometric analysis.
Tento em vista materiais potencialmente recicláveis no contexto urbano, o PET (polietileno tereftalato) já vem sendo utilizado em diversos segmentos industriais, porém este material, ainda é pouco utilizado na construção civil. Um estudo realizado pela Associação Brasileira da Indústria do PET (ABIPET) em 2011 revelou que houve um acréscimo de 304% na recuperação do PET de 1994 a 2011, totalizando cerca 294 Ktons cujo principal destino final foi aplicações nas indústrias têxteis (39,30%), não sendo contabilizada parcela de consumo para construção civil. Assim, o presente trabalho apresenta os resultados de uma pesquisa experimental desenvolvida com o intuito de testar o uso do PET triturado em substituição da areia natural nas frações de 15%, 30% e 45% para a fabricação de blocos de concreto prensado com incorporação de PET reciclado. Foram determinados às características geométricas, os índices físicos e características mecânicas, tais como massa seca, absorção de água, condutividade térmica e resistência à compressão. Ao serem analisados os resultados, pode-se concluir que o teor que apresentou os melhores resultados foi de 15% de PET, devido ao acréscimo de sua resistência à compressão em relação aos demais teores, destacando-se ainda uma menor absorção, resultante de seu maior empacotamento e melhor homogeneidade do compósito.
Palavras-chave: Bloco de Vedação, Sustentabilidade, PET
ABSTRACT
Among the materials with potential of recycle, the PET (polyethylene terephthalate), is widely used in different industrials sectors. However, the use of this recycled material in construction industry is insignificant. In 2011, a study conducted by Brazilian Association of PET Industry (ABIPET) revealed a growth of the level of recycling of PET in 304% between 1994 and 2011. In absolute numbers this represents about 294 kilotons. This result represents the second in recycling of PET around the world, just behind of Japan. The main application of PET recycled are performed in textile industry (39,30%) and the consumption by construction industry is so small that it was not recorded in survey. Thus, this paper aims to presents the results of an experimental research developed about the use of PET recycled replacing by volume of fine aggregate in fraction of 15%, 30% and 45%. The geometric, physical and mechanical characteristics were found, between them, the dry mass, water absorption, thermal conductivity and compressive strength. Can be conclude the content that replacing of 15% of PET achieved the best results due of the biggest compressive strength, lower of water absorption, resulting from its higher homogeneity and better wrapping of composite with PET recycled.
Keywords: Concrete blocks, Sustainability, PET.
O Gerenciamento do Valor Agregado (Earned Value Management, EVM) ou Análise do Valor Agregado (Earned Value Analysis, EVA) é uma técnica de medição e controle de projetos baseado na medição física, financeira e de tempo que proporciona indicadores de avanço real, variações de desempenho e previsões para conclusão do projeto. Entretanto, vários trabalhos científicos vêm descrevendo alguns problemas e limitações desta técnica como, por exemplo, a desconsideração dos fluxos de trabalho e a incompatibilidade de previsões em estágios iniciais de construção. Assim, através de um estudo de caso único, exploratório e descritivo, o presente trabalho tem por objetivo analisar o uso da técnica do EVM em um projeto de construção sob a óptica da construção enxuta. O estudo pode confirmar alguns problemas levantados em outros trabalhos, bem como expandi-los, proporcionando uma visão mais holística sobre a aplicabilidade desta técnica na construção civil, especialmente em obras cuja mentalidade enxuta é aplicada. Por fim, os autores concluem que a técnica do EVM é uma repetição da técnica de medição físico-financeira plotada no tempo e que suas limitações podem tornar o seu uso incompatível com projetos de construção.
Palavras-chave: Gerenciamento do Valor Agregado, Controle de Projetos de Construção, Construção Enxuta, Gerenciamento de Projetos.
ABSTRACT
The Earned Value Management (EVM) or Earned Value Analysis (EVA) is performance measurement technique and a project control tool based on physical, financial and time progress, providing indexes of project outcomes as actual performance, performance delays and forecasting at project conclusion. However some papers describe problems and limitations of this technique like disregard of workflows and incompatibility for early stages of work progress forecasts. Thus, through a unique case study exploratory and descriptive, this paper aims to analyze the use of EVM technique on a construction project under the lights of Lean Construction. As result, this paper confirmed some problems surveyed by others researchers as well as enlarged the list of topics which EVM approach fails to support of lean construction applications enabling a more depth and a holistic understanding about the applicability of this technique on Building Construction, especially in Lean Construction Projects. Finally, the authors concluded that EVM is just an extension of the traditional approach of measuring physical and financial advances over time what may render their use incompatible in construction projects.
Keywords: Earned Value Management, Construction Projects Control, Lean Construction, Project Management