INTELLIGENT SYSTEMS: A STEP TOWARDS SMARTER ELECTRICAL, ELECTRONIC AND MECHANICAL ENGINEERING: Proceedings of 2nd International Conference on Industrial Electronics, Mechatronics, Electrical and Mechanical Power (IEMPOWER), 2021.
This study explores the time delay and cost overlap of building construction projects in East God... more This study explores the time delay and cost overlap of building construction projects in East Godavari using quantitative analysis. The qualitative analysis involves the identification of factors causing time delay and cost overlap of building construction projects by seeking the opinion of experts in the field of construction. A questionnaire survey was designed by considering the identified factors causing time delay and cost overrun of construction projects and the surveys were conducted from owners, contractors, and consultants. the factor analysis method was used to analyze the data in SPSS software. From the ranking, the top most factors were identified as factors causing time delay and cost overrun of construction projects. The degree of correlation between the owners, contractors, and consultants on ranking arrived using frequency index were computed using correlation analysis. The quantitative analysis was carried out to develop empirical models and to predict the quantum of time delay and cost overrun of building construction projects."
Uploads
Papers by Prasath Kumar