It is snacking time at Work In Progress Wednesday.
A week ago, late Wednesday night, after blogging about the preparation I had made to sandwich and baste Trinity Green, I actually lined up and layered the backing, the wadding and the flimsy. It took me only three hours to crawl on the floor and baste the entire quilt! Believe it or not, I did not have any pain in my knees or a sore back the next day either!
Since then I have been feeding my Elna sewing machine with the sandwiched quilt:
Elna has munched her way through the 'snakes', the columns of triangles, and not brought anything back up - yet!
Working with the walking foot is much easier than I expected, and I now only need the time to work and this stitch-in-the-ditch job will be completed.
After that I will do some free motion quilting on the 'tagliatelle' strips. That part of the cooking might be a wee bit more difficult...