File:A2 CM cleanroom integration.jpg

Original file (6,245 × 4,430 pixels, file size: 16.9 MB, MIME type: image/jpeg)

Summary

Description
English: The crew module for NASA’s Artemis II mission is shown inside Kennedy Space Center’s Neil A. Armstrong Operations and Checkout Building on July 15, 2021. Artemis will lay the foundation for a sustained long-term presence on the lunar surface. NASA will use the Moon to validate deep space systems and operations before embarking on a human voyage to Mars.
Date
Source

https://www.nasa.gov/feature/next-generation-of-orion-spacecraft-in-production-for-future-artemis-missions

https://www.flickr.com/photos/nasakennedy/51368185845/
Author NASA/Kim Shiflett
Kim Shiflett    wikidata:Q117448892
 
Description photographer
Authority file
creator QS:P170,Q117448892

Licensing

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

Captions

Artemis 2 CM in work at KSC

Items portrayed in this file

depicts

0.004 second

55 millimetre

image/jpeg

ec05db41070431fd08678ed0f3dcf295f658114c

17,722,211 byte

4,430 pixel

6,245 pixel

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:40, 15 September 2021Thumbnail for version as of 09:40, 15 September 20216,245 × 4,430 (16.9 MB)Broken SoapUploaded a work by NASA PAO from https://www.nasa.gov/feature/next-generation-of-orion-spacecraft-in-production-for-future-artemis-missions https://www.flickr.com/photos/nasakennedy/51368185845/ with UploadWizard

The following page uses this file:

Metadata